Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Basic Setting Out.
Chapter 3 Topographic Maps
Chapter 3 Topographic Maps
Contour Lines.
Ch 3. Combinations of Horizontal and Vertical Alignment Use a few criteria to identify good and bad H- and V-alignment combinations Avoid unfavorable H-
Investigation of canal structures Session objectives –Spell out the purpose of CM & CD works –Describe the procedure for preparation of site survey plan.
Optimum Design in Rural Roads Introduction. Optimum Design in Rural Roads ….1 Introduction to topic: What is intended to be discussed? Optimum and/or.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
PowerPoint Presentation
Profile Leveling.
3. 5 Combinations of Horizontal and Vertical Alignment (p ~ p
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Topographic Surveying Survey2 Notes of AM Fillone, DLSU-Manila.
Topographic maps show…. - USGS: Uses for topographic maps… -
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Surveying Survey measurements can be represented graphically: diagrams; maps; profiles; and cross sections. And to determine: locations; directions; areas;
Austin, TX N.W. Garrick April 2008 CE 254 Highway Design Project Spring 2008.
E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey.
Faculty of Engineering Technology
Chapter #1: Basics of Surveying
S.H.H.S Building Construction
TOPOGRAPHIC MAP.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Chapter 14 Legal Descriptions and Site Plan Requirements.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
Surveying Techniques I. The USGS supplies 1:24,000 scale maps for all the U.S. But detailed topography at larger scales is rare and/or.
TECHNIQUES IN BASIC SURVEYING
CE303: Introduction to Construction Blueprint Lab.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Highway Route Surveys And Location
Landform Drawings Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
CE303: Introduction to Construction Blueprint Lab.
After UNIT VII you should be able to:  Interpret major topographical features such as hills, river valleys, and depressions  Accurately draw contour.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Mountain Navigation. Strategies for safe navigation Errors do occur. Re-location. The navigator should have a number of strategies to allow the recognition.
Unit: Introduction to Land Surveying Lesson: Methods of Surveying
Mapping. What is a map? It is a representation of something (Earth, stars, solar system, a building, etc… It is a representation of something (Earth,
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
INTRODUCTION TO SURVEYING
1 Applications Stream cross sections Highways Canals Sewers Water mains Sidewalks Retaining walls Fences Application of Differential Leveling Introduction.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
PowerPoint Presentation
Investigation of Road Project By S.N. Nanaware
Chain survey
Profile Leveling.
Investigation of Road Project
Visit for more Learning Resources
CONTOURING.
Contour Lines Sbmitted By: Pramit Sharma R.B.S E.T.C Bichpuri Agra.
CONTOURS Engr. Randy G. Policarpio. Definitions: Contour – an imaginary line of constant elevation on the ground surface. Contour line – a line on the.
Highway Geometric Design Combination of Vertical and Horizontal Alignment.
SURVEYING – II INRODUCTION OF CONTOUR
Watersheds.
Route Location 01 Reference: Nicholas J. Garber, Lester A. Hoel, TRAFFIC AND HIGHWAY ENGINEERING, Fourth Edition Ch. 14, page 691.
INTRODUCTION OF GEOMATIC
Topographic Survey Introduction „ Mapping surveys are made
Chain survey By :- Parveen Kumar.
Topographic Survey Introduction „ Mapping surveys are made
Watersheds.
CONTOURING.
CONTOURING.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic maps and sometimes an airplane to search out feasible routes and determine such primary controls as mountain passes or suitable river crossings and to locate major obstacles such as steep slopes or marshes 2) The second step: Reconnaissance of feasible routes for rough measures of relative length, difficulty, and cost 3) The third step: Running in the preliminary or P line, or two or more alternate lines on the maps 1 Thursday, September 10, 2015

Location Surveys 4) The fourth step: laying out the final location or alternate locations by study of the maps and profiles after the P line data being plotted 3. Critical slopes were measured with a hand level; distances and angles commonly were measured by transit and taping methods; and a profile was taken by differential leveling. II. *Modern location practice 1. Office oriented but parallel to the traditional one 2. Based on photogrammetric techniques 3. Field work: aerial survey and ground control; checking out incomplete data on the photographs or maps, and soil surveys and subsurface exploration. 4. Procedures of location survey: (1) area reconnaissance; (2) route reconnaissance; (3) preliminary location; (4) final location. 2 Thursday, September 10, 2015

Location Surveys III. * Preliminary Reconnaissance (area and route) 1. Purposes: to determine which routes deserve further study, i.e., the primary and secondary controls for one or more feasible routes within a band of limited width 2. Primary controls: terminals of the road; vital intermediate points; a unique bridge site; single mountain pass 3. Secondary controls: small settlements for a major highways; drainage systems; mountain passes; low points in ridges; swamps in low country; cost factors like soil conditions; the numbers and sizes of structures; the amount of excavation and embankment 4. Likewise, for scenic highways, the positions of timbered areas, waterfalls, lakes, and other attractions may be primary controls and for artery highways, they may be secondary controls or not at all. 3 Thursday, September 10, 2015

Location Surveys V. *Preliminary Location 1. Procedures: 1) Establishing preferred location within a reasonably narrow band; 2) Determining a preliminary line; 3) Reducing the survey data to maps and profiles to a scale of 100 ft to 1 in. 2. Procedures for rural multilane facilities 1. Separate highways for opposing directions can result in an most advantageous location: opposite walls of a canyon or opposite sides of streams or small hills; variable median width; different alignment and grade line; cheaper than for a constant cross section; more pleasant and less monotonous driving; entire eliminating of headlight glare Separate highways constant cross section 4 Thursday, September 10, 2015

Location Surveys VI. *Final Location 1. The determining of the details of the projected highway by 1) Shifting the line and adjusting grade; 2) Setting final horizontal and vertical positioning of structures, channels, and other drainage facilities; 3) Coordinating horizontal and vertical alignments; 4) Referring sufficient curvature, tangency, and other control points on the ground to permit easy location of the line; 5) Setting bench-marks at relatively close intervals and in positions free from disturbance in construction; 6) Establishing directions of all property lines, distances to property corners, and the locations of buildings, fences, and facilities 5 Thursday, September 10, 2015

Location Surveys VI. Final Location 7) Preparing for large-scale topographic maps or other special surveys at bridge and structure sites; 8) Taking into account soil surveys and foundation explorations for structures VI. Homework 1. What are taken into consideration in a preliminary reconnaissance? 2. What details are determined in a final location? 3. True or false statements (refer to pp in the synoptic textbook) 4. Use a table form to illustrate the difference between preliminary reconnaissance, preliminary location, and final location. 6 Thursday, September 10, 2015