Title 40/CCA Advisory Committee 13 MAY 2009. UNCLASSIFIED Title 40/CCA Advisory Committee 22 Agenda for 5/13/09 TIMETOPICDETAILSFACILITATOR 10 minRecap.

Slides:



Advertisements
Similar presentations
Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
Advertisements

Ledger Size DEFINE / BACKGROUND INFORMATION Problem Statement: Goal OR Objective: Scope (if needed):  Problem Statement  Project Scope  Goal Target.
Continuous Process Improvement (CPI) Program Update Colonel Ric Sherman, United States Army Office of the Assistant Deputy Under Secretary of Defense for.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Intro to LSS1 LSSG Green Belt Training Introduction to Lean Six Sigma.
Program Update ASMC Meeting May BMMP Mission “Transform business operations to achieve improved warfighter support while enabling financial accountability.
Using Microsoft Project for Implementation of Six Sigma Projects A Tools and Tips Presentation Nora Gessert, Pcubed.
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
Welcome to Lean Six Sigma Green Belt Training
1 David M. Wennergren Ray Boyd 9 April 2007 DRAFT Lean Six Sigma Update For Mr. John G Grimes and Dr. Linton Wells DoD CIO / ASD(NII)
Black Belt Project Storyboard Template
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Items Required for Process Hand-off
Office of Process Simplification May 20, 2009 Planning an Improvement Project.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
Applying Business Process Re-engineering
UNCLASSIFIED Title 40/CCA Working Team ACIMD 1 DoD Title 40/CCA LSS Initiative Global Information Grid (GIG) Architecture/(Information Support Plan (ISP)
DoD Title 40/CCA LSS Initiative Working Team Meeting 6 Nov 08.
1 Clinger Cohen Act (CCA) (Title 40): An Emerging New Approach to Oversight – Overview and Program Pilot June 27, 2006 Mr. Edward Wingfield Commercial.
DoD Title 40/CCA LSS Initiative Sub-Team Update: How to Identify a LSS Improvement Opportunity (Project) 7 NOV 2008.
Define Tollgate Checklist
Insert: Title of Improvement Read Out Date:. 2 Objectives for Today’s Session Share results of improvement effort Demonstrate fact-base, analytical approach.
TITLE 40 CCA Outcome Measures of Effectiveness (MOEs) Revision of mission-related and administrative processes (BPR) Post Implementation Review (PIR) Briefing.
Power to the Edge A Net-Centric DoD NII/DoD CIO Performance and Results-based Management of IT and NSS Investments Measures of Effectiveness (MOEs) and.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
1 Presented to: Mr. Dave Wennergren (NII/DoD CIO) Dr. Nancy Spruill (OUSD/AT&L) May 5, 2009 Title 40/CCA Certification and Confirmation Process Improvement.
CCA LSS Team #2 Post Implementation Review (PIR) Kick-off Meeting 13 Jan 2009 CS4 Room 310 Small V3.
Lean Six Sigma Project Briefing Type Briefer Organization Here
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
1 Presented to: Mr. Dave Wennergren (NII/DoD CIO) Dr. Nancy Spruill (OUSD/AT&L) December 22, 2008 Lean Six Sigma Project Briefing Title 40/CCA Certification.
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Power to the Edge A Net-Centric DoD NII/DoD CIO IT Acquisition Management Transformation Rapid Improvement Team (RIT) Principals Meeting November 18, 2003.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
MOE/PIR Sub-team: Title 40/CCA LSS Initiative 30 Sep 08.
Analyze Wrap Up and Action Items
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
TM 720: Statistical Process Control DMAIC Problem Solving
Lean Six Sigma Road Map Improvement Process Road Map
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Nurturing Next Generation Governance Globally
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
MDD to Milestone A Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Project Management Essentials Connecting PI to PM
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
OPS/571 Operations Management
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
Improve Phase Wrap Up and Action Items
Measure Phase Wrap Up and Action Items
Validation by Process Owner Validation by Project Leader
Lean-Green belt six sigma program
Practical Assessment Project Template – DMADV
Presentation transcript:

Title 40/CCA Advisory Committee 13 MAY 2009

UNCLASSIFIED Title 40/CCA Advisory Committee 22 Agenda for 5/13/09 TIMETOPICDETAILSFACILITATOR 10 minRecap Key Items from 8 April meeting Introductory Orientation to DEPMSTomatra 45 minCCA LSS Project 1 - 3Status -Projects #1 and #2 Tollgate presentations (Define) -Project #3 Overview Project Belt/Lead 30 minCPI/LSS Project Overview: Army, CIO/G6 Army CIO/G6 uses LSS methodologies to improve Certification, Accreditation and Compliance processes Allen Haines 15 minReview Sponsor Update DCIO Overview of monthly Sponsor update - 5 MAY 09 Ed 10 minWrap-Up/Action ItemsNext Steps & Next meeting 10 JuneTomatra

Lean Six Sigma UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 33 MOE Process Charter Problem Statement: A three year sampling of data from the Initial Capabilities Document (ICD) reveals that 46% (61 out of 132) failed to articulate outcome measures (formerly measures of effectiveness (MOEs)) thereby potentially increasing requirement changes Business Case: Ability to assess mission area capability need Reduce costs and schedule overruns associated with requirement changes due to lack of outcome measures Provide needed capability to war-fighter on-time at expected cost Unit: Measure of Effectiveness in Initial Capabilities Document Defect: ICD failed to articulate measurable MOEs prior to MS A Customer Specifications: MOEs defined in the ICD, pre-MS A, that are measurable to satisfy the desired effect to fill the capability gap. MOE must be quantifiable and a measure to what degree the real objective is achieved. Measure Start: End of Capabilities-Based Assessment Process and submission of an ICD into the JROC Knowledge Management/Decision Support (KMDS) system Measure Stop: Material Development Decision (MDD) Scope: New IT/NSS investments under the purview of the Logistics (L), Command & Control (C2) and Net-Centric (NC) functional capability boards (FCB). Timeline PhasePlannedActualStatus Define11 Feb 095 May 09 Measure 26 Feb 09dd mm yy Analyze 05 Mar 09dd mm yy Improve 20 Mar 09 dd mm yy Control 30 May 09 dd mm yy Having MOEs in place, pre-MS A, can reduce investment costs Team Members NameRoleAffiliationDACI Ron RichardsonBlack BeltDoD CIO Driver LoraLee KodzoMaster Black BeltOSD/IBM Driver Dave WennergrenSponsorDoD CIO Approver Ed WingfieldProcess OwnerDoD CIO Approver

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 444 Cross Functional Team Team Members NameRoleAffiliationDACI Ron Richardson Black BeltDCIO Driver LoraLee Kodzo Master Black BeltOSD/IBM Driver Dave Wennergren Sponsor Approver TBD Process Owner Approver Greg SeitzSMEArmy CIO/G6Approver Darlene KernerSMEOSD ATL Contributor Austin HuangfuSMEDOT&E Contributor Bill CooperSMEJ8 Contributor Len SadauskasSMENII/DoD-CIO Contributor Greg ProtheroSMEAF/A5RD Contributor Franz Helchinger,SMEOPNAV, N912D1 Contributor John AllenSMEDOTE Contributor Laurence PaulsonSMEOSD-ATL Contributor Tom McGowanSMEOSD ATL Contributor Jack ZavinSMENII/DoD-CIOInform Neal ZankSMEAF CIOInform

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 555 Process Scope Scope of Team’s Project ICD EMDDICD DCR CBA MSA Technology Development LRIP Draft CDD CPD ICD MDDMS A PDR MS BMS C Currently Out of Scope CJCSI G JCIDS Process

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 666  Project Charter  Problem Statement  Defined Benefits  Business Case  Data Collection Plan  Data Collected  Initial characterization of the extent of the problem  Potential Xs  Improvement Strategy  DOE  Value Stream Map  Theory of Constraints  Lean  Control Plan  Documented SOPs  Audit Plan  Reaction plan  Measurable Y  Customer Specs/VOC  Determine Defect  Measurement System Analysis / Validation  Data Display: Pareto Charts; Fish Bone / C&E; Histograms;  Improvement Analysis  Mistake Proofing  Risk management – FMEA  Cost-Benefit analysis  Feasibility analysis  Communication to Impacted Areas  Define Scope  Cross Functional Team  Data Presentation  Run Chart; Histogram; Mean/Stand. Dev.  Root Cause Analysis  XY Matrix  FMEA  Implementation  Plan  Execution  Project Documentation  Statistical evidence of improvement  Project Plan  SIPOC  Value Stream Map  Initial Process Capability, CTQs, CTPs  Validated Critical X’s  Evidence of Improvement  Pilot Results  Indicated actions  Transfer to Project Owner  “Y” Performance Target  Update of Project Charter  Final Report I accept the Define Tollgate. Signed: I accept the Measure Tollgate. Signed: I accept the Analyze Tollgate. Signed: I accept the Improve Tollgate. Signed: I accept the Control Tollgate. Signed: (Sponsor) (Process Owner) (MBB / PE Leader) DefineMeasureAnalyzeImproveControl MOE LSS Project Tollgates          

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 7 77 #2 Improving Post Implementation Reviews (PIRs) PIR data enables capability portfolio development trend analysis and identification of best practices Team Members NameRoleAffiliationDACI Rick Perron Green BeltDoD CIO Driver Ed Wingfield SponsorDoD CIO Approver Tomatra Minor MBBDoD CIO Driver Dave Wennergren Process OwnerDoD CIO Approver LSS Charter Problem Statement: PIRs are not being conducted by all MAIS and MDAP solutions for capability gaps, thereby hampering the DoD’s ability to identify and report on capability portfolio development trends and best practices. Business Case: Develop a plan to – Ensure that PIRs are conducted Implement standardized reporting Enable analysis of trends and identify potential capability development best practices Unit: PIR Plan & Report Defect: PIR not conducted, inability to conduct trend analysis and to identify best practices Customer Specifications : Ability to develop PIR Report trend analysis and best practice identification Start: Receipt of PIR Plan Stop: PIR Report issued, recipients complete analysis of trends, and best practices documented Scope: New IT/NSS investments under the purview of the Command & Control (C2) and Net-Centric (NC) functional capability boards (FCB). Timeline PhasePlannedActualStatus Define22 Jan 095 May 09 Measure20 Feb 09 dd mm yy Analyze 27 Feb 09 dd mm yy Improve 06 Mar 09 dd mm yy Control 20 Mar 09 dd mm yy

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 8 88 PIR Cross Functional Team Team Members NameRoleAffiliationDACI Rick Perron Green BeltDCIO Driver Tomatra Minor Master Black BeltNII/DoD CIO Driver Ed Wingfield SponsorDCIO Approver Dave Wennergren Process OwnerDASD, IMI&T Approver 1. Len Sadauskas DCIO Contributor 2. Amelia Grazioso DCIO Contributor 3. CDR Ben Torreon J6 Contributor 4. Don Meadows NII Contributor 5. Major Jeff Delvecchio NII Contributor 6. John Burson DON CIO Contributor 7. Austin Huangfu DOT&E Contributor 8. Jim Oliver Army CIO/G6 Contributor 9. Tom Hickok DCIO Contributor

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 9 99 PIR High-Level As-Is Process High Level SIPOC SuppliersInputsProcessOutputsCustomers SPONSORPIR PLAN (DRAFT/FINAL/SI GNED) PIR PLANSPONSORS PMOMOEs (BASED ON ICD/CDD) PIR REPORTCPMs COMPONENTAoAFOC RECOMMEND ATIONS USERS OT&E DATA/RESULTS DOT&E RECOMMEND ATIONS PMO REQUIREMENTSOSD COMPTROLLER IDENTIFY BEST PRACTICE ANALYZE INDEPENDENT DATA EXECUTE PIR REVIEW ASSESS (DoD CIO) REVIEW & COMMENT (COMPONENT CIO) FINALIZE PIR PLAN DRAFT PIR PLAN Y = PIR not conducted, inability to conduct trend analysis and to identify best practices

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 10  Project Charter  Problem Statement  Defined Benefits  Business Case  Data Collection Plan  Data Collected  Initial characterization of the extent of the problem  Potential Xs  Improvement Strategy  DOE  Value Stream Map  Theory of Constraints  Lean  Control Plan  Documented SOPs  Audit Plan  Reaction plan  Measurable Y  Customer Specs/VOC  Determine Defect  Measurement System Analysis / Validation  Data Display: Pareto Charts; Fish Bone / C&E; Histograms;  Improvement Analysis  Mistake Proofing  Risk management – FMEA  Cost-Benefit analysis  Feasibility analysis  Communication to Impacted Areas  Define Scope  Cross Functional Team  Data Presentation  Run Chart; Histogram; Mean/Stand. Dev.  Root Cause Analysis  XY Matrix  FMEA  Implementation  Plan  Execution  Project Documentation  Statistical evidence of improvement  Project Plan  SIPOC  Value Stream Map  Initial Process Capability, CTQs, CTPs  Validated Critical X’s  Evidence of Improvement  Pilot Results  Indicated actions  Transfer to Project Owner  “Y” Performance Target  Update of Project Charter  Final Report I accept the Define Tollgate. Signed: I accept the Measure Tollgate. Signed: I accept the Analyze Tollgate. Signed: I accept the Improve Tollgate. Signed: I accept the Control Tollgate. Signed: (Sponsor) (Process Owner) (MBB / PE Leader) DefineMeasureAnalyzeImproveControl PIR LSS Project Tollgates        

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 11 #3 Optimizing CCA & DAS Processes Eliminating duplicate compliance & documentation requirements allowing PMs to focus on program execution Team Members NameRoleAffiliationDACI Ed Wingfield Green BeltDoD CIO Driver TBD MBBOSD Driver Mr. Wennergren SponsorDASD/DCIO Approver Mr. Grimes Process OwnerASD/CIO Approver LSS Charter Problem Statement: 7 of 11 key Title 40/CCA compliance requirements duplicate the Defense Acquisition System (DAS) (i.e., DoDI ) regulatory requirements for MAIS and MDAP acquisitions. Business Case: Optimize DAS processes to meet Title 40/CCA requirements Eliminate duplicate compliance & documentation requirements Permit PM to focus on program execution not documentation Unit: Title 40/CCA Compliance documentation Defect: Duplicate compliance and documentation requirements for the 7 Title 40/CCA elements addressed in the DAS. Customer Specifications: No duplication of compliance & documentation requirements (for PMs) Start: Milestone A. Stop: Full-Rate Production Decision Review (FRPDR) Scope: Title 40/CCA compliance process for all DoD Major Automated Information Systems (MAIS) and Major Defense Acquisition Programs (MDAP) (i.e., all ACAT I programs at all milestones). Timeline PhasePlannedActualStatus Define23 Jan 09dd mm yy Measure24 Feb 09dd mm yy Analyze03 Mar 09 dd mm yy Improve10 Mar 09 dd mm yy Control20 Mar 09 dd mm yy Problem Statement under revision

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 12 What is our Approach? Team is revising Project Charter and redefining the Measurable Y (to be determined from the survey results) VoC Collection: the GB and team have selected 17 – 20 programs. A survey has been created and is targeted for PMOs/PEOs and military service HQ staff for the selected programs.

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 13 Project #3 Program Selection Criteria 1.MDAP or MAIS programs 2.Includes programs from the Air Force, Army, Navy, DISA and Joint programs 3.Must have had a milestone decision review within the last 3 years

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 14 Army CIO/G6 Presentation CIO/G6 Certification, Accreditation, and Compliance Processes LSS Improvement Initiative (Tollgate) Mr. Allan Haines CIO/G6

UNCLASSIFIED Title 40/CCA Advisory Committee 15 Sponsor Update Next Meeting: 26 May 2009 Last scheduled meeting: 5 May 2009 –Good Session –Define Tollgates completed for Projects #1 [Improving Outcome Performance Measures] and Project #2 [Improving Post Implementation Reviews (PIRs)] –Sponsor’s recognize the effort taken by CCA Improvement teams and AC members –Sponsor’s Comments: Summary by Ed Wingfield Additional Info: TBD

UNCLASSIFIED Title 40/CCA Advisory Committee 16 Wrap-Up/Action Items Next Meeting of the CCA Advisory Committee:  Wednesday, June 10, 2009  Dial – In Info: 12 lines available … (703) Toll Free DSN May Pass code = / June = TBD If you encounter any problems, the DoD Conference Operator can be reached at Agenda: TBD Items of Interest:  Leadership Review (for Tollgates) … Identifying the types of questions you would ask in a Tollgate (IMPROVE & CONTROL phases).  Next Co-Sponsor Meeting: 26 May 09 Action Item (s): TBD

Title 40/CCA Advisory Committee UNCLASSIFIED OSD, Business Transformation L6   Black Belt Training 17 Back-Up Slides

UNCLASSIFIED Title 40/CCA Advisory Committee 18 DEPMS Introductory Orientation The graphic below is the link to the DEPMS introduction … Double-click the page to open the presentation Once opened, you may select the presentation view to enlarge the presentation (found in the bottom left corner of the presentation window) for viewing.