Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16, 2003 202-586-7230.

Slides:



Advertisements
Similar presentations
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Advertisements

Sarah Radovan | Chief, Measurement and Reporting, Government of Canada Considerations for Building a Cost Efficient Environmental Technology Performance.
RESOLVE, Inc. National Geothermal Collaborative An Overview January 20, 2004.
Briefing on Historic Performance, Mandates, and Outlook by the Federal Performance Contracting Coalition Energy Savings Performance Contracting.
2011 ADC WINTER FORUM | PAGE 1 Developing Renewable Energy Projects on DoD Land Mr. Alan D. King Assistant Secretary of the Army for Installations, Energy.
Public Interest Energy Research –Natural Gas Program Status Presentation to Air Emissions Advisory Committee May 12, 2005 Philip Misemer California Energy.
Hydropower Development: Experience of Nepal
NFRA and Pending Legislation Ann Jochens GCOOS Regional Coordinator GCOOS Committees Meetings New Orleans, LA 27 November 2007.
The case of Saint Lucia IFC/World Bank Conference on Trade Logistics Washington DC - June 7, 2010 By Senator the Hon. Charlotte Tessa Mangal Minister for.
Program Name or Ancillary Texteere.energy.gov John Shonder, Director DOE Sustainability Performance Office May 21, 2015 Sustainability at the Department.
TRP Chapter Chapter 4.2 Waste minimisation.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Creating Energy-Efficient Data Centers
Energy Efficiency in the Clean Power Plan Opportunities for Virginia Mary Shoemaker Research Assistant Spring 2015 VAEEC Meeting May 11, 2015.
Environmental Impact Assessment (EIA): Overview
“Establishment of the Clean Development Mechanism (CDM) National Authority, Operational Framework and Support Systems for the Philippines”
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Phoenix Convention Center Phoenix, Arizona Introduction to UESC Webinar Project Financing UESC Basics: Project Financing Through your Utility Julia Kelley.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Isdefe ISXXXX XX Your best ally Panel: Future scenarios for European critical infrastructures protection Carlos Martí Sempere. Essen.
Overview of the SPDG Competition Jennifer Doolittle, Ph.D. 1.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
Phoenix Convention Center Phoenix, Arizona General Services Administration Areawide Contracts for Use With Regulated Utility Companies Institutional ChangeDoing.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
LBNL and Government Data Center Programs SC07 November, 2007 William Tschudi
Federal Energy Management Program Renewable Working Group Renewable Power Purchases at Federal Facilities By David McAndrew Federal Energy Management Program.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Phoenix Convention Center Phoenix, Arizona FEMP Training Supports FBPTA and FMI.gov Institutional Change Federal Buildings Personnel Training Act: Resources.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Highlights from the FEMP Advanced Metering Workshop September 25, 2003 Golden, Colorado.
Disaster Recover Planning & Federal Information Systems Management Act Requirements December 2007 Central Maryland ISACA Chapter.
Strengthening Science Supporting Fishery Management  Standards for Best Available Science  Implementation of OMB’s Peer Review Bulletin  Separation.
Public-Public Partnerships February 27, ADC WINTER FORUM | PAGE 2 Public – Public Partnerships Boot camp for Defense Communities Craig Zgabay.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
State EE/RE Policy Best Practices & Next-Generation Innovations: September Meeting Feedback on overall work plan and phasing of policies September 25,
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Office of Management and Budget NDIA Program Management Systems Committee May 3, 2005 EVMS Compliance Requirements David Muzio.
1 Workshop of the Ministry of Finance of the Czech Republic How to use European funds within a PPP project? Jana Maláčová Ministry for Regional Development/
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
© OECD/IEA 2011 Energy Efficiency in Central Asia: Challenges and Opportunities VII KAZENERGY EURASIAN FORUM World in Transition Shaping Sustainable Energy.
October, 2015 PREPA’s Transformation A Path to Sustainability.
Standardized national/sectoral baselines UNFCCC Technical Workshop on Joint Implementation Bonn, 16 October 2007 Manfred Stockmayer Managing Director Camco.
Opportunities for Greater Energy Efficiency of Security Equipment R. Neal Elliott, Ph.D., P.E. Associate Director for Research ACEEE.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia Review and Future Plan of.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
Technology Services – National Institute of Standards and Technology Implementing the National Technology Transfer and Advancement Act in the Federal Government.
The NEKIA Business Development Initiative Overview Annual Retreat Scottsdale, Arizona November 19-21, 2003.
1 DOE Office of Electricity Delivery and Energy Reliability David Meyer – May 2005 Developing Policy Options To Enhance Security of Energy Supply for Electricity.
Prepared by: Adam Pugh May Public Law Core Competencies Demonstrating Compliance DOE’s plan Facilities Management Institute Benefits 2.
Overview Federal Project Financing Vehicles by David McAndrew Federal Energy Management Program.
RFPEG Belize 2013 Public Utilities Commission. Objectives of RFPEG Belize 2013 PUC Act: Section 22 (1)It shall be the duty of the Commission to ensure.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Rick Khan, Director Federal Energy Management Program Department of Energy FEMP: Leading and Partnering with Agencies to Design and Build High Performing,
Low-Income Energy Assistance Program (LEAP) Lenore Dougan, Policy Advisor Regulatory Policy Ontario Energy Board Presentation to the Rental Housing Advisory.
Energy Savings Performance Contracts & Energy Service Companies
Seminar On Energy Audit Submitted To: Submitted By:
Colorado Department of Public Health and Environment April, 18, 2008
Managing Director - Resources & Strategy
Why Federal Energy Projects are Privately Financed
What does the State GIS Coordinator do?
Research and Test Reactor Safety: The Regulatory Perspective
SSG on WFD and agriculture
Task Force on Target Setting and Reporting TFTSR
Keith Jeffery Aquaculture development & bio-diversity support officer
Presentation transcript:

Metering - FEMP’s Perspective Presentation to the Interagency Energy Management Task Force by Ab Ream, FEMP O&M Program Lead October 16,

Ask not what a meter costs. Asks what it costs not to meter.

Metering makes good sense- you can’t manage what you can’t measure. Without a comprehensive and common sense approach, energy and cost saving opportunities will surely be missed, particularly with respect to O&M. If Charlie could talk, he’d say:

Effects of metering: ActionObserved Savings Installation of meters0-2% (the “Hawthorne Effect”) Bill allocation only2 ½ to 5% (improved awareness) Building tune-up5 to 15% (improved awareness, and identification of simple O&M improvement) Continuous Commissioning 15 to 45% (improved awareness, ID simple O&M improvements, project accomplishment, and continuing mgmt. attention)

HAWTHORNE EFFECT Initial improvement in a process of production caused by the obtrusive observation of that process. The effect was first noticed in the Hawthorne plant of Western Electric. Production increased not as a consequence of actual changes in working conditions introduced by the plant's management but because management demonstrated interest in such improvements

Pending Legislation would require: Within 180 days – DOE, GSA & DoD, with representatives from the metering industry, utility industry, energy services industry, energy efficiency industry, national laboratories, universities and Federal facility energy managers, shall establish guidelines. Implementation by FY 2010.

The Tasks at Hand:  Develop methods for calculating the cost and benefits of metering.  Define options for alternative financing of metering. Develop a process for preparing effective federal guidance on metering and the significance of the metering provisions contained in the 2003 comprehensive energy policy bill.

9/25/03 Metering Workshop Attendance: National Laboratories: 15 Metering Companies: 13 Federal Agencies: 10 Department of Energy/Regional Offices: 6 Consulting Companies: 6 ESCO/Utilities: 4 Universities: 1 Non-profit: 1 (Alliance to Save Energy) Conference call 8-9 a.m. Federal agencies: 10 FEMP HQ: 1 National Laboratories: 3

Guidance should be REASONABLE. Consider other program management reasons better project identification, improved operation and maintenance, and continuous commissioning) The effort can be a very cost effective stimulus to the energy program.

Federal buildings are very diverse. We need a FLEXIBLE framework for agencies to develop implementation plans that fit their situation. Implementation plans should consider: Specific constraints Opportunities Energy program management benefits

Metering should eventually include all energy sources (and water as economically appropriate) for which data use could result in better resource management. Sub-metering can include any meters on a multi-building facility beyond the utility revenue meter, or metering of large energy uses in an individual building.

The guidance should present a screening process that identifies the potential cost effective use of the data from meters in those buildings that should have a priority for metering. Guidance should outline a phased effort to start with easily accomplished, cost effective projects, and the use of early experience to refine follow-on efforts.

Initial actions: access to existing utility revenue meter pulse data, and metering of obviously significant buildings using rules of thumb (e.g. annual energy use over $X0,000). Follow-on phases would identify and prioritize additional buildings to be metered by a cost/benefit analysis based on assessment of the specific metering costs and related potential savings.

Possible Screening Criteria Energy unit costs, Ability to react to demand and charges Bill aggregation Total annual costs Energy intensity per square foot Potential energy savings projects etc.

Costs should include: meter cost, correct installation, data acquisition, communication, software licensing, wiring in-house or contracted analysis.

Guidance should address metering in ESPC’s and UESC’s Technical guidance should be as flexible as practical, such as requiring web based communication protocols rather than specifying a protocol. We should rely on private sector metering expertise.

Metering program reporting should be made through a simple change to the existing annual agency energy report. Exceptions for individual buildings should only be granted on the basis of security or economic justification based on the lack of savings to cover the costs.

Next steps: Prepare Draft Federal Advanced Metering Guidance Distribute the Draft to Identified Stakeholders Consider the Value of Holding an Advanced Metering Workshop in Washington DC under 2 scenarios: 1. Metering Provision in Comprehensive Energy Legislation passes 2. Metering Provision in Comprehensive Energy Legislation does not pass, or is delayed.

Questions? Comments? Suggestions? Thank you!