Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division.

Slides:



Advertisements
Similar presentations
SYNCHRONOUS MACHINES.
Advertisements

Synchronous Machines (AC Generators)
Engineering Technology Division
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
1 ELECTRICAL EQUIPMENT AND SYSTEMS – OFFSHORE AND ONSHORE FACILITIES MAIN ELECTRICAL EQUIPMENTS AND SYSTEMS INSTALLED  GENERATORS: MAIN GENERATORS – 12.
Engineering Technology Division
SURATGARH SUPER THERMAL POWER STATION
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
AC Machines 6077SA NUE 046.
EXCITATION SYSTEM.
Lesson 37 AC Generators II
Lesson 33 AC Generators.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
Three-Phase ac Voltage Generation
An Introduction to Electric Power Plants Jeffrey R. Regester.
Example 1 A 9375 kVA, 13,800 kV, 60 Hz, two pole, Y-connected synchronous generator is delivering rated current at rated voltage and unity PF. Find the.
Engineering Technology Division
Power Plant Construction and QA/QC Section 3.5 & 3.6 – Hydraulic Turbines & Reciprocating Engines Engineering Technology Division.
Introduction to Power System Dr. Jing Wang Head of Institute of Power Electronic and Electric Drive
APPLIED ELECTRICITY SS3
Producing Electric Current
Department of Electrical and Computer Engineering EE20A - Electromechanical Energy Conversion DC Machine.
Power Plant Construction and QA/QC Section 7.2 – Dams, Spillways, Water Conductors and Power Houses Engineering Technology Division.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Power Plant Construction and QA/QC Section 1.3– Oil and Natural Gas Engineering Technology Division.
Power Plant Construction and QA/QC Section 1.5– Hydroelectric Energy
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Electrical Energy Transformations: Generation and Use.
Chapter 5. Synchronous Machines.
Chapter 16: Synchronous Generators
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
ACADs (08-006) Covered Keywords Turbine Auxiliaries, Mechanical Systems, Gates, Cranes and Hoists. Description Supporting Material
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Three Phase Motors Maths
Electric Generator Done by Abdullah Al-Hulaimi ID# For Dr shwahdi 10 May 2005.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To :- NITESH SONI.
A SEMINAR ON PRACTICAL TRAINING AT SURATGARH SUPER THERMAL POWER STATION.
Generating Electrical Energy Generating Electricity Diagram - Electric Power Generation and Use:
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Power Plant Construction and QA/QC Section 8.3 – Wind Energy Technology Engineering Technology Division.
Power Plant Construction and QA/QC Section 5.3 – Turbine and Engine Governors Engineering Technology Division.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
132KV GSS PIPAR CITY JODHPUR
Electrical Engineering
CONTENS 1. Production Capacity 2. Production Range
Seminar Report On KOTA SUPER THERMAL POWER STATION Submitted in partial fulfilment for the Award of degree of BACHELOR OF TECHNOLOGY In Electrical Engineering.
Submitted in partial fulfillment for the Award of degree of Bachelor of Technology In Electrical Engineering Submitted By: Submitted To : Department.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
6 Mains Electricity Alternating current. 6.1 Alternating Current Direct current (d.c.) involves the flow of electrons in one direction normally from batteries.
Industrial Training Project on Turbo Generators
Uninterruptible Power Supply Improves Reliability at The Australian Synchrotron Sean Murphy – ARW 2013 Melbourne.
SMJE 2103 Synchronous Generator. Scope of discussion 1)Construction 2)Rotation speed 3)Generated voltage 4)Equivalent circuit 5)Power and Torque 6)Testing.
Circuit Breaker Pictures
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
By : VAIBHAV KUMAR IV YEAR, VII SEM ELECTRICAL ENGINEERING.
ASSAM DON BOSCO UNIVERSITY PRESENTATION ON SUMMER TRAINING MeECL, SHILLONG PRESENTED BY SONY JOHN LAWRINIANG(DC2014BTE0097) 9/2/20161 DEPARTMENT OF ELECTRICAL.
Seminar on Practical Training By: Er. Kapil Kantia Electrical Engineering BIO-MASS ENERGY DIVISION.
Generating Electricity e the need for the National Grid as an electricity distribution system including power use and responding to changing demand.
PREPARED BY: Group-D Ramavat Nikunj ( )
From Lecture1 vi , ii vo , io Power Processor Controller Source Load
SIGENTICS HV Series S-modyn
Engineering Technology Division
Engineering Technology Division
Engineering Technology Division
Synchronous Motors and Generators
Transformer Factory (Cast Resin)
EE216 Electrical Engineering
Electrical Machines (EELE 3351)
Presentation transcript:

Power Plant Construction and QA/QC Section 7.4 – Hydroelectric Generators, Transformers and Controls Engineering Technology Division

2 Overview Section 7.4 – Hydroelectric Generators, Transformers and Controls Many Changes Electrical Code Material Improvements Equipment Updates – Oil Filled Base Load Power Generation Salient Pole Generator – Extended Field Poles Due to Slow Speed Maintain Frequency

3 Generator Ratings Section 7.4 – Hydroelectric Generators, Transformers and Controls Speed 300 to 1200 RPM Frequency60 Hz (cps) Rotor Diameter 2 to 62 ft Generator Rating 50 kVA to 900 mVA Power Factor 0.8 to 1.0 (0.95 normal) Power Capacity 50 to 1000 MW Efficiency 97.5% to 98.8% Output Voltage 18 kV Transformer Output 500 kV

4 Generator Types - Standard Section 7.4 – Hydroelectric Generators, Transformers and Controls

5 Generator Types - Umbrella Section 7.4 – Hydroelectric Generators, Transformers and Controls

6 Generator Types – Semi Umbrella Section 7.4 – Hydroelectric Generators, Transformers and Controls

7 Generator Components

8 Voltages Section 7.4 – Hydroelectric Generators, Transformers and Controls

9 Transformers Section 7.4 – Hydroelectric Generators, Transformers and Controls Hoover Dam Switchyard Chief Joseph Dam Generator Output Transformers

10 Generator Circuit Breakers Section 7.4 – Hydroelectric Generators, Transformers and Controls

11 Battery Room Section 7.4 – Hydroelectric Generators, Transformers and Controls

12 Questions? Section 7.4 – Hydroelectric Generators, Transformers and Controls