CONFIDENTIAL – For Internal Review and Discussion Only.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
SKELETAL QUIZ 3.
PDAs Accept Context-Free Languages
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Addition and Subtraction Equations
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Behavioral Health DATA BOOK A quarterly reference to community mental health and substance abuse services Fiscal Year 2013 Quarter 1 January 9, 2012
Behavioral Health DATA BOOK A quarterly reference to community mental health and substance abuse services Fiscal Year 2011 Quarter 4 October 10, 2011.
Fiscal Condition of the States Presentation to the Rhode Island House of Representatives Economic Forum December 1, 2009 Arturo Pérez Fiscal Affairs Program.
CHAPTER 18 The Ankle and Lower Leg
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
The basics for simulations
© 2010 Concept Systems, Inc.1 Concept Mapping Methodology: An Example.
Frequency Tables and Stem-and-Leaf Plots 1-3
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
Evelyn CP School Foundation Stage Results (Specific Learning Goals – Reading, Writing and Number) 2013 Reading (Expected) 77% Writing (Expected) 43% Number.
Moving to “T” National Instrument Institutional Trade Matching & Settlement Working Towards Successful Implementation Glenn MacPherson Program Director,
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
LN-251 SimINERTIAL Performance
11.0 Release Training Online Credit Unions: April 17, 2011 CU*NorthWest/CU*South: May 9, 2011 Self Processing CUs: May 9 & 10, 2011 Posted: April 8, 2011.
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
PSSA Preparation.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Take any two digit number between 11 to Add the numbers (Example: Number 54 : 5+4=9). 2. Now subtract the answer from original number (i.e. 54-9=45,
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
A Data Warehouse Mining Tool Stephen Turner Chris Frala
Chart Deception Main Source: How to Lie with Charts, by Gerald E. Jones Dr. Michael R. Hyman, NMSU.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
What impact does the address have on the tribe?
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
1 Confidential The United States Postal Service Q2, FY2011 Financial Update May 25, 2011 Joe Corbett Chief Financial Officer & Executive Vice President.
Chief Financial Officer & Executive Vice President
Presentation transcript:

CONFIDENTIAL – For Internal Review and Discussion Only

Financial Matters: 2011 Financial Results Board of Governors Open Session November 15, 2011 Joe Corbett Chief Financial Officer & Executive Vice President

3 Financial Results * Before RHB Pre-Funding, Non-Cash Adjustments to Workers Compensation Liabilities & Contingency.

4 Revenue $ Billions Revenue FY2010 – FY % +2.9% +6.3% -2.0%

5 Financial Results * Before RHB Pre-Funding, Non-Cash Adjustments to Workers Compensation Liabilities & Contingency.

6 Operating Expenses * Before RHB Pre-Funding, Non-Cash Adjustments to Workers Compensation Liabilities & Contingency.

7 Workhour Changes September YTD – FY M 150 M 399 M 177 M 148 M 1,149 M 59 M 168 B DELIVERY FREQUENCY September 2011 YTD Reduction vs = 34.1M hrs

8 Total Factor Productivity

9 Financial Results * Before RHB Pre-Funding, Non-Cash Adjustments to Workers Compensation Liabilities & Contingency.

10 Integrating Required Annual Public Reports USPS publishes multiple public reports Documents respond to different legislative requirements -Comprehensive Statement on Postal Operations (PRA, PAEA) -Annual Report (PAEA) -Annual Performance Report and Plan (GPRA) New Legislation (Government Performance and Results Modernization Act) and OMB guidance recommends report simplification and consolidation

11 Integrated Annual Public Report Key Content (Single Document) – to be published end of November Year in Review – Financial Highlights Core Strategies Board of Governors and Executive Leadership Team 2011 Financial Summary Operating Statistics Comprehensive Statement on Postal Operations - Summary of 2011 initiatives 2011 Annual Performance Report and 2012 Performance Plan

12 Requesting approval of the following: 1.10-K and Financial Statements 2.FY 2011 Comprehensive Statement, including the Annual Performance Report and Annual Performance Plan FY 2011 Financial Results

® 2012 Integrated Financial Plan Board of Governors Open Session Joe Corbett Chief Financial Officer & Executive Vice President November 15, 2011

14 Requesting approval of the following: 1.FY 2012 Integrated Financial Plan 2.FY 2013 Congressional Reimbursement (Appropriations Request) FY 2012 Integrated Financial Plan

15 Economic Indicators Primary Volume Drivers for Each Class of Mail Standard & Priority First-Class Relatively Flat 53% Less Growth 28% Less Growth 24% Less Growth Source: Global Insight – August 2011 Standard

16 Statements of Operations In Billions FY 2011FY 2012 IFP Revenue65.7$ 64.0$ Expenses Operating Income (Loss)(2.2)$ (3.0)$ RHB Pre-funding (Current Law)(11.1) Non-cash Workers' Comp Adj.(2.9) Net Income (Loss)(5.1)$ (14.1)$ Volume Restructuring Charge* (TBD) * Equipment and Facilities Impairments, Workers Comp, Unemployment, and VERAs (TBD)

17 Revenue $ Billions Revenue FY2006 – FY2012 FCM SM $72.8 $75.0 $68.1 $67.1 $65.7 $64.0 $75.0

18 Statements of Operations In Billions FY 2011FY 2012 IFP Revenue65.7$ 64.0$ Expenses Operating Income (Loss)(2.2)$ (3.0)$ RHB Pre-funding (Current Law)(11.1) Non-cash Workers' Comp Adj.(2.9) Net Income (Loss)(5.1)$ (14.1)$ Volume Restructuring Charge* (TBD) * Equipment and Facilities Impairments, Workers Comp, Unemployment, and VERAs (TBD)

19 Cumulative Savings vs. Workhours Cumulative savings primarily from headcount reductions Total Workhours ($ Billions) FY12 Savings $2.5 Billion FY12 Plan Reduction of 58M hours

20 Statements of Operations In Billions FY 2011FY 2012 IFP Revenue65.7$ 64.0$ Expenses Operating Income (Loss)(2.2)$ (3.0)$ RHB Pre-funding (Current Law)(11.1) Non-cash Workers' Comp Adj.(2.9) Net Income (Loss)(5.1)$ (14.1)$ Volume Restructuring Charge* (TBD) * Equipment and Facilities Impairments, Workers Comp, Unemployment, and VERAs (TBD)

21 Capital Commitments of $900M For 2012

22 Min.1 month liquidity $7B Available Liquidity at Month-End FERS Impacts $0.6B FY11 ActualsFY12 Forecast Assumes: No RHB pre-funding in 2011 or 2012 Pay FERS amounts withheld and resume contributions in December Pay FERS FERS Withholding $0.1B

23 Request for FY 2013 Congressional Reimbursement No request for Public Service Subsidy (cost of Universal Service Obligation) – range of $460M to $3.7B

24 Requesting approval of the following: 1.FY 2012 Integrated Financial Plan 2.FY 2013 Congressional Reimbursement (Appropriations Request) FY 2012 Integrated Financial Plan

Quarter 4, Fiscal Year 2011 Service Performance and Customer Experience Megan J. Brennan Chief Operating Officer

26 Rapidly Changing Environment Major Infrastructure Changes Challenges from the Elements Employees Delivered Quarter 4, Fiscal Year 2011

27 Single-Piece First-Class Overnight Source: TTMS QTR 4YTD FY11SPLY Target – 96.65

28 Single-Piece First-Class 2 - Day Source: TTMS QTR 4YTD FY11SPLY Target – 94.15

29 Single-Piece First-Class 3 to 5 Day Source: TTMS QTR 4YTD FY11SPLY Target – 92.85

30 Single-Piece First-Class International Source: TTMS QTR 4YTD FY11 SPLY Target –

31 Presort First-Class Source: TTMS There is no SPLY for Presort Overnight2-Day3-Day Qtr 4YTD Target – Target – Target – 92.85

Process Improvement 24 Hour Clock Execution Reduce Variation Quality Focus Leverage Service Diagnostic Tools Network Management Continuous Improvement Initiatives

Quarter 4, Fiscal Year 2011 Customer Experience Measurement

Overall Experience ResidentialSmall Business QTR 4SPLY Customer Experience Measurement

35 Residential Experience ReceivingSendingPO VisitContact Customer Experience Measurement QTR 4SPLY 91.2

36 Small Business Experience ReceivingSendingPO VisitContact Customer Experience Measurement QTR 4SPLY

CEM - Process Improvement Ownership and Resolution of Issue Continuous Improvement Initiatives Customer Experience Essentials Training Increased Use of Diagnostics

38 Plan to Move at an Accelerated Pace Our Commitment Predictable Service Industry Engagement Infrastructure Changes to Continue Summary

Quarter 4, Fiscal Year 2011 Service Performance and Customer Experience Megan J. Brennan Chief Operating Officer