Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008.

Slides:



Advertisements
Similar presentations
Project management software is a term covering many types of software, including scheduling, cost control and budget management, resource allocation,
Advertisements

Teaching Students Project Management Dr. Bill Oakes, EPICS Director Pamela Dexter, EPICS High School Coordinator 2011.
TIME MANAGEMENT 641 Topic 03 Activity Sequencing.
Work Breakdown Structures
PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
PROJECT SCHEDULE PROJECT SCHEDULE Able to : a)Produce a network diagram based on the activities in a construction work b)Produce a network.
Chapter 10: Project Schedule Planning
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
3-1 Planning the Project. 3-2 If a Problem Occurs During a Project Is It Most Likely Due to: 4 A) Poor Execution 4 B Poor Planning.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Teaching Project Management Mauricio Gonzalez (M.Sc) Frederick Douglass Academy, NYC Roy B. Melton, Purdue University 2010.
MEM 612 Project Management Chapter 3 Planning the Project.
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Action Implementation and Evaluation Planning Whist the intervention plan describes how the population nutrition problem for a particular target group.
Project Management Session 7
OPERATIONS MANAGEMENT for MBAs Fourth Edition
Jump to first page 30/06/ Chapter 1 System Development Environment.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Work breakdown structure
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
What’s a Project? AD642. Copyright 2011 John Wiley & Sons, Inc. Why the Emphasis on Project Management? 2 ❑ Many tasks do not fit neatly into business-as-usual.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Geog 469 GIS Workshop Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
1 These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 5/e and are provided with permission by.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Statement of the Work SOW By: Wilmer Arellano FIU Summer 2007 (Updated)
By Wilmer Arellano Fall 2009
Project Management Theory. Planning a Project Identify the problems and inefficiency of system. – Design brief Design brief: A statement that contains.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
SOW / Open Workbench By Wilmer Arellano Summer 2013.
Statement of the Work SOW
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Statement of the Work SOW By: Wilmer Arellano FIU Fall 2007.
SOW / Open Workbench By Wilmer Arellano Fall 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
SOW / Open Workbench By Wilmer Arellano Fall 2010 Wilmer Arellano © 2010.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
SOW / Open Workbench By Wilmer Arellano Fall 2008.
WEEK 3 Project Planning.
The Project Management Process Groups
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Overview of Software Project Management cont Review – Class 6 Scheduling Tasks Project Management Activities CEN 4010 Class 8 – 09/22.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
By Wilmer Arellano Spring 2010
Planning the Project.
Chapter 3 Managing the Information Systems Project
System analysis and design
Project Management Process Groups
Modern Systems Analysis and Design Third Edition
By Wilmer Arellano Fall 2010
By Wilmer Arellano Summer 2013
Modern Systems Analysis and Design Third Edition
Presentation transcript:

Statement of the Work SOW By: Wilmer Arellano FIU Spring 2008

Overview  Strategy Plan of Action Statement of Work (SOW) Work Breakdown Structure (WBS) Project Milestones Results Evaluation

References Some Excerpts from the book:  Karl T Ulrich and Steven D. Eppinger. (2004). Product Design and Development. Third Edition. Mc Graw Hill, Irwin. ISBN-13: Some Excerpts from the book  “Engineering Design, a Project Based Introduction”, second edition by Clive I. Dym and Patrick Little. John Wiley and Sons, Inc. ISBN us/assistance/HA aspx#Step%201

Project management Project development involves:  many people  many different tasks. Successful Project development projects result in:  high-quality;  low-cost products  efficient use of time,  money,  and other resources. Project management is the activity of planning and coordinating resources and tasks to achieve these goals.

Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle. Certain areas that need to be addressed are as follows:  Scope of Work, Describes the work to be done in detail and specifies the hardware and software involved and the exact nature of the work to be done.  Location of Work, Describes where the work is to be performed. Specifies location of hardware and software and where people will meet to perform the work.  Period of Performance, This specifies the allowable time for projects, such as start and finish times.  Deliverables Schedule, This part list the specific deliverables, describing what and when it is due.  Who is responsible for what.

Statement Of Work (SOW) Example you need to repair your home after damages by a hurricane:  Scope of Work, Repair roof tiles, plant trees, paint house.  Location of Work, In your home, the roof, backyard and external walls.  Period of Performance, One week starting 01/28/08.  Deliverables Schedule, 50 roof tiles will be change, new water proofing installed, 3 trees will be planted, 2000 sqf. of surface will be painted.  A crew of three will repair the roof in two days, a crew of two will paint the home in three days and plant the trees in one day.

Work Breakdown Structure (WBS) The WBS is the hierarchical list of the project's phases, tasks and milestones  Phase: A group of related tasks that completes a major step in a project.  Task: An activity that has a beginning and an end. Project plans are made up of tasks.  Milestone: A reference point marking a major event in a project and used to monitor the project's progress. The WBS is critical because it drives the scope Scope: The combination of all project goals and tasks, and the work required to accomplish them.  The scope translates into the timeline and budget. Budget: The estimated cost of a project. Taking the time to map out the WBS will save you significant time later by helping you to avoid rework and false starts. us/assistance/HA aspx#Step%201

Work Breakdown Structure (WBS) The WBS may describe:  the activities of the project or Activities speak to the work involved in the project,  of its deliverables. Deliverables speak to end results. If activities, then the WBS is expressed by sentences commencing with verbs, but if deliverables, then the entries are expresses as nouns. We will base our WBS on deliverables. Please make that clear in your WBS

Work Breakdown Structure (WBS) The 100% rule  is one of the most important principles guiding the development, decomposition and evaluation of the WBS. The rule applies at all levels within the hierarchy: the sum of the work at the “child” level must equal 100% of the work represented by the “parent” and the WBS should not include any work that falls outside the actual scope of the project, that is, it cannot include more than 100% of the work  If the WBS designer attempts to capture any action-oriented details in the WBS, he/she will likely include either too many actions or too few actions. Too many actions will exceed 100% of the parent's scope and too few will fall short of 100% of the parent's scope. The best way to adhere to the 100% Rule is to define WBS elements in terms of outcomes or results. The Practice Standard for Work Breakdown Structures (Second Edition), published by the Project Management Institute (PMI)Project Management Institute e

Work Breakdown Structure (WBS) This is what we want Deliverables based WBS tructure

Documenting (WBS) Phase 1.1-Antenna Design  Objective: To produce a 50 Ohm input impedance antenna with a power handling capability of 100 Watts with minimum cost and a minimum power gain of 3 dB  Approach: Two method will be used and compared to select the more economical design. Method 1 will consist of the recently acquired Antenna Design Software and method 2 will be based on newly published formulas by A. Jones [4]  Expected Results: A fully functional transmit antenna with accompanying literature and mounting hardware. This phase will consist of the following tasks:  Antenna Design  Antenna Construction  Antenna Testing Remember this is a deliverable based description

Project Timeline/ Sequential Tasks Tasks are sequential when they are dependent on the output of another task. These because the dependencies impose a sequential order in which the tasks must be completed. We do not necessarily mean that the later task cannot be started before the earlier one has been completed

Project Timeline/ Parallel task Two tasks are parallel when they are both dependent on the same task but are independent of each other.

Project Timeline/ Coupled tasks Coupled tasks are mutually dependent; each task requires the result of the other tasks in order to be completed. Coupled tasks either must be executed  simultaneously with continual exchanges of information or  must he carried out in an iterative fashion.

Gantt Charts The traditional tool for representing the timing of tasks is the Gantt chart. The filled-in portion of each bar represents the fraction of the task that is complete. The vertical line shows the current date, so we can observe directly that task D is behind schedule, while task E is ahead of schedule.

Gantt Charts

Milestones Examples:  Prototype Implementation.  Testing.  Documentation.  Demonstration. Each Milestone should be explained with a sentence or two

PERT Charts (program evaluation and review technique) PERT (program evaluation and review technique) charts explicitly represent both dependencies and timing, in effect combining some of the information contained in the DSM and Gantt chart.

The Critical Path The dependencies among the tasks in a PERT chart, some of which may be arranged sequentially and some of which may be arranged in parallel, lead to the concept of a critical path. The critical path is the longest chain of dependent events.

BUDGET (Task Cost)

BUDGET

Class Assignment 1 Elaborate SOW of your Senior 1 Project Include:  Follow Style Guidelines  Include TITLE PAGE AND CONTENTS  WBS (using 100% Rule)  Design Structure Matrix  Gant Chart  Pert  Critical Path

Review Intellectual Property Considerations Standards Considerations  Strategy Plan of Action Statement of Work (SOW) Work Breakdown Structure (WBS) Project Milestones Results Evaluation

Software Primavera Open Workbench MS Project

& & Q uestions A nswers