Good Things Take Time – Building up an O&D-Forecaster Stefan Poelt Presentation to the AGIFORS RES & YM Study Group Berlin, 16 - 19 April 2002.

Slides:



Advertisements
Similar presentations
CH 4: Finding Your Unique Selling Point 14 January 2014 Lectured by: OR Vitou.
Advertisements

CMGC Contracting at UDOT Program, Projects & Lessons Learned
PROJECT RISK MANAGEMENT
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
© copyright Amadeus GTD S.A. / all rights reserved / unauthorized use and disclosure strictly forbidden New Generation Inventory Jean-Michel Sauvage.
Chapter 5 Planning - To Set Direction
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Integration of Pricing and Revenue Management for a Future without Booking Classes AGIFORS Reservation and Yield Management Study Group Annual Meeting,
Project What is a project A temporary endeavor undertaken to create a unique product, service or result.
o & d Forecasting for O & D Control
Revenue Management Tutorial
Multi-Channel Revenue Management Shankar Mishra & Vish Viswanathan AGIFORS RYM Study Group Berlin, April 2002.
IT integration in airline business process ITAB 2007 Grach Muradyan.
5/25/2015 Operations Research Group Continental Airlines Bridging Schedule Changes When Bookings Exist Judy Pastor Continental Airlines AGIFORS YM 2002.
Systems Analysis and Design 8th Edition
The Role of Software Engineering Brief overview of relationship of SE to managing DSD risks 1.
1 presented by: Tim Haithcoat University of Missouri Columbia QA/QC and Risk Management.
Chapter 1 Software Development. Copyright © 2005 Pearson Addison-Wesley. All rights reserved. 1-2 Chapter Objectives Discuss the goals of software development.
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
Stoimen Stoimenov QA Engineer QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
1 Maximizing Revenue with a Leg Revenue Management System E. Andrew Boyd Vice President, Research and Design PROS Revenue Management.
Project Planning Day 2 An Old Adage: Fail to Plan... and You Plan to Fail!
Planning. SDLC Planning Analysis Design Implementation.
November 8, 2000 A debriefing report Integration of Canadian Airlines Jacques Cherrier November No.
This chapter is extracted from Sommerville’s slides. Text book chapter
1 O&D Forecasting Issues, Challenges, and Forecasting Results John D. Salch PROS Revenue Management, Inc.
Software Testing Lifecycle Practice
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
Fundamentals of Planning
MIT ICAT ICATMIT M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Virtual Hubs: A Case Study Michelle Karow
Software Development Process and Management (or how to be officious and unpopular)
Constrained Forecast Evaluation (CFE) Ronald P. Menich AGIFORS Res & YM 2-5 June 2003 HNL.
How to convince crew planners to use an automatic rostering tool (ACA) Crew Management Study Group 2006 Conference Honolulu, April , 2006.
Software Engineering Management Lecture 1 The Software Process.
1 Project Risk Management Project Risk Management Dr. Said Abu Jalala.
University of Virginia Software Development Processes (CS340 John Knight 2005) 1 Software Development Processes.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
1 Messages Communication Conseil About Flight Firming and Revenue Management.
New York 2000 Jacques Cherrier PNR database at AC Implementation overview and its usefulness for Network Management.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
O&D Demand Forecasting: Dealing with Real-World Complexities Greg Campbell and Loren Williams.
INFO425: System Design INFORMATION X Chapter 8 Evaluating Alternatives for Requirements, Environment, and Implementation Evaluating Alternatives.
Agile Concepts - II “Agile” Estimating & Planning Nupul Kukreja 5 th November, 2014.
Process Walk & SIPOC Define Kaizen Facilitation. Objectives Understand the process as a “system” Describe the concept of an entity and how it relates.
How a small airline copes with Change as a way of life 2001 Agifors Reservation and Yield Management Conference Thomas Kingsbury Blackcreek, Ltd.
O-D Control Abuse by Distribution Systems: PODS Simulation Results Dr. Peter P. Belobaba International Center for Air Transportation Massachusetts Institute.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
1 Arjan Westerhof 04 June 2016 Implementing an O&D System at KLM March 23, 2000 Arjan Westerhof Agifors yield management study group.
Time Effect on Project Planning and Budgeting ‘Jide Onademuren.
Route and Network Planning
CSC480 Software Engineering Lecture 5 September 9, 2002.
Improving Revenue by System Integration and Cooperative Optimization Reservations & Yield Management Study Group Annual Meeting Berlin April 2002.
Software Project Management Lecture # 2 Originally shared for: mashhoood.webs.com.
Work Hard. Fly Right. SM Work Hard. Fly Right. SM A NETWORK ORGANIZATION AGIFORS Conference Honolulu, HI June 3 – 5, 2003 Mandeep Grewal MANAGING DIRECTOR.
CS 5150 Software Engineering Lecture 2 Software Processes 1.
HNDIT23082 Lecture 06:Software Maintenance. Reasons for changes Errors in the existing system Changes in requirements Technological advances Legislation.
Lufthansa Update on LH´s Path of O&D Control AGIFORS, New York, March 2000 Werner Tauss.
Lufthansa Looking for Feedback Performance Measurement in Revenue Management Stefan Pölt Lufthansa German Airlines AGIFORS Reservations & Yield Management.
1 Chapter 12 Configuration management This chapter is extracted from Sommerville’s slides. Text book chapter 29 1.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
Speech Processing 1 Introduction Waldemar Skoberla phone: fax: WWW:
Software Engineering CE 501 Prepared by : Jay Dave.
Impacts of implementation of 4PM Vesna Kobal, Arctur d.o.o. Rijeka, april 2014.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
Solutions for demanding business City, date 1 How can Open source technologies help to reduce the cost of development?
How does a Requirements Package Vary from Project to Project?
Lecture 06:Software Maintenance
Software Testing Lifecycle Practice
ATC 2019 Beijing How to Unite Revenue, Personalization and Happy Customers in Harmony Gert Hartmans Data driven pricing of ancillary seating As ancillary.
Presentation transcript:

Good Things Take Time – Building up an O&D-Forecaster Stefan Poelt Presentation to the AGIFORS RES & YM Study Group Berlin, April 2002

O&D Forecaster page 1 Agenda What’s the scope of our O&D project ? Some traps to watch O&D Forecaster system overview What’s the current status ? How does a perfect project look like ? Happy end !

O&D Forecaster page 2 How does a perfect project look like ? A perfect project Is in time Is in budget Covers the scope Delivers quality Our project Is not quite in time Is in budget Scope has been adjusted Delivers quality

O&D Forecaster page 3 What’s the scope of our O&D project ? O&D Forecasting Detailed level Individual pax / groups Gross bookings / cancellations Aggregation of ‘exotic’ O&Ds Implemented by Lufthansa Systems Berlin PNR-based No-show Forecasting PNR attributes Decision tree learning Mixed with traditional no- show forecasts No decision about vendor O&D Optimization Benchmark study Project stopped after 11 Sep 2001 Re-activation in 2003 Implemented by CRSs Married Segment Control Prevents cheating Implemented at Inventory Dept. Coordination task

O&D Forecaster page 4 Simple vs. complex forecast method Separation of individual and group bookings Separation of gross bookings and cancellations Flexible aggregation of low demand traffic flows Complex methods are more difficult to calibrate Complex methods can better model reality Trade-off between accuracy and stability Pilot‘s Weather Forecast Station Stone is wet Stone is dry Shadow at ground White on top Stone can’t be seen Stone swings Stone is hopping Stone disappeared Rain No rain Sunny Snow Fog Stormy Earthquake Blizzard

O&D Forecaster page 5 Better no-show forecasts allow better overbooking Traditional no-show forecasts are based on booking class and routing PNR is a richer data source (e.g. ticketing info, special service request etc.) ‘There’s gold in the PNR data mine’ (Louis Busuttil, PROS Conference 1997) ‘PNR-based no-show forecast’ (Klaus Weber, AGIFORS Conference 2000) PNR-based methods can be applied to booked passengers only - they must be mixed with traditional no-show forecasting PNR-based methods (e.g. decision trees) can also be applied to cancellation forecasting

O&D Forecaster page 6 O&D forecasting without O&D optimization Intermediate step: O&D forecasts aggregated to leg-level and used in leg-optimization Better quality of leg demand forecasts Better quality of (PNR-based) no-show forecasts  lower overbooking risk O&D information, better understanding of travel flows Better communication and co-operation with Pricing and Scheduling / Flight Planning

O&D Forecaster page 7 Reasons for delay Too optimistic project plan Internal staffing (6-7 project members, 4 users – part-time) Under-estimation of noise in PNR data Frequent change of project management Scientific driven project – late involvement of users Research and calibration effort for new topics (e.g. cancellations) Re-organizations 11. September 2001

O&D Forecaster page 8 Renaming the project does not help There were plans to rename the project to ‘O&D-Forecaster’ This might help to confuse controllers but does not help to solve the problems Project name: ‚Bid Price 2‘ Original scope was adjusted, O&D-optimization was stopped after 11. September 2001

O&D Forecaster page 9 Shit happens There are many situations where something can go wrong The business processes haven’t been addressed at the beginning Later on we realized that important functionalities are missing Noise and complexity of PNR data have been under-estimated Aggregation of no-show information from O&D to leg is problematic

O&D Forecaster page 10 A precise specification avoids complaints later-on Innovative IT-projects require a lot of research Alternation of research and prototyping / implementation We decided to refine the specification during the project Problems keeping specification and documentation up to date Testing with ‘fuzzy’ specification is challenging You‘ve built it up reversed !

O&D Forecaster page 11 A good documentation is important Documentation often is prioritized down Good documentation improves user’s confidence 3 documents: –system administration –user manual / online help –process / workflow PRESS ANY KEY

O&D Forecaster page 12 In a perfect project: Project managers have the right perspective Focusing on the most important topics Understanding the subject (RM and Forecasting) Good communication and motivation skills Currently 2 project managers, one focusing on management, the other focusing on methods - learning from each other

O&D Forecaster page 13 In a perfect project: Motivation of the project team is not an issue Working for years on the same thing is boring We are the 4. generation of project managers The project survived 2 re-organizations Increase motivation by changing responsibilities Success is the best motivator !

O&D Forecaster page 14 Our new toy

O&D Forecaster page 15 Aggregation solves the small numbers problem There are many low traffic O&Ds 20:90 rule - 20% of all O&Ds cover 90% of the traffic Flexible aggregation of low traffic O&Ds is a key factor

O&D Forecaster page 16 Effects of schedule changes are handled automatically A major schedule change can affect thousands of O&Ds Concept of Lufthansa Systems Berlin handles new, moved and cancelled flights Demand is automatically adjusted based on ‘neighbored’ flights/paths ‘Distance’ to neighbored flights mainly depends on departure and arrival times Approximation of market (passenger choice) model new flight neighbored flights flight Aflight B flight C dist(A,C)dist(B,C)

O&D Forecaster page 17 This year we will take the last hurdle Forecast quality (aggregated to leg-level) is better than for current system Data loading performance is o.k. Business processes have been re- designed and matched with the tool Flight by flight migration of new forecast system (Jun - Nov 2002) minimizes risk Business re-organization will go hand in hand with migration Parallel project of O&D-reporting is started Married Segments Control is implemented in Amadeus and Galileo

O&D Forecaster page 18 The forecast results are very promising Validation of O&D-forecaster at representative test flights Distinction of open and closed flights to separate unconstraining effects Open flights are less important but have reliable actual values Booking period departure

O&D Forecaster page 19 Happy end ! The O&D forecaster will be completely in operation this year Very good cooperation with Lufthansa Systems Berlin O&D not always means Odd & Delayed !