SwRR 4/28/2010 1 Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.

Slides:



Advertisements
Similar presentations
Software Process Models
Advertisements

1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) GSE Timothy Quinn.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project4.1.7 Dec 15’03 V 1 FSW Organization Chart FSW Lead J. J. Russell Project Manager (IPM) L. Klaisner Electronics & FSW Manager G. Haller.
JPL Autonomous Space Mission Simulation Flight Team Bob Hoffman Josh Ruggiero Adam Nikolic Dusty Terrill.
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
FIELDS iCDR Solar Probe Plus FIELDS Instrument CDR Introduction 1Peter Harvey.
CC20O7N - Software Engineering 1 CC2007N Software Engineering 1 Requirements Engineering Practices with Techniques.
Section 20.0 Mission Assurance Roger Counts Systems Assurance Manager ST5 PDR June 19-20, 2001 GSFC 5 Space Technology “Tomorrow’s Technology Today”
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
Barbara PlanteFIELDS iPDR – DCB Flight Software Solar Probe Plus FIELDS Instrument PDR DCB Flight Software Barbara Plante UC Berkeley SSL
SPP Spacecraft Emulator (SCE) Introduction
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
D. GordonFIELDS iCDR – DCB Solar Probe Plus FIELDS Instrument CDR DCB Dorothy Gordon Space Sciences Lab, UC Berkeley 1.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
T Project Review RoadRunners [IM1] Iteration
C. Ingraham5-7 March 2001Data Processing Unit IFR1NCKU UCB Tohoku ISUAL Data Processing Unit (DPU) C. Ingraham.
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Phase 3 The Software Requirements Specification. After review of the customer’s System Spec. After educated analysis Preliminary design A technical, software.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
Status 1 Telecon MAVEN PFFSW STATUS 8/14/2012 Conf: #
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
Strana 1MBA kurz informačního inženýrství INITIATE CONSTRUCT DELIVER MAINTAIN & SUPORT quality assurance, manage project, trainig&education, manage.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review RFAs and Recommendations Peter R. Harvey.
Operational Flight Software
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Overview of SOIS Electronic Data Sheets (EDS) & Dictionary of Terms (DoT) SOIS APP WG Fall 2012.
I&T&C Organization Chart
Acceptance Test Review
Electrical Ground Support Equipment Verification Test Support
CONTOUR NGIMS Electronics Test History
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
Our Process CMSC 345, Version 1/04.
Presentation transcript:

SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010

SwRR 4/28/ Telecon Agenda Requirements Definition Baseline Software Requirements Specification (SRS) Software Documentation Tree Requirements Partitioning for Phased Delivery (Build Plan) Testing Requirements Requirements Traceability Matrix (in SRS)

SwRR 4/28/ Telecon Documents Management Plans/Standards MAVEN-PM-RQMT-0006 (Mission Assurance Requirements) MAVEN-PM-PLAN-0021 (System Review Plan) MAVEN-SYS-PLAN-0020 (Software Management Plan) MAVEN-SYS-PLAN-0032 (Eng Peer Review Plan) NPR_ (Software Engineering Standard) NASA-STD (Software Documentation Standard) NASA-STD /1 (Software Quality Standard) NASA-STD-8715 (Software Safety) GSFC-STD-1000e (Gold Rules) MAVEN_PF_QA_002A_UCB_MAIP MAVEN_PF_SYS_009A_SEMP MAVEN_PF_SYS_011_CMP MAVEN_PF_SYS_012_RMP MAVEN_PF_SYS_006B_GoldRuleCompliance MAVEN_PF_SYS_008_PFDPUFlightSoftwareDevelopmentPlan

SwRR 4/28/ Telecon Documents Requirements/Specifications MAVEN-PFIS-RQMT-0016B.xls (Level 3) MAVEN_PF_SYS_010_FSWRequirements.xls (Level 4) MAVEN-SC-ICD-0007 (Spacecraft ICD) MAVEN_PF_SYS_004 (PF to Instruments ICD) MAVEN_PF_PFDPU_001C_DCB_Specification.doc MAVEN-PF-LPW-001E-Requirements_DOORS_Export.xlsx TBD - LPW ICD detailing commands & telemetry MAVEN Magnetometer Instrument Interface 7-April-2010.pdf MAVEN-PF-SEP-001a_Specifications.xls TBD - SEP FPGA Specification MAVEN-PF-STATIC-001A-Requirements_&_Specifications.xls MAVEN_PF_STATIC_012F_FPGA_Specification.pdf MAVEN-PF-SWEA-002_Requirements.xls MAVEN_PF_SWEA_012A_FPGA_Specification.pdf MAVEN-PF-SWIA-001g_Requirements.xls MAVEN_PF_SWIA_012B_FPGA_Specification.pdf

SwRR 4/28/ Telecon Documents Software Documents/Reports Preliminary plan MAVEN_PF_FSW_002_SRS (Software Requirements Specification) MAVEN_PF_FSW_003_SDD (Software Data Dictionary) MAVEN_PF_FSW_004_SAD (Software Architecture) MAVEN_PF_FSW_005_SID (Software Interface Design) MAVEN_PF_FSW_006_STP (Software Test Plan) MAVEN_PF_FSW_007_SUM (Software Users Manual) MAVEN_PF_FSW_008_SMP (Software Maintenance Plan) MAVEN_PF_FSW_009_SRD (Software Risk Database) MAVEN_PF_FSW_MPR_YYMM (Monthly Progress Report inc/ Metrics) MAVEN_PF_FSW_SVD_XXX (Software Version Descriptor) MAVEN_PF_FSW_STR_XXX_YYMMDD (Software Test Report) MAVEN_PF_FSW_SIR_XXX_YYMMDD (Software Inspection Report) MAVEN_PF_FSW_SCR_NNN (Software Change Request) MAVEN_PF_FSW_SPR_NNN (Software Problem Report) Review Packages (SwRR, SwPDR, SwCDR, SwATRR, SwAR) Sw Design Peer Review Packages (periodic) Sw Code Walkthrus (prior to each build delivery) PF Fault Management Design Peer Review (iCDR+90d) Test Procedures, GSE Display Definitions, Command & Telemetry Database files

SwRR 4/28/ Telecon Build Plan Software Products Boot FSW (PROM) Operational FSW (EEPROM) Generally developed in phases

SwRR 4/28/ Telecon Schedule

SwRR 4/28/ Telecon Test Requirements Test Platform : ETU Data Controller Board Initially ETU PFDPU when available Test Equipment: GSE PC GSEOS Software Spacecraft Simulation Instrument Simulation (w/ Good and Bad Data Sets) Logic Analyser Digital Scope Data Storage: All instrument data and housekeeping Command/Event logs Network access