COMPLEX PROBLEMS CLASS 6

Slides:



Advertisements
Similar presentations
Developing Problem Tree & Solution Tree
Advertisements

Module 4: Managing IS Organizations Topic 9. Managing the processes of organizational behavior.
Introduction to Engineering Ethics – 2 Engineering Ethics Agenda Review Ethics I Introduce resources for ethical decisions in engineering References Challenger.
 According to Kurt Lewin “ The possibility of inducing forces of a certain magnitude on other persons”.  Power is to be treated as a capacity that A.
Public Engagement in a Multi-Stakeholder World Don Lenihan June 2008.
(Clockwise starting in left back row)  Ellison S. Onizuka, Mission Specialist  Sharon Christa Mc Auliffe, Teacher  Greg Jarvis, Payload Specialist.
Observations on the Loss of the Challenger Observations o Engineering processes (the decision- making process to arrive at the launch decision) need.
Space Shuttle Challenger Disaster
The Normalization of Deviance at NASA. Background January 28, 1986 Shuttle engineers were worried about launching at the predicted temperature of 31 degrees.
Three Ethical Case Studies
Faiz Almansour Alemu Azanaw Rachel Downen Timothy Herbig Angie Schneider.
An Accident Rooted in History NASA Culture History of the flawed joint Events leading up to the disaster.
Comprehend the Challenger accident Comprehend the Columbia accident The Space Shuttle Program: Challenger and Columbia Accidents.
Contrast the actions of managers according to the omnipotent and symbolic views
The Challenger Disaster
Observations on the Loss of the Challenger Observations o Engineering processes (the decision- making process to arrive at the launch decision) need.
1 Chapter 9 Rules and Expert Systems. 2 Chapter 9 Contents (1) l Rules for Knowledge Representation l Rule Based Production Systems l Forward Chaining.
ORGANIZATIONAL BEHAVIOR
Roger Boisjoly and the Challenger Disaster
1 14. Project closure n An information system project must be administratively closed once its product is successfully delivered to the customer. n A failed.
Decision Making in Complex Organizations Lessons from Columbia Shuttle Disaster case MIIC April 6, 2009 Prof. Morten Hansen.
Notes on Challenger DisasterChallenger Disaster Stephen Scott March 12, 2003.
MBMC Thinking Like An Economist. MBMC Copyright c 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 1: Thinking Like an Economist Slide.
The Challenger Accident Magnus Jansson, Electrical Engineering Fredrik Mannesson, Engineering and Industrial Management Per Martinell, Civil Engineering.
Week 2: Major Worldviews January 10, 2007
Total Quality.People-focused management system.Focus on increasing customer satisfaction and reducing costs.A systems approach that integrates organizational.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Questions from a patient or carer perspective
Learning Objective Chapter 19 Values and Ethics Copyright © 2001 South-Western College Publishing Co. Objectives O U T L I N E Defining Business Ethics.
Making Human Resource Management Strategic
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Overview and Challenger Case Study Bryan Palaszewski working with the Digital Learning Network.
Coaching and Performance Management
An Example Through When Things Go Wrong. Technical Communication Interactive and Adaptable Reader-Centered Produced In Teams Visual Influenced by Ethics,
Understand What Drives Employee Engagement
Manufacturing Advanced Design Applications Manufacturing © 2014 International Technology and Engineering Educators Association, STEM  Center for Teaching.
4/00/ © 2000 Business & Legal Reports, Inc. BLR’s Human Resources Training Presentations Dealing with Challenging Employees.
Risk Management for Work Stress at EDUCACONSULT M&J Consulting Pardubice, Czech Republic
FAILURES AND CAUSES NASA MISSIONS SYSM Advance Requirements Engineering Dr. Chung Muhammad Ayaz Shaikh 05/19/2012.
1 CREATING A LEARNING ORGANIZATION AND AN ETHICAL ORGANIZATION STRATEGIC MANAGEMENT BUAD 4980.
Managerial Decision Making
1 What Should Software Engineering Consist of? An Industry Experience Perspective Paul E. McMahon, Principal PEM Systems
Preventing Surgical Complications Prevent Harm from High Alert Medication- Anticoagulants in Primary Care Insert Date here Presenter:
Designing a Random Assignment Social Experiment In the U.K.; The Employment Retention and Advancement Demonstration (ERA)
Case study. CASE STUDY: Investigate mechanical properties of rubber at different temperatures.
Third Sector Evaluation: Challenges and Opportunities Presentation to the Public Legal Education in Canada National Conference on “Making an Impact” 26.
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
Where We Are Now 14–2. Where We Are Now 14–2 Major Tasks of Project Closure Evaluate if the project delivered the expected benefits to all stakeholders.
Week 12: Performance Management and Performance Budgeting Discuss Eureka exercise Review mid-term Conceptual Origins of Performance Management Government.
Chapter 2: Constraints and Challenges for the Global Manager
Contrast the actions of managers according to the omnipotent and symbolic views
EMGT 506 Challenger Case Study Question 2 Group B.
Chapter 8 Management, Leadership, and Internal Organization Learning Goals Define management and the skills necessary for managerial success. Explain the.
Introduction to Technical and Business Writing. 2 What is Technical Writing? Taking complicated subject matter and transforming it into easy-to-understand.
Chapter 9 Review How can you measure employee engagement levels over time?
The ”human factor” or Why social perspectives on technology development are important Marie Aurell Department of Industrial economics Blekinge Institute.
Health Management Dr. Sireen Alkhaldi, DrPH Community Medicine Faculty of Medicine, The University of Jordan First Semester 2015 / 2016.
Managing Quality Through Accountability Performance measurement and the Balanced Scorecard TQM failures Keys to success.
C ONCEPTS OF ORGANISING Static concept Dynamic concept.
PROJECT MANAGEMENT Software Engineering CSE
JANI AARTI En No:  By the end of this lecture, students should be able to: 1.Explain the functions of management 2.Define and explain strategy.
A rich question calling for qualitative research Academy of Management PDW, August 2008 The Power of Richness IV Ann Langley, HEC Montréal.
Chapter 2: Constraints and Challenges for the Global Manager
MAN-3/2 Erlan Bakiev, Ph. D. IAAU Spring 2015 Understanding Management’s Context: Constraints and Challenges.
CHALLENGER DISASTER : CASE STUDY – TO BE
Managerial Decision Making
Chapter 2: Constraints and Challenges for the Global Manager
The Manager: Omnipotent or Symbolic?
Ch2: Understanding Management’s Context: Constraints and Challenges
Characteristics of Effective Teams
STS-114 Return to Flight Lessons Learned Bill Parsons
Presentation transcript:

COMPLEX PROBLEMS CLASS 6 Can We Really Learn From Failure? Failure Analysis as a Problem Solving Tool

Background on Failure Analysis Engineering Roots (hyperlink to learning from engineering disasters) NTSB as Example Sports Example -- “Truth in Video” Expanding into Organizational Influences PTD or PED -- Primary Technical (usually Engineering) Decisions PMD -- Primary Management Decisions See Failure Analysis Resource Library

Failure Analysis as Problem Solving Works back and forth between analytical and heuristic problem solving techniques Modeling components: simplifying, organizing … Heuristics: backward-forward; experiments; careful observation ... Process-Specific Lessons Solving problems that have occurred: remedies-improvements indicated that are limited to the particular case at hand and the process, company, or people involved -- often technical in nature General Lessons Avoiding problems before they happen: remedies-improvements suggested for application to other processes, companies, and people This is the reason for studying failures of non-related companies and industries

Levels of Failure Analysis Physical Causes Tangible causes at the point of failure that explain how something happened, e.g. machine part that fails Responses: redesign; sanction, training ..of engineer Human Causes Point of Failure: Improper intervention by person directly linked to the problem (operator, pilot, …); focus on how failure occurred Responses: sanction of decision maker closest to problem Organizational/Management Influences: Considering the factors (systems, incentives, policies) behind the point of failure that may have contributed or almost determined the point of failure causes; focusing on “why” the failure occurred This opens the widest possibility for generalizing beyond the specific failure to help avoid other failures

1986 Challenger Disaster Basic Facts -- see Case Western Website Past flights -- known O-Ring Problems, scorching, erosion, partial burn-through Contractor written recommendation of no launch below 53 degrees because of loss of O-ring elasticity -- sealing capacity July 1985, Thiokol engineer memo warning Flawed design of pressure seal (O-Ring) Jan 27-28: Cold temperatures; Thiokol engineers advise against launch; management backs the decision Thiokol management reverses -- they & NASA decide to launch Jan 28, 1986, NASA Shuttle Challenger Explodes about 150,000 ft. above Earth

1986 Challenger Disaster Physical Causes: Failure of the pressure seal (O-Ring)on right solid rocket booster O-Ring Blow-out; Booster-Strut Burn-out; Booster Impacts Hydrogen Tank … Flawed design of pressure seal (O-Ring) Solution: Redesign O-rings + reconsider design of Shuttle in general

Challenger Con’t Human Causes Point of Failure: Launch decision over objections in view of low temperatures Solution: Sanction Thiokol & NASA decision makers …

Challenger Con’t Org Policies-Systems-Incentives: why would a manager & NASA make such a decision? At least 2 answers given: Incentives to launch NASA key customer; NASA pressure to launch because of slow pace of shuttle missions “Normalization of deviance”

NASA -- Back to the Future 1967 Fire on Apollo 1 Pure oxygen system; North American Warnings; Deaths; Tangible cause focus; NASA & NA point managers lose jobs; no focus on why or changes based it 2003 Columbia Shuttle Disaster (in progress) Foam debris; Loss of tiles; Decisions not to investigate further at time; More discussion as to why. Results…?

Other Failures with Interesting Org Components Structural Failures Kansas City Hyatt Regency ... Detroit Northwest Airlines Debacle Planes on Tarmac for 8+ hours out of food, water, toilet capacity, ... Groopman (Harvard M.D.) Second Opinions

Organizational/Managerial Causes Going beyond superficial (Harvard B-school Max Bazerman) Organizational Incentives Org goals Customer pressures Cost pressures Flawed links incentives-behavior NOTE: Although sometimes portrayed in the media as improper, these kinds of concerns are legitimate and enter into business as well as personal decisions (even for reporters) Flawed Decision Processes Lack of Information Sharing -- lack of “informativeness” principle Org Politics: Conflicts, Rivalries, Poor Leadership Direction; Compartmentalized Decisions (breaking problem into parts), but Tightly Coupled Systems -- Highly Complex Interactive Systems not fully recognized Normalization of Deviance

FAILURE ANALYSIS & BUSINESS Why is failure analysis not more common in business? Threat to leaders, employees, ... Ignorance of role-benefits Organizational Culture

Organizational Architecture for Meaningful Failure Analysis Buy-in from top leaders Analysis team with technical expertise but not necessarily led by expert from field Boiler problem & chemist example Tradeoff: Punishing failure -- promoting truth Obviously, price to pay for bad decisions People looking over shoulder perform poorly Recognize that some factor(s) beyond reasonable foresight -- cannot become witch hunt WTC Collapse; OK City Bombing Collapse;

Critical Lessons Failure analysis is not just an engineering matter Technical, Decision, Managerial Issues Failures frequently surface from organizational flaws Incentives out of balance goals; consumers; costs; incentives-behavior linkages Decision Processes lack of information sharing-transparancy decisions compartmentalized-systems highly integrated normalization of deviance

Mini-Assignment Find an example of a workplace failure Try to identify the point of failures (physical; decisons) Consider whether the failure is linked to organizational incentive or decision process problems