Copyright National Grid Metering 11-01-08 NGM Daily Meter Reads UNC RG 0175.

Slides:



Advertisements
Similar presentations
Gas Technology Services P/L CMRS Customer Meter Reading Service Presentation.
Advertisements

ONE STOP THE TOTAL SERVICE SOLUTION FOR REMOTE DEVICE MANAGMENT.
Application of User Pays Principles to Existing Service Lines 22nd November 2006.
DOE O 430.2B Metering Requirements and Status
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
New Horizons Cybersoft Limited. CONTENTS Concept Behind Spot Billing Benefits of SBM(GPRS) GPRS enabled SBM advantages. SBM(GPRS) Billing Process Data.
COR2557: Revisions to the Metering Charges Pricing Module on Unique Sites UK Link Committee – January 2014.
Data Logger/ Daily Meter Reading Processes. New Daily Metered Site  DM Service Provider receives a request from Gas Shipper for installation of daily.
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
3.4 Billing Systems. Overview Demonstrate and apply knowledge and understanding of how utility bills are produced from a batch processing system employing.
SmartMeter Program Overview and Impacts for ESPs April 2007.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
Probe12 Sap Velocity based Sap flow logger & Irrigation Scheduler.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
Transaction Processing System  Business Transactions are certain events that occur routinely in a business firm.  A transaction is a set of activities.
Frankfurt (Germany), 6-9 June Lars Garpetun – Sweden – Session 6 – 0415 EXPERIENCES FROM OPERATIONS AFTER A FULL- SCALE SMART METERING ROLLOUT REGARDING.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Nexus Workgroup CSEP Transition Topic June
Annie Griffith January 2008 UK Link Technology Refresh.
IGT Single Service Provision Requirements Update – 27 th March 2013.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
1) Establish & Identify Scheme 5) Evolve Scheme 4) Review & Modify Scheme Deliverables 3) Operate the Framework 2) Manage Performance Assurance Scheme.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Distribution Network Interruption - Initialisation 28 September 2010.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
Annie Griffith & Chris Fears September 2007 UK Link Technology Refresh.
ERCOT MARKET EDUCATION Retail 101. Retail Transaction Processing.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime UK Link Implementation Summary & Overview of Solution Options 9 th.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
COR3316: Implementation of UNC Modification 0451AV UK Link Committee – May 2014.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
SoS Report PAC – 13th December 2016.
PN UNC Workgroup Invoicing 4th October 2011.
Revised registration for unregistered sites
DSC Change Committee Summary – 7th November
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
Amendment Invoice AML/ASP Task Force Progress Report
Demand Estimation - Non Loggable Meters: Issue
SPA Processes for DM Sites
Deferral of Retrospective Updates Functionality
Joint Theft Reporting Review (from meeting 1st March 2019)
Procurement of NDM profiling data
MOD 640 INVOICING VALIDATION RULES
AQ BTU Form – Process & Timeline 29th September 2009
Daily Metered Supply Points
DN Interruption Phase II
AQ Review System Calculation Overview
Mod565 Sub Group Liability Caps
RG 175 – Encouraging Participation in the Elective Daily Metered Regime – Tactical Solution. (Indicative Costs) Joel Martin – 26 June 2008.
xoserve Services XOSERVE SCOPE Sites Register Maintenance Shipper
Enabling Large Scale Utilisation of Class 3
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Copyright National Grid Metering NGM Daily Meter Reads UNC RG 0175

Copyright National Grid Metering Overview of NGM Datalogger Read Process Flow Provide remote access to Gas Shippers Calculate and produce DM invoices Deliver Files to Customers Communication Cloud XOSERVE Meter & Logger Collection Modems Data Processing Server IX 35 HR

Copyright National Grid Metering Metscan / Metretek Main Activities Collect call data from units Schedule units for next call slot Store interval and time of call data Calculate and store exact 6am reading Create file’s at scheduled times DLCS Activity Receive files and validate for format Carry out validation routines (consumption, Convertor tolerance etc) Produce validation warnings and failures for investigation Create files, in appropriate formats and deliver to shedule Collect and record changes of shipper, DM Inter/ Firm and NDM status to apply to file delivery Produce monthly invoice for DM Asset rental and DM read provision charges Overview of NGM Datalogger Read Collection Process Collect Data from Datalogger Units Validate, store & Deliver to customers Provide remote access to Gas Shippers Remote Access System Provide shipper access to hourly interval consumptions to gas shippers. Update every 4 hours with hourly data Calculate and produce DM invoices DM Invoicing Produce monthly invoice for DM Asset rental and DM read provision charges Deliver Files to Customers

Copyright National Grid Metering Data DeliveryFrequencyDelivery PointOverview of Content 1. DM Daily Read FileDaily by 8:15amXoserveStart and End of Gas day readings for DM sites 2. Unique Site Daily Reading File Daily by 11amShippersStart and End of Gas day readings for Unique Sites 3. DM Bulletin BoardEvery 4 hoursRemote access system.Hourly consumption data for shipper access. 4. NDM Daily Reading fileDaily delivered at D+14XoserveValidated Gas day readings and consumption data for DM’s and NDM’s Dataloggers. 5. Hourly Interruptible DataEvery 4 hours from 6amNational Grid Gas - OperationsHourly consumption data. 6. Hourly DM Firm DataEvery 4 hours from 6amNational Grid Gas - OperationsHourly consumption data. 7. 7am Interruptible hourly dataDailyNational Grid Gas - OperationsInterruptible hourly Consumption data from 6 – 7am. 8. 7am DM Firm hourly dataDailyNational Grid Gas - OperationsDM Firm hourly Consumption data from 6 – 7am. 9. Interruptible Daily FileDailyNational Grid Gas - OperationsHourly consumption data from the previous 24 hours. 10. DM Firm Daily FileDailyNational Grid Gas - OperationsHourly consumption data from the previous 24 hours. 11. Unique Site Daily Reading File DailyXoserveStart and End of Gas day readings for Unique Sites. Daily Read Delivery Requirements

Copyright National Grid Metering Process Flows  Read Delivery  Liabilities  Asset Changes (MEX,DL Installs, DL Removals)  Faults & Maintenance  DM Queries From Shippers  Queries From Ops & Trading  All Invoicing  Information to IDN’s

Copyright National Grid Metering Read Delivery Process Flows 16.0

Copyright National Grid Metering

Liabilities Process Flows 2.0

Copyright National Grid Metering

Asset Changes Process Flows 1.0, 5.0, 5.1, 6.0, 7.0

Copyright National Grid Metering

Faults & Maintenance Process Flows 14.0, 15.0, 17.0

Copyright National Grid Metering

DM Queries From Shippers Process Flows 13.0

Copyright National Grid Metering

Queries From Ops & Trading Process Flows 18.0, 19.0

Copyright National Grid Metering

All Invoicing Process Flows 8.0, 9.0, 12.0, 11.0

Copyright National Grid Metering

Information To IDN’s Process Flows 20.0

Copyright National Grid Metering