Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary.

Slides:



Advertisements
Similar presentations
How to read plans, The designer has the vision or dream of what to create on stage. Drafting allows the designer to communicate the dream to craftspeople.
Advertisements

Cofferdam.
© 2014 MAIN STREET LED SIGNS, LLC MINDEN, LA. Yes, modular display components are changing the way we do business. But how? And why is that important.
LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
PLATEPRO PHOTOPOLYMER PLATEPRO PHOTOPOLYMER Pre-wash The Photopolymer+CTP plate processor has an integrated Pre-heat and Pre-wash system. The plate processors.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
NOISE CONTROLS FOR PLANTS AND MILLS. SOURCE PATH RECEIVER.
Marine Construction SCM 330 Tyler Mason Pratt Tyler Mason Pratt
Introducing an attractive, innovative space saving stair solution from the leading brand of outdoor living. 1.
ModICE Modular Integrated Connector Enclosure
Box Label System.
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Digital Installation - 1 Modern Communication & Broadcast System (MCBS) - 60cms Prepared By Checked ByApproved ByCirculated By Mr. Ashok Dubey Mr. Sanjib.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Culverts – Installation Soil Steel Structures – No backfill.
Introduction to B-tek “Digital” load cell Shows complete assembly as in the “Centurion” Truck Scale. Shows complete assembly as in the “Centurion” Truck.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
For inquiry details call + 91 – Wel-Tech Weighing Systems. All Rights Reserved | Powered by A M TechnologiesA M Technologies “Quality and time.
ZTF Interconnecting Scheme Stephen Kaye
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
Invision TAC™ Integrated Telephone Entry and Access Control System Product Introduction June 2010.
CM-75 SERIES PUSH PLATE SWITCHES Leading the Industry with A New Class of Door Activation.
Introduction to a pit installation
High Sensitivity Smoke Detection
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Model LS-2001 Lift Station Controller Model LS-2001 Lift Station Controller Copyright, 2006 © U-Tap Controls Click on slide to move through presentation.
Foundation Prints Unit 12.
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
Introduction to Products. Industry Leading Performance Glare and spill light control has become a major concern for new sports lighting installations.
Introduction to a pit-less lever scale “concrete deck” The scale to be shown is a B-Tek Side/rail Side/lever electromechanical Platform is 60’x11’ on.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Railing Configurations. Custom Horizontal Systems Custom Horizontal Systems are custom built and installed to a particular design. In.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Josh Schortgen Phillip Byers BOAR Mike Broski Jonathan Mulvaine.
2015 Traffic Signals 101 Topic 8 Head and Loop Placement.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
Kubus IP65 Exit sign luminaire. IP65 Higher degree of protection Indoor application shopping centers restaurants Outdoor application parking areas exhibitions.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
Discussion on Mobile Weighbridge Wel-Tech Weighing Systems. All Rights Reserved | Powered by A M TechnologiesA M Technologies “Quality and time bound of.
Melfast is a distributor of fasteners and hardware who offers a wide range of hardware items and materials including fasteners,
Utah State University - University of Washington - Virginia Tech.
RF Retrofit Kit installation guide
Guide Right™ Immediate Placement & Immediate Load
HAMANASI Truss Installation Graphics February 2014
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Additional information:
nSW Alignment Installation
MKTG 2016.
* Topic 8 Head and Loop Placement
Module 6 Antenna Assembly and Look up Angles
New Coil Bracket.
MKTG 2016.
GMA200-MT GMA200-RT GMA200-MW Modules of the Gas detection system.
Process Flow For Electronic Component Prep
Introducing bCom.
STEEL PLATES.
Color Touch Screen Display
Off Shore Platform Modularization
PQube® 3 Standard Pre-Wired Packages for quick and easy installation
<Your Team # > Your Team Name Here
Prime Equipment (800) BLUE AIR  Commercial Refrigeration S. Broadway, Gardena, CA Phone. (310)
Polarized 3He target installation
Presentation transcript:

Centurion Scale “temporary install” The scale to be shown is a B-tek Centurion Scale “Flat top” design with a steel deck Platform is 84’x11’ mounted temporary in the parking lot Temporary gravel approaches and our door mounted indicator and printer with wireless transmission to a remote printer. The scale is a modular design with (3) - 24’ modules and (1) - 12’ module. Features: 100 % digital load cells that are in stainless steel cans. 75K load cells, (10) in the entire scale. 10” I-Beams with a 3/8” steel deck Very clean design with easy access to the components under the deck.. 5 year “End wall to End wall” Warranty

Layout of scale elevation Leveling of Bulk heads at each end of the scale Marking of the load plates

Preparing to set the scale Dummy cells mounted to the load plates, crane will set the scale. Scale is pre assembled laying on the ground to the left.

Scale Placement Scale has been placed on the dummy cells Excavated material has been placed behind bulk head for fill

Installation of load cells Shows gravel approaches installed Replacing the dummy load cells with the actual load cells

Completed Installation Scale installed, electronics mounted in the sealed box to the right of the scale. Good look at the 6’ retaining blocks holding the gravel in place.

Outdoor Electronics package Scale readout and printer mounted in a insulted enclosure with visor. Notice the box at the top of the pole is a data transmitter to a remote printer in the scale office.