Grays and Torreys Grays and Torreys Fourteeners # 30 and 31 Fourteeners # 30 and 31 June, 1958 June, 1958.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Repaso: Unidad 1 Lección 2
Repaso: Unidad 2 Lección 2
Homework Answers P. 570 P   28. 6 4. /9
Open Global Grants.
GOD IS IN CONTROL (Romans 8:28-39). And we know that in all things God works for the good of those who love Him, who have been called according to His.
AP STUDY SESSION 2.
1
1 Vorlesung Informatik 2 Algorithmen und Datenstrukturen (Parallel Algorithms) Robin Pomplun.
Kit Carson Fourteener # 51 August 29, Kit Carson from Crestone Needle.
Colorado Peaks between 13,800 and 14,000 after – Teakettle 1991 – Teakettle Thunder Pyramid – Failed to reach summit Thunder Pyramid.
ANTERO Fourteener #2 Fourteener #2 June 1955 June 1955 Led by Marvin Tinkle Led by Marvin Tinkle August 2, 2005 August 2, 2005.
Mount Massive Fourteener # 40 June 20, hours up, 3.5 hours return.
HARVARD Fourteener #17 Fourteener #17 June, 1957 June, hour climb 6.5 hour climb.
Colorado Peaks Climbed between 13,800 and 14, – Rio Grande Pyramid 1963 – Rio Grande Pyramid 1980 – Silverheels 1980 – Silverheels 1982 – Fletcher,
Shavona and Taberwash June 1956 Fourteeners # 5 and 6 Los Alamos Outdoor Association Trip led by Tom Stephenson.
Climbs 1963 – Grand Teton 1963 – Grand Teton 1978 – Quandary and Sherman – CL and EJ 1978 – Quandary and Sherman – CL and EJ 1981 – Snowmass.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
Thomas McGuire September, 06. South Rim Tourist Area South Rim Tourist Area 2.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt RhymesMapsMathInsects.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
1. PHOTO INDEX Bayside: Page 5-7 Other Colour Leon: Page 8-10 Cabrera Page Canaria Page Driftwood Page 16 Florence Florence and Corfu Page.
Break Time Remaining 10:00.
Chapter 4 Macromechanical Analysis of a Laminate Dr. Autar Kaw Department of Mechanical Engineering University of South Florida, Tampa, FL Courtesy.
Magali Pauzié Magali Pauzié
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Magali Pauzié Magali Pauzié
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
“And, Ye Fathers... ” Ephesians 6:1-5 Three Things God Wants A Father To Be One, A Follower of Christ (1 Timothy 2:4). Two, A Faithful Husband (Ephesians.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Midterm Review Part I Collinear: G, H, I Coplanar: G, H, F or H, I, F.
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Turnham Green Tube South Parade Bath Road Toilet Facilities in Church Hall Large Vehicle access just prior.
Turnham Green Tube South Parade Bath Road Toilet Facilities in Church Hall Large Vehicle access just prior to Esmond Road.
: 3 00.
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
Two Special Right Triangles
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
How to create Magic Squares
VICTORY.
Presentation transcript:

Grays and Torreys Grays and Torreys Fourteeners # 30 and 31 Fourteeners # 30 and 31 June, 1958 June, 1958

Greys Toreys

Torreys from Graves Torreys from Graves

Grays from Torreys Grays from Torreys

Schott, Taylor Mader

Greys Greys

OXFORD, BELFORD OXFORD, BELFORD Fourteeners # 32, 33 Fourteeners # 32, 33 July, 1958 July, hr to Belford, 1 hr Oxford, 4 hr return 4 hr to Belford, 1 hr Oxford, 4 hr return

Missouri Missouri Fourteener # 34 Fourteener # 34 July, 1958 July, hours up South Side, 2.5 hrs down 5.5 hours up South Side, 2.5 hrs down North Slope scree slope North Slope scree slope

HURON HURON August, 1958 August, 1958 Fourteener # 35 Fourteener # hours to top 3.5 hours to top

Jack Perrine climbing Huron

Capitol Capitol September 1, 1958 September 1, 1958 Fourteener # 36 Fourteener # 36 3 hr backpack, 7 hr up, 4 hr down 3 hr backpack, 7 hr up, 4 hr down

Capitol Cocks Comb Ridge

Capitol Peak Capitol Peak

VIEW FROM CAPITOL – Pyramid - Bells VIEW FROM CAPITOL – Pyramid - Bells

Bells Snowmass

Capitol Lake Capitol Lake

La Plata La Plata September, 1958 September, 1958 Fourteener # 37 Fourteener # hrs up, 2.5 hrs down 3.5 hrs up, 2.5 hrs down

La Plata – climbed right ridge La Plata – climbed right ridge

Ridge Climbed from Independence Pass Road Ridge Climbed from Independence Pass Road

Grizzly Peak Grizzly Peak

ELBERT ELBERT ELBERT

Ellingwood Ridge Ellingwood Ridge

Oxford, Belford Missouri - Crystal Lake Oxford, Belford Missouri - Crystal Lake

San Luis and Stewart San Luis and Stewart September 20, 1958 September 20, 1958 Fourteeners # 38 and 39 Fourteeners # 38 and 39 3 hr backpack, 5 hr to San Luis, 3 hrs to Steward, 3 hrs back 3 hrs to Steward, 3 hrs back to camp to camp

Gary Schott, Tom Stephenson, ? on Ridge

Top of San Luis Stewart from top of San Luis Stewart

View from Top Stewart View from Top Stewart San Luis

Hex Column Ridge San Luis