1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.

Slides:



Advertisements
Similar presentations
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Advertisements

L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
RF Cavity / Coupling Coil Module
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
CLEX TBM T0 Cooling system Progress Report 1 V. Soldatov, A. Vamvakas, BE-RF
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Refurbished Booster RF John Reid October 24, 2012.
TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Engineering design of the V-supports J.Huopana Input from: G.Riddone, A.Samoshkin, R.Nousiainen, D.Gudkov, N.Gazis.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Procurement for the Supporting Systems
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
CLIC Parameter Working Group Two Beam Module Design
Update on the DB Girders FE Analyses
PACMAN impact on future module design
TEST MODULE WG Cradles for CLIC module supporting system
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Complementary ISTC Projects #3888, 3889p
Ladder Assembly All tools and jigs produced Glue dispensing works
Mini-drawers, FE-ASIC , Integrator
Diffuser status October 2017
Far Detector Activities Late 2017 – Early 2018
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
TM0s and TM1 components inventory and procurement schedule
Preparations for test of
CAN branch PSU – Update meeting
Two-beam Test-stand Design and Construction Status
Teleconference ACS – FREIA 19th June 2017
Preparation for Installation at ESS
Presentation transcript:

1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10 3. Contact MicropierreFuture 12/11/10 4. Liaison with Antonio to compile a schedule and inventory of all components for RF (TM0) Completed 5. Design assembly jigs and fixtures for bonding In progress Preliminary sketches with Shah 5. Vacuum Mock-upIn progress 7. Inquiry regarding Cooling Fitting (Positional) for AS In progress In contact with Swageloke

UPDATE OF LAB LAYOUT AND MODULE ASSEMBLY. B-162- R-011

PROGRESS SO FAR B-162- R-011 The rear wall has been repainted. Floor is being prepared and painted today (15/11/10) Wood will be placed in the side wall panels to cover the wire mesh on the 2 side walls then painted white. Clear Polycarbonate plastic will be placed in the front wall panels. Silicon will be injected into the space between the walls and floor to prevent dust from entering.

PROGRESS FOR MODULE ASSEMBLY All drawings for Accelerating Structure are at Berthet-Serge for quotation and are awaiting their response. All drawings for PETS are at CERN Main Workshop and are waiting for their response. All drawings are at Micropierre and are waiting for their response. A structure for Electron Beam Welding has been discussed with a general design commenced.

PROGRESS FOR MODULE ASSEMBLY Delivery of 2 girders type 0 from EPUCRET (DE) to CERN by end of week 46 / beginning of week 47. Delivery of 2 Main Beam girders type 0 from MICRO-CONTROLE (FR) to CERN by end of week 48. Delivery of 2 Drive Beam girders type 0 from BOOSTEC (FR) to CERN to be confirmed, modification has been requested by CERN on the girders. B-169-S-021 will be used to store the 3 crates.

PROGRESS FOR MODULE ASSEMBLY METROLOGICAL PLATES arrival date: As written by Hélène Mainaud Durand. (02/11/10) The delivery at CERN is foreseen on the 19 of November. We will need then to perform controls and assemble the parts. This should arrive week 47 to B162-R- 011.

BACK TO B-162-R-011 Area needed to install sensor plates and/or stretching devices

PROGRESS FOR MODULE ASSEMBLY COMPACT LOAD: Model for compact load in progress (Drawings Checked) Several remarks to be implemented. RF DISTRIBUTION: RF Network studying 3D mockup in progress. Drawing creation underway.