LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
University Health Building Thesis Final Presentation
Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania Aubert Ndjolba Structural Option AE Senior Thesis Thesis Advisor: Dr.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Joe Sharkey Structural Option Christiana Hospital 2010 Project Newark, DE.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008 introduction overview proposal goals depth.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Christopher Simmons l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Dr. Ali M. Memari Baltimore Hilton Convention Center Baltimore.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
Computer Associates International, Regional Office
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Ryan Johnson - Structural Option
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
RiverView Condominiums II Chicago, IL
Presentation transcript:

LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Objectives & Measure of Success  Structural Redesign  Two-Way Post-Tensioned Floor System  Concrete Columns & Shear Walls  Mechanical Retrofit  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Lockwood Place Use: Mixed-Use Development Location: Baltimore, Maryland Construction: June September 2004 Envelope: Glass Curtain Wall Abuts a Covered Mall and Adjacent Parking Deck Use: Mixed-Use Development Location: Baltimore, Maryland Construction: June September 2004 Envelope: Glass Curtain Wall Abuts a Covered Mall and Adjacent Parking Deck Monica Steckroth- Structural Option

Lockwood Place Size: 302,348 sq.ft. Height: 13 Stories 13.5’ Typical Story Height 194’ tall Cost: $28 million base cost $8 million change orders Size: 302,348 sq.ft. Height: 13 Stories 13.5’ Typical Story Height 194’ tall Cost: $28 million base cost $8 million change orders Monica Steckroth- Structural Option

Lockwood Place  Owner: TC MidAtlantic Inc.  Managing Partner: Kravco Company  Developer: Lockwood Associates, LLC  Vertical Transportation Consultant: Lerch Bates & Associates  Lighting Design Consultant: The Lighting Practice, Inc.  Structural Engineer: Hope Furrer Associates, Inc.  MEP Engineer: B&A Consulting Engineers  Civil Engineer: STV Incorporated  General Contractor: Helix Construction Services, Inc. Monica Steckroth- Structural Option

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Structural Redesign  Two-Way Post-Tensioned Floor System  Concrete Columns & Shear Walls  Mechanical Retrofit  Air Distribution System Resized  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Existing Conditions Gravity System: Composite Steel Typical Bay Size: 30’-0” x 45’-0” 30’-0” x 30’-0” f’c= 3500psi fy= 50ksi Lightweight Concrete 6-1/4” slab 3”, 20 gage Composite Deck 3/4” Ø, 5-1/2” long shear studs Gravity System: Composite Steel Typical Bay Size: 30’-0” x 45’-0” 30’-0” x 30’-0” f’c= 3500psi fy= 50ksi Lightweight Concrete 6-1/4” slab 3”, 20 gage Composite Deck 3/4” Ø, 5-1/2” long shear studs Monica Steckroth- Structural Option

Existing Conditions Lateral System: Eccentric Braced Frames: W14x90 – W8x31 Moment Frames Lateral System: Eccentric Braced Frames: W14x90 – W8x31 Moment Frames Monica Steckroth- Structural Option

Existing Conditions Monica Steckroth- Structural Option Foundation: Drilled Caissons: 2-6” to 6’-0” f’c= 4500psi Drilled 1’-0” to 5’-0” into Gneiss Bedrock Grade Beams: Between Pile Caps 18”x24” to 24”x42” Foundation: Drilled Caissons: 2-6” to 6’-0” f’c= 4500psi Drilled 1’-0” to 5’-0” into Gneiss Bedrock Grade Beams: Between Pile Caps 18”x24” to 24”x42”

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Objectives & Measure of Success  Structural Redesign  Gravity System  Lateral System  Mechanical Retrofit  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Objectives Monica Steckroth- Structural Option  Eliminate Cost and Labor Created by Holes  Allow More Mechanical Flexibility Additional $150,000 in Cost of Steel! Over 200 Holes per Typical Floor!

Measure of Success Monica Steckroth- Structural Option Decrease Structural Floor Depth with Concrete System Larger Air Duct and Smaller Fan Size Requiring Less Energy Reasonable Cost & Schedule Differences

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Objectives & Measure of Success  Structural Redesign  Two-Way Post-Tensioned Floor  Concrete Columns & Shear Walls  Mechanical Retrofit  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Structural Redesign Monica Steckroth- Structural Option General Parameters Typical Span= 30’-0”x45’-0” Class U System 12” Flat Plate Normal Weight Concrete f’c= 5000psi Balance Dead Load= 60-70% ½” 270ksi strands Code Allowances Jacking= 1800psi f Jacking= 164psi f Service= 2250psi f Service= 424psi

Structural Redesign  Shear Resistance 18” Column Capitals 8’-0” x 8’-0” Monica Steckroth- Structural Option Loading Self-weight150psf Dead15psf Live100psf

Structural Redesign Monica Steckroth- Structural Option  Tendon Layout East/West Large Banded TendonsNorth/South Small Banded Tendons (32) 692K(24) 639K (14) 372K (12) 320K 32K/FT Additional 60K/FT

Structural Redesign  Floor Deflection Monica Steckroth- Structural Option Long Term DeflectionEquivalent Deflection Positive1.40”L/386 Negative0.36”L/1000

Structural Redesign Monica Steckroth- Structural Option

Structural Redesign  Typical Column Monica Steckroth- Structural Option 5000psi 6000psi

Structural Redesign  Front Column Design Monica Steckroth- Structural Option

Structural Redesign Monica Steckroth- Structural Option  Shear Wall Thicknesses: 10” N/S, 14” E/W  Controlling Lateral Load Combination: 0.9D+1.6W Wind Displacement Seismic Story Drift Max = 1.78”

Structural Redesign  Shear Wall Design Monica Steckroth- Structural Option

Structural Redesign  Shear Wall Design Monica Steckroth- Structural Option

Structural Redesign  Shear Wall Design Monica Steckroth- Structural Option

Structural Redesign  Coupling Beam Monica Steckroth- Structural Option

Structural Redesign  Caisson Adjustment Caisson Uplift Zero Diameter Increase Monica Steckroth- Structural Option $176,800 Foundation Increase 30” 48”

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Structural Redesign  Two-Way Post-Tensioned Floor  Concrete Columns & Shear Walls  Mechanical Retrofit  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Mechanical Retrofit  Existing Air Distribution System: AHU located at each typical floor Distributes 17000cfm Powered Induction Units Plenum Air Supply Air 46°F Heated Air Distributed to Respective Zones Monica Steckroth- Structural Option

Mechanical Retrofit Objectives: Resize Air Ducts Minimize Air Velocity in Ducts Increase Acoustical Value Reduce Static Pressure Resize AHU Fan Reduce Size/Initial Cost Reduce Energy Monica Steckroth- Structural Option

Mechanical Retrofit  Resized Air Ducts According to TRANE Calculator Greatest Change in Diameter = 5”

Mechanical Retrofit  Section Difference +14” Utilized  Change in Air Velocity: Monica Steckroth- Structural Option 2275 ft / min 1698 ft / min

Mechanical Retrofit  40”, TRANE manufactured  20 Horsepower, 480V/3 Phase  Force Flow Centrifugal Variable Frequency Drive, blow-thru  ∆3.6” static water pressure required  40” TRANE manufactured  11.2Horsepower, 480V/3Phase  Type Q  ∆2.83” static water pressure required (0.2” losses provided by the fan) Existing FanProposed Fan Monica Steckroth- Structural Option

Mechanical Retrofit Costs Added Cost of Air Ducts Benefits Increased Acoustical Value Less Energy Required Additional MEP Room Space Monica Steckroth- Structural Option Centrifugal Blow-Thru Fan Type Q Fan

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Structural Redesign  Two-Way Post-Tensioned Floor  Concrete Columns & Shear Walls  Mechanical Retrofit  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Cost & Schedule Analysis Cost Consideration: Existing Structural Steel Super- Structure Concrete Spray- on Fireproofing Punched Hole Detailing Proposed Super- Structure Concrete Additional Foundation Concrete Regular & Post- Tensioned Reinforcement 16% Savings! Monica Steckroth- Structural Option

Cost & Schedule Analysis  Existing Schedule Construction: June September Sequences constructed – 3 Levels/ Sequence Total Structure Construction = 35 weeks Monica Steckroth- Structural Option

Cost & Schedule Analysis  Proposed Schedule 1Sequence= 1 Level Total Structure Construction= 40 weeks  Comparison 5 Additional Weeks! 5 Additional Weeks! ExistingProposed Start Date06/02/03 Finish Date3/21/044/29/04 Total Time35 Weeks40 Weeks Monica Steckroth- Structural Option

Presentation Outline  Project Introduction & Building Background  Existing Conditions  Objectives & Measure of Success  Structural Redesign  Two-Way Post-Tensioned Floor  Concrete Columns & Shear Walls  Mechanical Retrofit  Cost & Schedule Analysis  Conclusions & Recommendations Monica Steckroth- Structural Option

Conclusion & Recommendations Decrease Structural Floor Depth with Concrete System Larger Air Duct and Smaller Fan Size Requiring Less Energy Reasonable Cost & Schedule Differences Monica Steckroth- Structural Option

Acknowledgements Monica Steckroth- Structural Option My Family & Friends Dr. Linda Hanagan The Pennsylvania State University, Faculty Advisor Architectural Engineering Faculty The Pennsylvania State University Carol Hayek, PhD SD Post-Tensioning Hope Furrer Hope Furrer Associates, Inc. B&A Consulting Engineers Milton Steel, Inc. Jason Witterman Penn State AE Mechanical Option Todd Povell Penn State AE Construction Option

Questions? Monica Steckroth- Structural Option