New Nuclear at Darlington Environmental Assessment WELCOME TO Ontario Power Generations New Nuclear at Darlington Community Information Session Environmental.

Slides:



Advertisements
Similar presentations
STÒRAS UIBHIST LOCH CARNAN COMMUNITY WIND FARM. Loch Carnan Community Wind Farm Iochdar Hill was deemed to be most promising due to: Strong low cost grid.
Advertisements

ACT Canada TDM Summit Halifax| October, 2008 Telework Pilot : The City of Calgary.
Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Pickering B Refurbishment and Continued Operation EA Update Presentation to Pickering Community Advisory Council Nuclear Generation Development May 20,
New Nuclear at Darlington Environmental Assessment Laurie Swami, Director of Licensing, Nuclear Generation Development October 28, 2008 New Nuclear at.
Managing Nuclear Power Stations for Success
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
Module N° 7 – Introduction to SMS
Concession Agreement Tirana International Airport Nene Tereza
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Presentation to the Joint Review Panel Yellowknife General Hearing December 5 th, 2006 Dennis Bevington MP Western Arctic.
Proposed Quintette Mine Re-opening February 2011.
Indian Environmental General Assistance Program (GAP) Guidance on the Award and Management of General Assistance Agreements for Tribes and Intertribal.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Air Pollution Control « Air Pollution Control Ordinance » ( Chapter 311 ) The Air Pollution Control Ordinance(APCO) is the main legislative framework.
Steve Crawford, M.Sc Environmental Director 1. Overview and Background Tribal energy mission statement: To be 100% self- sufficient in energy, while safeguarding.
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
AMERICAN EXPERTISE AND TECHNOLOGY IN WASTEWATER AND WATER SECTOR WASTEWATER AND WATER INVESTMENTS IN TULCEA COUNTY, ROMANIA.
Loading and Unloading Students
EMS Checklist (ISO model)
Water Distribution Systems – Part 1
May 18, 2005 Oakdale Irrigation District Water Resources Plan.
Integrated Approach to Area Master Planning in Jubail Industrial City
Planning Commission April 14, 2010
Effectively applying ISO9001:2000 clauses 6 and 7.
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Environmental Assessment in Nova Scotia
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Determining the Significant Aspects
Transportation Engineering Name Title Company School, Date, or Other information on where you are making the presentation.
First Solar FuelSmart™: Powering Energy Security
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Federal EA and the Canadian Environmental Assessment Act, 2012 Presentation to the Bras d’Or Lakes Collaborative Environmental Planning Initiative (CEPI)
Murray River Project Update Coal Forum October 2013.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Slippery Slope
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
EXAMPLES OF DRAFT CSC CORE REQUIREMENTS. ConsultationCSC certification Siting Requirements Contact usOperational & Planning Requirements Slide 2 Reading.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Durham Nuclear Health Committee Mark A. Rohlehr Public Member- Pickering.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Integrated Assessment of Off-shore Wind A Research Partnership between: Grand Valley State University Michigan Alternative and Renewable Energy Center.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
Goldboro LNG Eastern Canada’s LNG Export Mar
Kiggavik Project Final Hearing Presentation
A division of Holcim (Canada) Inc. Public Information Session Proposed Extension of the Acton Quarry May 5, 2009.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Tom MAZOUR IAEA, Division of Nuclear Power
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Fifth Standard Solar Project Complex
Chicago to Council Bluffs-Omaha
Presentation transcript:

New Nuclear at Darlington Environmental Assessment WELCOME TO Ontario Power Generations New Nuclear at Darlington Community Information Session Environmental Assessment Fall 2008

1 Contents Tonights presentation will cover: The Project Roles, Responsibilities, Milestones Environmental Assessment Project Assumptions & Layouts Project – Environment Interactions 1 Contents Environmental Assessment (continued) Cumulative Effects Significance Criteria Feedback What We Are Hearing Input on Our Current Work

2 Describe the Project: Phases 2 The Project - Roles and Responsibilities The Project To construct and operate a new nuclear power plant at the existing Darlington site to meet the base-load electricity requirements of Ontario Ontario Power Generation (OPG) Is responsible for the federal approvals - an environmental assessment (EA) & site preparation licence The EA and licence application are for Up to four nuclear units Up to 4,800 MW of electrical capacity The EA must be completed before the site preparation licence can be issued A federally appointed joint review panel will review the EA and licence application OPG will be the operator for the new nuclear units at the Darlington site

3 Describe the Project: Phases 3 The Project - Roles and Responsibilities Infrastructure Ontario Leading a competitive process to select a nuclear reactor vendor to construct two units and potentially additional units Three internationally recognized vendors participating: Areva NP - US Evolutionary Pressurized Reactor (1600 MW) Atomic Energy of Canada Limited – ACR1000 Advanced CANDU Reactor (1200 MW) Westinghouse Electric Company – AP1000 nuclear power plant (1000 MW) End of 2008: Deadline for Phase 2 Submission 2009: Preferred Vendor Selected The Vendor will: Be responsible for construction, including hiring, purchasing, etc. Turn the reactors over to OPG when they are ready to begin operations

4 Upcoming Community Information Sessions OPG asked to begin federal approvals process for new nuclear Initial Site Preparation Licence – submitted Sept Project Description – submitted April 2007 Canadian Environmental Assessment Agency/Canadian Nuclear Safety Commission Determined that a Joint Review Panel will be established to review the documents Released for public review on September 4, 2008 Draft Environmental Impact Statement (EIS) Guidelines Draft Panel Agreement and Terms of Reference Comments due November 19, 2008 OPG Submits EIS and Site Preparation Licence Application, once guidelines are finalized Joint Review Panel Undertakes Public/Technical Review; Holds Public Hearing Issues Report to Federal Minister of the Environment 4 The Project – Roles and Responsibilities

5 Darlington New Build Project Description 5 Major/Indicative Milestones

6 6 Elements in the Environmental Assessment OPG has completed baseline data collection for most of the areas of study We are currently looking at project – environment interactions All of this will be documented in the environmental assessment

7 The Project – Principle Buildings & Structures

8 The Project - Conceptual Plant Layouts Conceptual layouts developed to provide for principle buildings and structures All provide for: Site access Switchyard Expansion Parking, Construction Facilities Soil Stockpiles, Lake fill, Land fill Used Fuel & Nuclear Waste Storage Layout 1: Four reactors and once through lake water cooling

9 Conceptual Site Layouts Layout 2 has mechanical draft cooling towers and two reactor units Mechanical draft cooling towers Main heat transfer to atmosphere Structure minimally visible off-site Very large land area required Layout 3 has natural draft cooling towers and two reactor units Natural draft cooling towers Main heat transfer to atmosphere Structure highly visible off-site Large land area required

10 Lake Fill Potential Lake Fill Lake Ontario shoreline along Darlington property From intake channel to Easterly limit of Darlington site EA Bounding Assumptions Approximately 100 metres into the lake on west side Approximately 450 metres on east side Approximately three million cubic metres, covering 40 hectares Provides Enhanced site security Additional lands for construction lay down Storage for excavated rock and soil Potential wildlife near shore habitat post construction

11 Project Description Bounding EA Timelines/Temporal Boundaries The dates shown are for EA study purposes. Actual start and in service dates have yet to be determined

12 Site Preparation Timeline: Approximately two years Workforce Up to 400 (100 on-site; 300 off-site) Activities Include: Mobilization Vegetation Removal/Earthmoving Soil/Rock Management up to 12 million cubic metres Infrastructure installation

13 Construction Timeline: Approximately six to eight years for two units Workforce: Up to 3,500 peak workforce for two units On-site parking Off-site parking may be used within five km of Darlington site, bus shuttles to transport workers Activities Include: Installation Reactor block, turbine generator, cooling system Construction Waste Management Marine/Road/Rail Considerations Concrete Supply

14 Operations Workforce & Procurement: Up to 1,400 per year for each set of two units Mid-Life Replacement or Refurbishment - peak workforce approximately 2,000 Procurement patterns similar to current Darlington Activities Include: Reactor Commissioning Safe plant operations Waste/Used Fuel transfer Mid-life major component replacement and/or refurbishment Timeline: Approximately 60 operating years for each set of reactors ( )

15 Project – Environment Interactions Matrix Component Potential Interaction Site Preparation ConstructionOperationDecom- missioning Aboriginal Interests * Aquatic Biota, Surface Water *** Atmosphere *** Geology, Hydrogeology, Seismicity **** Human Health *** Hydrology & Surface Water *** Land Use and Transportation ** Physical & Cultural Heritage * Radiation and Radioactivity ** Socio-economic Conditions **** Terrestrial **

16 Potential Environment Effects Atmospheric Environment Atmospheric Environment Air quality; noise Examples of Potential Effects During site preparation & construction phases: Off-site dust and vehicle exhaust emission Increased noise from traffic and equipment Dust and noise levels return to low levels during plant operation Localized fogging and icing from mechanical draft cooling towers (if used)

17 Potential Mitigation Measures Atmospheric Environment Potential Mitigation Measures Dust management plan for site preparation and construction phases, assumed to include: Watering for dust control Paved versus unpaved roads Different aggregate grades for road construction Slope stabilization (e.g. hydro seeding) Noise Ensure construction equipment is well maintained Proactive communication with community Vehicle operating restrictions Off-site dust / vehicle exhaust/ noise effects Routine monitoring and notification

18 Potential Environmental Effects Socio-Economic Conditions Socio-economic environment: Community character, economic studies, recreational users, municipal finance, etcetera Examples of Potential Effects: Nuisance effects to adjacent neighbours Disruption of some on-site recreational facilities Increased demand for municipal services and housing Creation of direct, indirect and induced employment opportunities Increased municipal revenue

19 Potential Mitigation Measures Socio-Economic Conditions Potential Mitigation Measures Monitor neighbouring properties for nuisance effects Replace or offset loss of recreational uses on and off the Darlington site Support construction and trades recruitment and training initiatives Enhanced apprenticeship programs

20 Projects to Consider in Cumulative Effects Cumulative Effects Assessment 20

21 Cumulative Effects Assessment Projects 407 East Extension Region of Durham Energy from Waste Facility Development within Clarington Energy Park Oshawa Ethanol plant St. Marys Alternative Fuels Project Pickering Airport Refurbishment of existing Darlington Nuclear Generating Station Future 401 widening Studies and Plans Durham Region Water and Wastewater Master Servicing Strategy

22 Significance of Residual Environmental Effects Criteria typically include: Magnitude of effect Geographical extent of the effect Timing, duration, and frequency of the effect Degree to which effects are reversible or mitigable Ecological and social/cultural context Probability of occurrence Existing regulatory and industry standards are used as points of reference. Professional expertise and judgment are also applied.

23 Feedback Weve Received Community Information Sessions 600 visitors to date Most Important Environmental Features are: Drinking and lake water quality Atmospheric environment, air quality Human health considerations Nuclear emergency infrastructure and preparedness Transportation system safety and road traffic volumes & safety

24 Feedback Weve Received Community Kiosk: 500 visitors Benefits the project will bring to the area How to secure employment Importance/Value of the Kiosk Timing of Key Events When will construction, operations start? When will decisions be made? Community Events/Displays 5,000 visitors 50% of the comments: Nature of the EA studies, Strong project support 50% beyond OPGs responsibility: Vendor selection, Ontarios electricity system, etcetera

25 Upcoming Community Information Sessions Were here to answer your questions. We want your input on: Mitigation measures to address potential effects of the project Project to consider for the cumulative effects assessment Criteria to assess significance of effects Comment and evaluation forms are available – please take a minute to fill them out before you leave! 25 Thank you for participating!

Contact Us 26 Contact Us