PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.

Slides:



Advertisements
Similar presentations
Siebel 1D – New Service Sales Order. Fill out the fields Remember: You can use the applet on the top and bottom interchangeably. You are modifying the.
Advertisements

ITSF STORE BUSINESS SOLUTION PRESENTATION. STORE MODULE INCLUDES: Material Management Purchasing Components Handling Shipments Receiving of parts Store.
Strategic Decisions (Part II)
Product Receiving, Storing, and Issuing
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Gilbarco Printer Assembly Process Flow Overview Next Generation Contract Manufacturing.
Warehousing.
Fergal Carton / AFIS MBA 642 / BIS Foundation. Fergal Carton / AFIS MBA 642 / BIS Foundation DELL Direct model Price for Performance –No resellers, retailers.
8-1 © 2010 The McGraw-Hill Companies, Inc. All rights reserved.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Enterprise Systems.
Inventory Flowchart Page 4 Cynthia Truong Annie Tang Yan Yan May Liu Mercy Muitah.
Collecting and Reporting Accounting Information Design of an effective AIS begins by considering outputs from the system. Outputs of an AIS include: 1.
CEO Juice Process for Sales Orders: Paperwork to Delivery Equipment Sales Order Process.
Navigate to the Service Request Orders View. Fill out the fields The Order Number will be blank until the record is saved. The Order Type should be Service.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-in B8 SUPPLY CHAIN MANAGEMENT.
Special Note: Physical Inventory Observation Importance of Inventory Major component of current assets on the balance sheet. Significant effect on net.
SchedulingProducingControllingSchedulingProducingControlling.
Sales and Distribution (SD)
Chapter 2 – Enterprise Systems
2014 Reliance Manufacturers Rep Meeting AGENDA: Customer Relations Overview Manufacturers Rep Expectations Overview Quarterly Review Discussion Commission.
From Research Prototype to Production
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Copyright 2013 GHSP | A JSJ Company 2 SUPPLIER TRAINING – Advance Shipping Notice (ASN) Guidelines Discover, Align, Deliver. Worry Free. GHSP.
OH 3-1 Receiving and Storing to Maintain Quality Food Production 3 OH 3-1.
Trade Management  Module 4.  Learning Objectives:  Managing receivables  Securing receivables  Sales documentation.
Computerized Manufacturing Systems
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Chapter 8 Transaction Processing, Electronic Commerce, and Enterprise Resource Planning Systems.
Software Quality Assurance Lecture # 6 By: Faraz Ahmed.
Barcodes and MDS Easy ways to speed up and increase accuracy using barcodes in MDS Monday June 14, 2010.
Presented by D’Sunte Wilson Microsoft Dynamics Nav (Navision) Training – Day 2.
7-1 Computerized Accounting Systems Electronic Presentation by Douglas Cloud Pepperdine University Chapter F7.
SchedulingProducingControllingSchedulingProducingControlling.
Training Day 5 Customer Order Processing Recipe Manager © User Training September 2014 Recipe Manager Vydata Systems Training Presentation.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
8–18–1 Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Accounting Information Systems: A Business Process Approach Chapter Three: Documenting Accounting Systems.
Issue documents by local purchasing dept. security check Document control & issuing slip Unpacking, counting and put in suitable palletes Local Purchasing.
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
SchedulingProducingControllingSchedulingProducingControlling.
Project Based on fictitious Coffee Roasting CompanyCoffee Roasting Company Automatic Order Processing System – –Process “projected” Accept order from customer.
www. magnifictraining.com Oracle apps scm online training Online | Classroom | Corporate| Training | Certification | Placement.
Oracle apps scm Online Training & Corporate Training Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC.
IIMM, Bangalore Branch1.  They are ;  1)PRODUCTION  a)Production of H.D.P.E Pipes  b)Production of Tanks  2)STORE  3)MAINTAINANCE  4)DAISPATCHING.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
Av-Tech Industries- Quality, Service and Precision Kitting
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Kroger Food Depot – “a Proposed Walk-Through”
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
A clerk in the sales department prepares two copies of an invoice, detailing the quantity and price information and forwards them to the accounts receivable.
SM KM Consignment Model
Module 4 Revenue Cycle Using SAP Individual Assignment
Ensuring Successful Outcomes Judy Lew, Purchasing Manager
SQA01 Guidance Material: FAI Review
Job Costing Process Using Fabritrak
DATA FLOWS & PROCESSING
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
A clerk in the sales department prepares two copies of an invoice, detailing the quantity and price information and forwards them to the accounts receivable.
Ensuring Successful Outcomes Judy Lew, Purchasing Manager
Ensuring Successful Outcomes Judy Lew, Purchasing Manager
Order procurement Input: customer need Sales: identifies customer need
Manufacturing Production Planning
A clerk in the sales department prepares two copies of an invoice, detailing the quantity and price information and forwards them to the accounts receivable.
Module 4 Revenue Cycle Using SAP Individual Assignment
Company X Process Mapping Training
Ensuring Successful Outcomes Judy Lew, Purchasing Manager
Accounting Information Systems: A Business Process Approach
Accounting Information Systems and Business Processes - Part I
Presentation transcript:

PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping

OUR CONSTANT GOALS  Off the shelf for 90 percent of our orders  Binned and routed to production within 48 hours  Expedite orders binned and to production within 24 hours  Special order requirements addressed in 24 hours and ordered ASAP  Ensure that all orders are a high quality product and meet the required ship date.

Work Order Travelers  The documents that get the ball rolling  Complete information is needed from sales reps and customers in order to produce a Work Order and get it into production process  Delay in information can cause a critical delay in the order being processed and shipped

The model number on the work order traveler specifies the meter  Work order travelers and SIP DC24-SVAO5 components for binning shown

VENDORS, Machinist & FABRICATORS, SUPPLIERS  CONTINUOUS OVERVIEW OF TURNKEY AND MACHINING & FABRICATION SCHEUDLES  SUPPLIER RESEARCH, QUALITY, PRICING, DELIVERY  FLEXIBLE SCHEDULING AND MAINTAINING A BALANCED INVENTORY THAT CAN MEET SALES REQUIREMENTS

PARTS RECEIVED QQQQUALITY CONTROLLED AND VERIFIED

Weekly & Daily Overview  W ork orders are received by Production for primary review of any special gas or calibration requirements and Production Manager sign off.  Work orders are then routed to Operations and Purchasing  Work order model numbers and quantities verified  SPECIALS and EXPEDITES, special parts / component requirements addressed  Work order binning process takes place where all components and parts associated with each specific work order and meter are pulled together for production process  Upon binning completion work orders are routed to their first phase in production

PRODUCTION PROCESS  The binned orders are routed to temperature calibration.  From that process they are moved to pre-assembly where they are prepared for flow calibration.  Once flow calibration is completed they are routed to final assembly and programming.  When that phase is completed and verified the meters are routed to QA for final check.  When QA has completed this process the meters are released to shipping with their required documents and if included all associated hardware.

SOME PHASES OF PRODUCTION

METERS READY TO SHIP  WHEN SIGNED OFF BY QA, ORDERS ARE RELEASED TO SHIPPING.

THE FINAL TOUCH: SHIPPING  Final contents check list verification  Proper container and packing material selected  Check work order data base for shipping address and method  Ready for carrier pick up