MyOcean2 First Annual Meeting – 17-18 April 2013 WP 09 MONITORING & FORECASTING CENTRE for IBI MyOcean2 First Annual Meeting – Cork /16-17 April 2013.

Slides:



Advertisements
Similar presentations
Marine Core Service MY OCEAN The GMES MyOcean Marine Service Bertil Håkansson SMHI, Core Service MyOcean Core User Requirements.
Advertisements

WMO WIGOS Implementation & (WIP) RA I Sub-Regional Workshops for WIGOS and WIS for West / North Africa Nov 2013 Dr I. Zahumensky, WIGOS-PO.
MyOcean2 First Annual Meeting – April 2013 WP 5 MONITORING & FORECASTING CENTRE for the Global Ocean (GLO MFC) MyOcean2 First Annual Meeting – Cork.
MyOcean2 First Annual Meeting – April 2013 WP 10 MONITORING & FORECASTING CENTRE for Mediterranean sea MyOcean2 First Annual Meeting – Cork /16-17.
Marine Core Service MY OCEAN WP 13 Thematic Assemby Center for SST.
Marine Core Service MY OCEAN WP 17 progress report on service level management & users’ feedback.
Marine Core Service MY OCEAN MyOcean service and product specification Dominique Obaton.
MyOcean2 First Annual Meeting – April 2013 Users support from service desk, service management Dominique Obaton, WP2 leader MyOcean2 First Annual.
MyOcean2 First Annual Meeting – April 2013 WP 07 MONITORING & FORECASTING CENTRE for BALTIC SEA MyOcean2 First Annual Meeting – Cork /16-17 April.
Marine Core Service MY OCEAN WP18.3 – Assessment and Users Requirements for “Marine Safety” Task : Assessment and requirements for “Marine Safety”
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Progress Towards a Regional Coastal Ocean Observing System for the Southeast (SEACOOS) Harvey Seim / University of North Carolina at Chapel Hill University.
1 ENISA’s contribution to the development of Network and Information Security within the Community By Andrea PIROTTI Executive Director ENISA Cyprus, 28.
Monitoring and Modelling the Spanish Coastal Waters. A new concept: The Operational PdE PORTUS System Workshop on “The status of coastal observing and.
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
MyOcean2 First Annual Meeting – April 2013 WP2.3 Service Engineering MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
Setting up the Spanish User Group of the Marine GMES/Copernicus Component Enrique Alvarez Fanjul Puertos del Estado.
SESAR Single European Sky Air traffic management Research
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Proposal for Enhancement of the CAUL Statistics
Marine Core Service MY OCEAN WP 15 Thematic & Assemby Center for In Situ.
MERSEA Remote – Sensing Ocean Portal Brest Nov 2005 WP2.6 - DIP2 Project Status < Observing Systems < Remote Sensing.
GMES Marine Service MY OCEAN WP 17 Service Level Management & User Feedback – GMES MyOcean First User Workshop Bertil Håkansson, SMHI.
Towards Sustainability Partnership for a European Centre for Ocean Monitoring and Forecasting (ECOMF) 16 April 2013, MyOcean Annual Review, Cork, Ireland.
ENEON first workshop Observing Europe: Networking the Earth Observation Networks in Europe September, Paris Copernicus cross-cutting in situ component.
SMHI in the Arctic Lars Axell Oceanographic Research Unit Swedish Meteorological and Hydrological Institute.
MyOcean2 First Annual Meeting – April 2013 Answer to users’ needs in service definition and evolution Dominique Obaton, Vincent Claverie WP2 MyOcean2.
Marine Core Service MY OCEAN WP 10 Monitoring & Forecasting Center for BS MFC.
GMES Marine Service MY OCEAN Cross Cutting Cal/Val Activities & Product Quality Working Group Scientific Assessment of External Products in MyOcean Second.
GENIUS kick-off - November 2013 GENIUS kick-off meeting WP400 – Tools for data exploitation X. Luri.
MyOcean2 First Annual Meeting – April 2013 MONITORING & FORECASTING CENTRES: an overview Marina Tonani with the contribution of all the MFC’s leaders.
Marine Core Service MY OCEAN Potential contribution of Observatories to GMES Marine Core Service, MyOcean Fabrice HERNANDEZ IRD/Mercator Ocean, France.
WP 09 Monitoring & Forecasting Thematic & Assemby Center for IBI MyOcean2 V4.1 Acceptance & V5 Design Workshops – June 2014 MyOcean2 V4.1 Acceptance &
Data Buoy Cooperation Panel Hester Viola
Marine Core Service MY OCEAN WP 16 Service Management and Service Desk Simon J. Keogh WP16 Leader.
MyOcean2 Annual Operation Review # 1 Cork, April 2013 MyOcean 2 Project Progress J. Dorandeu – MyOcean2 Project Manager
Marine Core Service MY OCEAN WP 8 Monitoring & Forecasting Centre for IBI.
MyOcean2 First Annual Meeting – April 2013 WP 15 THEMATIC & ASSEMBLY CENTRE for In Situ MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
Marine Core Service MY OCEAN WP 09 Monitoring & Forecasting Centre for Mediterranean sea Marina Tonani-WP9 Leader.
WebEx Cloud Connected Audio Enterprise
Marine Core Service MY OCEAN WP 4 Monitoring & Forecasting Center for Global Ocean.
Marine Core Service MY OCEAN WP 14 Thematic Assemby Center Sea Ice and Wind.
Argo workshop in Ghana, December Argo data status & data access.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and liaison with pan-European initiatives Athens,
EuroGOOS Annual Meeting 2009/10/ /10/08 2b: Contribution of open ocean observatories to GEO Data Core – Biodiversity, Ecosystems and Health Richard.
Marine Core Service MY OCEAN MyOcean SAM, April 2011, Rome, Italy WP 6 Monitoring & Forecasting Center for Baltic Nicolai Kliem Presented by Jun.
Norwegian Meteorological Institute met.no ECOOP Task T2.5: River Data Progress in Year 1 Bruce Hackett, met.no Presented at ECOOP 1st Annual Meeting, Athens,
Advancing MSI’s Quality Assurance approach under SIFPO Dr Pritha Biswas, MD Senior Advisor MSI SIFPO I EOP Meeting 18 September 2015.
MyOcean2 WP4.4 ACTIVITIES UPDATE MyO2 ANNUAL REVIEW,CORK, 16 APRIL 2013.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
GODAE IGST X Exeter, Nov Mercator Status 1. The system 2. Some users 3. The consortium 4. Mersea & plans
MyOcean2 First Annual Meeting – April 2013 WP 11 MONITORING & FORECASTING CENTRE for the BLACK SEA MyOcean2 First Annual Meeting – Cork /16-17 April.
Preliminary results of ESEOO project ESEOO Group.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Welcome to the PRECIS training workshop
CMEMS Mediterranean MFC. Update on specific development for CMEMS Med-MFC V2 Analysis and Forecast Product 1.Data Assimilation: Grid point EOFs ( * )
CERN - IT Department CH-1211 Genève 23 Switzerland t A Quick Overview of ITIL John Shade CERN WLCG Collaboration Workshop April 2008.
Marine Core Service MY OCEAN For Marie: A compilation of some “nice-coloured” slides on IBI Validation I Workshop Técnico de Usuarios Españoles del Servicio.
MyOcean2 First Annual Meeting – April 2013 WP 06 MONITORING & FORECASTING CENTRE for ARCTIC Laurent Bertino, NERSC MyOcean2 First Annual Meeting.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
MY OCEAN MyOcean Change Management & Baseline Control WP2 MyOcean PRR, Roma, 2011 April 29 th.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
© GEO Secretariat Demonstrating GEO’s Added Value -- Challenges and Opportunities Barbara J. Ryan Director, GEO Secretariat Work Plan Symposium Geneva,
4th Call Information Christopher Parker, Joint Secretariat 1st June 2016, Cork, Ireland.
A Quick Overview of ITIL
P. Lorente , M. G. Sotillo , A. Amo-Baladrón, R. Aznar, A. Pascual y E
West Africa Regional Work Plan Example
Statistics & DWH Department Statistics & Data Warehouse Department
Presentation transcript:

MyOcean2 First Annual Meeting – April 2013 WP 09 MONITORING & FORECASTING CENTRE for IBI MyOcean2 First Annual Meeting – Cork /16-17 April 2013

Work Package Main Objectives MyOcean2 First Annual Meeting – April 2013  To ensure and improve the reliable and accurate provision of a regional ocean forecast service on the IBI region  To ensure management of service and products, update on new IBI products (i.e. Re-analysis)  To provide a back-up capability:  A nominal system IBI-NOM operated by Puertos del Estado  A Back-up system IBI-BUP, operated by Mercator.  The system will include modeling improvements and advances derived from R&D when demonstrated.  A robust Tier 1 R&D activity is planned in order to address specific demands of improvement in the operational system  To contribute to enhance IBI users community 1/14

Partnership Interface with Exec, Board, PMO, external representation, Cross-cutting Activ. Coordination Daily operations & Service Interface with ServiceDesk, CIS, TACs & MFCs, Crosscutting WPs… Operations & Service Oriented short-term R&D to improve IBI system & Service Develop IBI-Vn+1, n+2… Product Quality (WP17) R&D MyOcean2 First Annual Meeting – April partners: PdE, CLS, CNRS & Mercator 2/14

System & Production Evolution MyOcean2 First Annual Meeting – April 2013 n Objectives for V3 were n Make evolve IBI numerical solution n Upgrade IBI operational suites in Production Lines n Enhance Back-Up Services (exchange between PCs) n Improve CAL/VAL capabilities 3/14

System & Production Evolution MyOcean2 First Annual Meeting – April 2013 n Main achievements for V3 are n IBI-V3 solution includes improved river discharge data n A more robust & efficient operational suite: Some sources of IBI incidents minimized with incorporation of some extra QC procedures n Noticeable upgrade of IBI-MFC Validation capabilities: Launch of NARVAL (north Atlantic Regional VALidation) Tool 4/14

System & Production Evolution MyOcean2 First Annual Meeting – April 2013 n Main difficulties encountered n Changes in computational environment in both Production lines: Significant changes in Production hardware environments both in NOM (PdE-CESGA for V3) & BUP (MO-MF for V4)  Open issue: Risk for operational V3 & V4 services ? 5/14

System & Production Evolution MyOcean2 First Annual Meeting – April 2013 n Main difficulties encountered: Back up issue CIS DU (PdE) PU (PdE) DU (CLS) PU (Mercator) USERS IBI-NOMIBI-BUP If IBI-NOM pb 1st senario 6/14

System & Production Evolution MyOcean2 First Annual Meeting – April 2013 n Results from Test of internal BUP production services: Slightly difference in final products format (i.e. netcdf file format) has an unexpected impact on the download of mixed IBI (NOM & BUP production origin) data through subsetter service (PdE MisGW)... OK FOR HOURLY PRODUCTS NOK FOR DAILY PRODUCTS n Main difficulties encountered 7/14

Improvements, results, illustrations MyOcean2 First Annual Meeting – April 2013 River runoffs of Adour (on the left) and Garonne (on the right). Red line: monthly climatology runoffs used in IBI-V1, blue line daily runoffs used in IBI-V2 and green line daily runoffs which take into account tributaries and used in IBI-V3. n IBI solution upgrades: IBI-V3 will have a more realistic inputs for river discharge runoff data used. (More details on QuID) IBI River inputs locations. In green: daily runoffs hindcasts from E-HYPE model (SMHI) In red: daily runoffs obs data from PREVIMER (FCs from E-HYPE only ) 8/14

IBI CAL/VAL improvements n IBI Improved CalVal capabilities n Noticeable upgrade of the IBI-MFC Validation capabilities: Launch of NARVAL Tool (On-line & Delayed Mode) MyOcean2 V3 Acceptance & V4 Product Design Workshops – Madrid 28,29th January 2013 Validation of daily IBI FC cycle. Statistics covering longer periods (monthly, seasonal and annual reviews)  MyO Quarterly Validation Reports 9/14

Spanish Marine GMES User group END USERS Oceanographic institutions MyOcean Conceptual organization Kick-off Meeting Spanish Marine GMES UG (Madrid, Oct 18 th 2012) Kick-off Meeting Iberian MyO IBI-MFC Users (Madrid, Nov 13 th 2012) To enhance the downstream service 10/14

The Spanish IBI User Group: Institutions…  13 Groups articulates (by now) the Spanish Users Network:  11 Intermediate/end user.  2 Institutions related to MyO MCS.  Number of people implicated:  25 technical contacts (already members of the mailing list)  23 attendees to the Spanish IBI User Group Kick-off Meeting 11/14

First period summary and next steps MyOcean2 First Annual Meeting – April 2013  Service and user outreach  Enhance user feedback (i.e. bug detection in current IBI products, new taylored user-oriented products) 12/14  Objectives for V3 accomplished  Amelioration axis:  Operational aspects:  Reduction of execution times associated to model and computer changes  Increase Robustness, preventing new risks identified before V4  Complete the full B.U. solution  R&D aspects  Improvement of engineering procedures to validate and include R&D tier 1 developments  Complete IBI R&D plan as established in PMP

First period summary and next steps MyOcean2 First Annual Meeting – April 2013 Evolutions scheduled for V4 Model improvementDelivery Improvement of operational suite: decrease CPU time, increase robustness V3 and V4 River input improvementV3 Solving the BU issueDuring V3 (RFC when OK) Possible new Heat flux formulation V4 Nudging for spin-upV4 Change of model version from 2.3 to 3.4 V4 Wave forcings (SBC: wave roughness &TKE; Stokes- Coriolis term) V4 Data assimilationECOMF… V4 R&D works mainly focus on improve IBI NEMO solution New IBI V4 Products: IBI RE-ANALYSIS  PHY  BGC Main DEV: PdE Main DEV: MO 13/14

First period summary and next steps MyOcean2 First Annual Meeting – April 2013 THANK YOU! 14/14