Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated.

Slides:



Advertisements
Similar presentations
A CASE STUDY in actual energy conservation
Advertisements

Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Intro to Enersol What is Retro-commissioning? Define Benefits of Retro-commissioning Define Retro-commissioning Process Discuss Retro-commissioning Findings.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Process & Benefits of Monitoring Based Commissioning David Jump, Ph.D., P.E. Principal Quantum Energy Services & Technologies, Inc.
HVAC Test and Balance And The Lodging Industry. Source: Florida Power.
The Value of DOD Installation Energy Management Control Systems (EMCS) and Command Centers for Improved Operations and Increased Energy Efficiency Moderator:
UTPA Energy Conservation Initiatives Oscar Villarreal Director, Facilities Management David Ortega Assistant Director, Energy Manager.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
Technical And Financial Benefits Of Retro-Commissioning Initiatives Society of American Military Engineers Northern Virginia Post January 6, 2011 Presented.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Too hot, too cold, just right Presented by: Russell Smith.
Energy Management with the use of an Intelligent Building Management System.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
Department of Facilities Management Maintenance & Operations.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) CenterPoint Energy Healthcare Energy Efficiency Program (HEEP) November 2013.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Rooftop Package HVAC Operations and Maintenance Measures: David Baylon Stan Price Bob Davis.
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
Phoenix Convention Center Phoenix, Arizona Army Reserve Metering Program Integrated EnergyMetering Strategies Marcus De La Rosa Pacific Northwest National.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Mike Eardley, PE, LEED AP, CCP Director of Commissioning CannonDesign Brian Berg, Jr., PE, LEED AP, CSI Principal Berg Engineering Consultants, Ltd. April,
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
Phoenix Convention Center Phoenix, Arizona Net Zero for the Army Reserve Sustainability Track Getting to Net Zero: Energy, Water and Waste Amy Solana Pacific.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Phoenix Convention Center Phoenix, Arizona Targeted E4 Re-Tuning at GSA Facilities Integrated Energy Low/No Cost Solutions through Building Automation.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
10/18/20151 Unlocking the Secrets of HVAC Nash-Rocky Mount Public Schools.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
International Newspaper Group 2008 Gannett’s Green Campaign.
Phoenix Convention Center Phoenix, Arizona Integrative Design: Deep Energy Approach Track 6: Integrated Energy Session 5: Integration of the Energy Industry.
Phoenix Convention Center Phoenix, Arizona Facility Energy Audits Mike Gutowski Johnson Controls August 12, 2015 Agency Energy ManagerEnergy Audits: Implementing.
Overview of Data Center Energy Use Bill Tschudi, LBNL
Phoenix Convention Center Phoenix, Arizona ESPC Overview Project FinancingESPC Large and Small: The Basics of ESPC Tom Hattery, DOE-FEMP Federal Project.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
COMMISSIONING: REDUCING THE CARBON FOOTPRINT (…and Maintenance Costs) (…and Operating Costs)
Using Technology to Manage Energy Bob Schoch-Director of Business Administration Tom Schneider-Supervisor of Operations.
Introduction to HVAC Optimization
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
Prepared For: Prepared By: 100 Montgomery Street, Suite 600 San Francisco, CA Market Street San Francisco, CA The Benefits of Retrocommissioning.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
Commercial Energy Assessments City of Ames Emily Rice The Energy Group.
Metering and Monitoring  The Business Case.  Implementing the project.  Benefits – accurate data and data analysis.  On-going challenges.
Energy Program Implementation Reducing Operational Expense by Benchmarking and Continuous Improvement Practices.
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Energy Solutions for Business Owners Presented by: [Put your name here] Welcome to... Your Logo Here.
Sean Weber Energy Engineer
The Data Center Challenge
By: John D. Villani, P.E., LEED AP, QCxP, CEM, GBE
Story of No-Cost Energy Savings at Ohio Union
FMANZ SUMMIT % OF YOUR CURRENT ENERGY USE IS PROBABLY WASTE
Lecture Objectives: Answer questions related to HW 4
2018 Retro-Commissioning (RCx) Program
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Presentation transcript:

Phoenix Convention Center Phoenix, Arizona HVAC Re-tuning at GSA and Army Reserve Facilities: A Low-Cost Path to Energy Efficiency and Cost Savings Integrated Energy Low/No Cost Solutions through Building Automation System Control Technologies James Goddard and Danny Taasevigen Pacific Northwest National Laboratory August 13, 2015

Energy Exchange : Federal Sustainability for the Next Decade A systematic process to identify and correct building operational problems that lead to energy waste Implemented primarily through the building control system at no cost other than the labor required to implement May include small, low-cost repairs, such as replacing faulty sensors Includes identifying other opportunities for improving energy efficiency that require capital investment Might be thought of as a scaled-down retro- commissioning focused on identifying and correcting operational problems 2 What is Re-tuning

Energy Exchange : Federal Sustainability for the Next Decade Improve the building’s energy efficiency through low-cost and no-cost operational improvements (mostly through building controls) Identify opportunities to increase the building’s energy efficiency Adjust set points, schedules, economizer operations, etc. Identify system and equipment problems requiring physical repair Identify and pursue the big energy saving opportunities 3 Purpose of Re-tuning

Energy Exchange : Federal Sustainability for the Next Decade Major Focus Areas in Re-tuning – Occupancy scheduling – Discharge-air temperature control – Discharge-air static pressure control – Air-handling unit (AHU) heating & cooling – AHU outside/fresh air makeup – AHU economizer operation – Zone conditioning – Central plant Operations – Meter profiles 4 Re-tuning Process

Energy Exchange : Federal Sustainability for the Next Decade Army Reserve Command – Regional Energy Manager and local site staff – 2-3 buildings per site – Building types include office, drill hall, storage and maintenance – HVAC varies from packaged to built- up systems – Building occupancy hours vary from day-to-day, week to week with sporadic weekend use – O&M staff limited – May or may not have a BAS connected to HVAC equipment Programmable Thermostats possible – Whole building energy data sporadically available – BAS trend data and remote access difficult 5 Examples of Different Re-tuning Applications General Services Administration – Regional Energy Manager and local site staff – 1 building per site – Large commercial office buildings – HVAC almost always consists of built- up systems – Building occupancy hours fit typical commercial building office space (Monday through Friday 6:00 a.m. – 6:00 p.m.) – O&M staff consists of several positions (electrical, mechanical, plumbing, etc.). – Always have a central BAS connected to majority of HVAC systems – Whole building energy data almost always available – BAS trend data and remote access possible

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the Army Reserve Army Reserve Re-tuning Steps – Pre-site visit Call with the Region Energy Manger and the local site staff Questions asked to the site staff and the energy manager – Ask for historical building control data – Building Control Vendor – HVAC equipment in the building – Problem areas – Level of access to the building controls – Does the staff use the building control system – Schedule a site visit 6

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the Army Reserve Army Reserve Re-tuning Steps-cont. – Site visit Walk down the building Look at the HVAC equipment Look at the building control system Identify re-tuning measures Implement measures Train staff and energy manager on measures that are implemented Identify additional energy measures that can be turned into capital projects for the 7

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the Army Reserve Army Reserve Re-tuning Steps-cont. – Post site visit Trip report Estimation of savings List of recommendations Project development 8

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Case Study for the Army Reserve Building Overview – Built within the last 5-7 years, 2-stories, 200,000 square feet – Used for the reserve command and as a training center on weekends – 24/7 operation of the HVAC equipment – Built-up air-handling units (AHUs) with variable-air-volume (VAV) boxes – Air-cooled chillers and hot water boilers with variable speed secondary loops – Full BAS integration of AHUs, chillers, boilers and VAV boxes Building Controls Review – Occupancy schedules did not work in the controls – Economizer dampers were not functioning correctly – Chillers were active during cool outdoor temperatures – AHU discharge-air temperature set points constant at 55°F – Constant AHU discharge static pressure sets points – Constant chilled water supply temperature set point Re-tuning Opportunities – Scheduling, static pressure reset, discharge-air temperature reset – Other? 9

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Case Study Results for the Army Reserve 10 Average daily electrical consumption before and after re-tuning show significant savings from re-tuning implementation Before re-tuning After re-tuning

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Future for the Army Reserve The Army Reserve Command understands the value in re- tuning Infrastructure limitations create difficulty with re-tuning process and sustaining re-tuning savings Adoption of Enterprise BAS System can enable continuous monitoring, analysis and reporting of Army Reserve buildings, as well as provide access for continuous re-tuning of control sequences. – Benchmarking – Trend analysis – Diagnostic Tools – Performance Dashboards – Monitoring of renewables 11

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Future for the Army Reserve 12

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the GSA GSA Re-tuning Steps – Pre-site visit Screening evaluation to determine likelihood of re-tuning success Is the building likely to succeed (yes/no)? 13

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the GSA GSA Re-tuning Steps Pre-site visit cont. – Call with the Region Energy Manger and the local site staff Review building history Review current energy use (based on utility bills) Discuss current and on-going energy projects Discuss problem areas in the building Plan trip logistics Provide BAS trending requirements list Remote BAS access (if possible) 14

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the GSA GSA Re-tuning Steps Pre-site visit cont. 15

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the GSA GSA Re-tuning Steps Site Visit – 2-3 days onsite – Review trend data/proposed measures—In-Briefing – Walk down the building – Review the BAS – Finalize proposed measures and discuss with site staff – Implement agreed upon control system measures with site staff (training) Monitor building response to implementation Start conservative with recommendations – Document all changes, before and after – Formal Exit Briefing 16

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the GSA GSA Re-tuning Steps Post Site Visit – Deliver Interim Report to building and regional staff within 8 weeks of site visit which includes: Details on recommended measures and implemented measures Energy savings estimates for implemented measures and total for all recommended measures Monitoring plan for site staff’s troubleshooting and long-term monitoring of implemented measures – Post-site visit implementation call Discuss implemented measures, any issues or complaints, changes etc. Discuss plan for further implementation of measures that were not implemented onsite – Monitor BAS trends, interval meter data, and utility data for 6 months to validate re-tuning implementation and monitor other performance- related issues – Offer /phone support to site staff as-needed 17

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Model for the GSA GSA Re-tuning Steps Post Site Visit-cont. – Deliver Final Report to building and regional staff after 6 month monitoring period which includes: Actual energy and cost savings from Targeted E4 efforts Pre and post Targeted E4 energy use intensity (EUI), and project EUI after 12 months 18

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Case Study for the GSA Building Overview – Built within the last 20 years, 16-stories, 600,000 square feet – Typical office building with courthouse space – Scheduled operation of the HVAC equipment (Monday through Friday 6:00 a.m. to 6:00 p.m.) – Built-up air-handling units (AHUs) with variable-air-volume (VAV) boxes – Water-cooled chillers and combination of condensing and non-condensing hot water boilers with variable speed secondary loop control – Full BAS integration of AHUs, chillers, boilers and VAV boxes Building Controls Review – Static pressure reset strategy had been overridden by operator (modified maximum and minimum limits to be equal) – Night setback strategy routinely started AHUs as early as 12:00 a.m. during the heating season – Optimal start strategy was configured for up to 4 hours of runtime prior to building occupancy Re-tuning Opportunities – Re-implement static pressure reset, modify night setback and optimal start strategies 19

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Case Study Results for the GSA 20 6 months after site visit, 12.6% whole building energy savings measured (8.6% electricity and 15.7% natural gas) 1.1 year simple payback for Targeted E4 at this building

Energy Exchange : Federal Sustainability for the Next Decade Re-tuning Future for the GSA The GSA has been an advocate for re-tuning for over 7 years, helping to improve the model Although Targeted Re-tuning for the GSA improves building efficiency and saves energy at a 1-2 year payback, long-term improvement of their energy portfolio will require more saturation – Current program covers buildings per year Data-driven monitoring and diagnostics, although not required, helps to achieve optimal re-tuning results – Future direction may include data driven detection and automated re- tuning for basic principles – Site visits, training, and hands-on implementation currently offers the best results for re-tuning 21

Energy Exchange : Federal Sustainability for the Next Decade 22 Re-tuning Training Materials

Phoenix Convention Center Phoenix, Arizona THANK YOU!! -- QUESTIONS? James Goddard Danny Taasevigen