Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.

Slides:



Advertisements
Similar presentations
Overcoming Customer Constraints on Requirements Documents Presented by: Robert Smole Presented by: Robert Smole November 5, 2008 Sub-Optimization of Systems.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
S Y S T E M S E N G I N E E R I N G.
DESpec spectrographs Jennifer Marshall Darren DePoy Texas A&M University.
SOME COMMENTS ABOUT THE GIANT CHINESE SOLAR TELESCOPE CONCEPT JACQUES M. BECKERS Beijing August 6 – 8, 2011.
Polarimetry Christoph Keller. Polarimetry Requirements Polarization sensitivity: amount of fractional polarization that can be detected above a (spatially.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
The Heat Stop 25 August 2003 ATST CoDR Dr. Nathan Dalrymple Air Force Research Laboratory Space Vehicles Directorate.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
NGAO System Design: AO System (WBS 3.2) & Laser Facility (WBS 3.3) Design Inputs & Outputs Peter Wizinowich NGAO Team Meeting #9 August 24, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
Physics 681: Solar Physics and Instrumentation – Lecture 6 Carsten Denker NJIT Physics Department Center for Solar–Terrestrial Research.
WMKO Next Generation Adaptive Optics: Build to Cost Concept Review Peter Wizinowich et al. December 2, 2008 DRAFT.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
Engineering Systems of.
Effective Methods for Software and Systems Integration
ATST Science Requirements ScienceTeam. Outline/Scope State Requirements – focus on top level No attempt to give detailed explanation or justification.
Software Engineering 2003 Jyrki Nummenmaa 1 REQUIREMENT SPECIFICATION Today: Requirements Specification Requirements tell us what the system should.
August 2 and 3, 2010 KOSMOS Design Considerations Jay Elias.
SE-02 SOFTWARE ENGINEERING LECTURE 3 Today: Requirements Analysis Requirements tell us what the system should do - not how it should do it. Requirements.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Collaboration of BBSO/NST and SOT Haimin Wang Big Bear Solar Observatory 1. Six-station Global Full Disk Halpha Network –Large scale structure of flares.
Software Engineering – University of Tampere, CS DepartmentJyrki Nummenmaa REQUIREMENT SPECIFICATION Today: Requirements Specification.
M2 and Transfer Optics Thermal Control 25 August 2003 ATST CoDR Dr. Nathan Dalrymple Air Force Research Laboratory Space Vehicles Directorate.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
Progress Report Geo-CAPE Coastal Ecosystem Dynamics Imager (CEDI) IRAD Repackaging Study Jason Budinoff / GSFC Cathy Marx / GSFC May 12, 2011.
SKA System Design Kobus Cloete 9 December 2010 AAVP Workshop "Exploring the Universe with the world's largest radio telescope"
M1 Thermal Control 25 August 2003 ATST CoDR Dr. Nathan Dalrymple Air Force Research Laboratory Space Vehicles Directorate.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Software Engineering1  Verification: The software should conform to its specification  Validation: The software should do what the user really requires.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
COSMO Large Coronagraph Preliminary Design Review
Extended Detector Cutoff Considerations WFIRST Project Office May
Mount and Coudé Lab Thermal Control 25 August 2003 ATST CoDR Dr. Nathan Dalrymple Air Force Research Laboratory Space Vehicles Directorate.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
MUSE KO: MUSE Support at ESO ‘customer’  MUSE Team Created (ESO-customer), contacts with the Consortium and support activities on-going  Budget and Manpower.
1 Integrated Modeling Stephen Merkowitz. 2 May 13, 2003 Integrated Modeling LISA has intricate interactions between subsystems that require an integrated.
Testing Overview Software Reliability Techniques Testing Concepts CEN 4010 Class 24 – 11/17.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
EMIS Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for.
Camera PDR/CD1 Planning 19 September 2008
Introduction to Project Management
Keck Observatory Status
CINEMA System Engineering
KOSMOS Design Considerations
NGAO System Design Project Plans and Schedule
Software Development Process
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
Launch and On-orbit Checkout
GIFTS Blackbody Subsystem Critical Design Review Blackbody Requirements Flowdown Fred Best 9 March 2004.
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
HMI Top Level Requirements
The development process
Instrument Overview Larry Springer HMI Program Manager
Evaluate the integral {image}
ATST Instrument Interface Overview
Information system analysis and design
Presentation transcript:

Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering

The Flow-Down Process ATST Science Requirements Design Requirements

The Flow-Down Process ATST Science Requirements Design Requirements Strawman Concepts Functional and Performance Requirements

Getting to a Concept – Input Baseline Telescope Concept Strawman Concepts Experience with Similar Telescopes Funded Studies Trade Studies Engineering Analysis Obvious Constraints Work Shops

Getting to a Concept – Ideas

Testing the Concept Science Requirements Strawman Concept Error Budgets Sub-System Specs, Design Requirements Design and Development of Systems and Subsystems Performance Evaluation Cost Evaluation PDR Phase OK? (CoDR) Yes Conceptual Design Review: What passes this test? What work remains? No

Some Hard Constraints from the SRD Resolution, photon flux and sensitivity require a four-meter class telescope. Resolution requirement also leads to a high-order adaptive optics system. Wavelength coverage from 0.3 to 28  m leads to an all- reflecting telescope.

Some Challenging Requirements Resolution Requirement (Image Quality) –Even with a 4-meter aperture, a world-class site, high-order AO system, this remains challenging. Stray Light Requirement (Coronal Observations) Polarization Requirement (Polarimetry)

Design Requirements Documents M1 Mirror Assembly –SPEC-0007 (Ron Price) M2 Mirror Assembly –SPEC-0008 (Ron Price) Enclosure –SPEC-0010 (Mark Warner) Telescope Mount Assembly –SPEC-0011 (Mark Warner)

The Systems Approach The diverse and sometimes competing requirements placed on ATST forces a rigorous and aggressive systems approach during all phases of the project.

ATST Systems Orientation

Responsibilities of Systems Engineering Design Requirements Flow Down Document and Drawing Control Interface Control Error Budgets Standards End-to-End Modeling Quality Assurance Plan Acceptance Test Plans Integration Plan

Design Requirements Flow Down Document and Drawing Control Interface Control Error Budgets Standards End-to-End Modeling Quality Assurance Plan Acceptance Test Plans Integration Plan Responsibilities of Systems Engineering – CoDR Emphasis

Systems Overview Telescope Systems and Subsystems Definition Interface Control and the N 2 Diagram Documentation Control Error Budgets – Top Down Error Budgets – Bottom Up

Glossary and Acronym List

Document and Drawing Control

Interface Control and the N 2 Diagram

N 2 Diagram Detail

Top Level Systems 1.0Telescope Assembly 2.0Adaptive Optics 3.0Instrument Systems 4.0High-Level Controls and Software 5.0Enclosure 6.0Support Facility and Buildings

Telescope Assembly Subsystems 1.1Telescope Mount Assembly 1.2M1 Assembly 1.3M2 Assembly 1.4Feed Optics 1.5Thermal Systems 1.6Scattered Light Control Probably specific to D&D Phase. Likely to be reabsorbed later.