1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,

Slides:



Advertisements
Similar presentations
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Advertisements

Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
X Meeting of the Future Linear Colliders Spanish Network10-Feb-2014 Enrique Calvo Alamillo.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
Micromegas for a DHCAL LAPP, Annecy Catherine Adloff Jan Blaha Sébastien Cap Maximilien Chefdeville Alexandre Dalmaz Cyril Drancourt Ambroise Espagilière.
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Tracking within hadronic showers in the SDHCAL Imad Laktineh.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
C. Combaret TILC april m2 GRPC Acquisition System C. Combaret, IPN Lyon For the EU DHCAL collaboration
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Semi Digital HCAL Data analysis results Robert Kieffer Institut de Physique Nucléaire de Lyon 10/02/
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.
Marcello Abbrescia Muon general meeting, Mon 29-Apr p. 1 R&D on improved RPCs for phase 2 upgrade M. Abbrescia on behalf of the RPC upgrade group.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Concept Design for LBNF Far detector (LAr single phase)
CALICE calorimeters Power Issues Kieffer Robert IPN Lyon « Linear Collider Power Distribution and Pulsing workshop » May 2011, LAL
1 Short Status of TB Analyses in SDHCAL Imad Laktineh.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
1 Construction of technological semi-digital hadronic calorimeter using GRPC Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
GRPC development in Lyon
European DHCAL Meeting 13/06/08
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
Enrique Calvo Alamillo DAEGU
CEPC 数字强子量能器读出电子学预研进展
A proposal to equip the high eta muon stations with High Rate GRPC
IHEP group Shashlyk activity towards TDR
detector development readout electronics interconnects bump bonding
Status of Ecal(s) for ILD
(My personal) CALICE Report
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
10/month is the present production rate 2 FTE + sporadic contributions
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Status of CEPC HCAL Optimization Study in Simulation LIU Bing On behalf the CEPC Calorimeter working group.
Presentation transcript:

1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis

2 Outline Preparation for the prototype construction

3 Beam gas The prototype will be made of 40 units. Each unit is made of : 2 cm absorber cm sensitive medium 1 cm 2 transversal granularity This is about 5 λ I and channels  Self-supporting mechanics  Minimized dead zone  Minimized thickness  One-side services  Power pulsed electronics The Technological prototype We intend to validate the SDHCAL concept by building a prototype which is as close as possible to the proposed SDHCAL for ILD The modular structure we propose makes it possible to increase the number of units up to 48

4 Mechanical structure : Self-supporting The structure is built using the absorbers. Each of them is 1.5cm thick and with lateral dimensions of x cm2 Spacer thickness: 13 mm

5

6 The material type : stainless steel 304L ( measured permeability had a maximum value of 1.5  This allows to use the SDHCAL prototype in 4-Tesla magnet Tolerance : ± 50 µm on the thickness and 250µm maximum on the planarity of the surface. Quality control during the mass production of the plates will include verification by the company, both of the thickness and the planarity, and then a crosscheck will be performed at CIEMAT by using a laser interferometer system ((Precision of the system about the µm for the planarity measurement). Mechanical structure

7

8 A first assembly test has been performed at CIEMAT using bare and specific tools for the handling of the plates. Some prototypes have been already built and others are under the final design. Mechanical structure

9 The 1m3 prototype is a heavy structure (~8500 Kg) that we need to move and eventually rotate (for cosmic tests at the lab for example). The design of the needed tooling is being finalized and will be built at CIEMAT in the next months. Mechanical structure

10 We expect the mechanical structure to be ready by March 2010 Mechanical structure

11 Cross-section of GRPCs PCB support (FR4 or polycarbonate, 1.5m) PCB (1.2mm) Mylar layer (50μ) Readout ASIC (Hardroc2, 1.4mm) PCB interconnect Readout pads (1cm x 1cm) Mylar (175μ) Glass fiber frame (1.2mm) Cathode glass (1.1mm) + resistive coating Anode glass (0.7mm) + resistive coating Ceramic ball spacer (1.2mm) Total thickness including embedded electronics: 5.925mm Gas gap We want to put this in a robust cassette whose walls are part of the absorber

12 Cassette structure Cassette forms the elementary unit. It Includes the GRPC detector and associated electronics. It allows to fix the electronics on one plate (cover ) and the detector on the other plate. The two plates (2+3 = 5 mm) are a part of the absorber The total thickness of a cassette is 5 mm + 6 mm (sensitive medium) DIF detector electronics

13 Cassette structure Cassette frame made of 6X5 mm 2 section Steel bar Services outlets are now finalized

14 Distance from detector to edge = 2 mm

15 Assembling procedure Clearance : 2 mm in Z 4 mm in X

16 Full cassette was successfully tested at T9-PS May

17 We expect full production of all components of the cassettes before the end of November 2010 Cassette structure

18 Electronics 1- ASIC : Produced and being tested and calibrated (9000 ASICs) 2- DIF : Produced and tested 165 available 3- ASU : Being finalized. 300 to be produced and cabled by end of November

ASICs= 9216 channels/1m 2 1 pad= 1cm 2, interpad distance =.5 mm Connector board to DIF: Kapton flex Connector board to board: Kapton flex Many evolutions…..

20 Electronics A big effort is made on the connectors 1- More robust 2- Easily plugged We will slightly modify the ASU-DIF connector Rigid-Flex to Rigid-Flex-Rigid ASU-ASU connector seems ok.

21 A robot is being used to test the ASICs Max test time : 10 minutes/ASIC using Labview-based application Electronics

22 Electronics assembling will start as soon as the ASUs are cabled. First 1m 2 will be completed starting from December 2010 Electronics

23 Detectors Components to build 60 chambers are at hand Painting of 16 plates with semi-automatic silk screen print machine was performed. 1- Painting area : 2-3 mm far from the edge was respected important to limit sparks with the cassette edges 2- Painting homogeneity : very good

24 Detectors Components to build 60 chambers are at hand Painting of 16 plates with semi-automatic silk screen print machine was performed. Not enough painting

25 Detectors Painting of additional 100 plates will take place next month. Il takes 2 days. Construction of detectors has already started We expect to build 2 chambers/week

26 Validation test We intend to test our chambers and validate them using a cosmic ray stand developed by the group of Louvain. The stand is made of 4 planes of scintillators 160X160 cm 2 each two X-Y doublets

27 Validation tests The two doublets will be separated By.9 m. Up to 3 GRPC can be tested at the same time. 4 hours are enough to study the Efficiency of each pad of the GRPC chamber. Gas system is already installed and fully functional. GRPCs will be transported from Lyon to Louvain by a group of 6

28 Services: High Voltage Cockcroft-Walton system is selected as the baseline for the technological prototype. It satisfies safety requirement and ILD volume limitation. A module was developed in collaboration with ISEG Characteristics: 0-5 V  0-10 kV I <10µA I,V monitoring Residual noise 50 mV Still we are working to To reduce its thickness to 21mm A card to control/monitor the voltage/current of the 40 modules independently was conceived and being produced HT µC V set I set I mon V mon V ref SPI Enable ID ADCDAC CAN Transceiver

29 Services: Gas distribution system To feed 40 GRPCs without contamination risks Dynamic precision < 2% To be delivered soon

30 Acquisition system and Software Situation is much happier now than 3 months ago See talks of Vincent and Laurent We think we will have the system ready by February 2011

31 The prototype construction schedule ASICs are produced and packed LAL and then tested using the CMS adapted Robot IPNL DIFs are produced and tested LAPP DCC, LDA and other DAQ related boards are produced and being tested by LLR PCBs are being finalized and production is expected soon IPNL Cabling will start after (IPNL) RPCs production will start soon (2/week) (IPNL+Gent+LPC) Cassettes designed and should be built by a private company and PNL,LLR.. Assembling units (detector+cassette+electronics) will take place starting from November (IPNL) Testing units : Louvain-La-Neuve Mechanical structure will be ready by the February 2010: CIEMAT

32 Conclusion Many components are ready Tests are still ongoing Mass production has already started DAQ HW and SW are in advanced phase Realistic simulation is ongoing We hope to be ready before March 2011

33 Simulation and performance study Simulation should be as realistic as possible : 1- Including dead zones and edge effects 2- Obtaining the same efficiency and multiplicity as for data see R.Han talk Performance study 3- Developing new algorithms to improve on energy resolution and PFA: Neural Network, Hough Transform, Minimum Spanning Tree…..

34 To determine the energy a Neural Network can be very helpful INPUTS : Number of pads with 1st,2d and 3d threshold (N 1,N 2,N 3 ) Additional inputs taking into account the shower shape and its extension as well as shower density distribution are being studied Energy resolution E reconst σ/E E( GeV) Ongoing study

35 Tracking, clustering algorithms Minimum Spanning Tree :  Powerful tool to connect clusters into appropriate branches.  Useful to separate electromagnetic from hadronic contribution 10 GeV Hough Transform : find MIP inside the hadronic shower and use them to calibrate/control the detector Ongoing study