A380 Manufacturing & Logistics. Airbus Manufacturing Plants and Subsidiaries 15 Airbus Manufacturing sites in 4 countries acting as one industrial system.

Slides:



Advertisements
Similar presentations
Zonal & Station Identification Systems
Advertisements

Parts of an Aircraft Parts of an Aircraft Gateway To Technology®
4 2 . Parts of the Airplane.
9.2 Maneuverability Important when: – Station keeping – UNREP – Docking – “Dodging incoming...” Predicted by: – Equations of Motion – Tank Models Verified.
Aircraft Control Surfaces and Components. Aircraft Components and Control Aircraft range from simple home-built machines to complex fighter jets All aircraft.
Strata Manufacturing PJSC
The Fuselage and Empennage
Airbus A380 passenger plane. Introduction The Airbus A380, developed by a group of engineers led by Jean Roeder, is the largest passenger plane in the.
6th grade Springton Lake
ME 480 Introduction To Aerospace: Chapter 2 Prof. Doug Cairns.
AVIATION HISTORY Lecture 10 : Airliners. OBJECTIVES  By end of this section, students will be able to explain:  About Boeing & Airbus aircraft,  Why.
The C-141 StarLifter Some assembly required. This is some of the tooling used to manufacture the C-141. These were used to shape the sides of the fuselage.
Dr. Iris Berdrow Bentley College, Harvard Summer School.
7th and 8th January 2005 Airbus practices for maintainability and human simulation - EDKMT1 - Ref. PR Issue 1 Airbus practices for maintainability.
Group 13 Heavy Lift Cargo Plane Stephen McNulty Richard-Marc Hernandez Jessica Pisano Yoosuk Kee Chi Yan Project Advisor: Siva Thangam.
Parts of an Aircraft. 8/7/2015Aerodynamics Day 12.
Subject: Science Topic: Flight Technology Grades: Teacher Notes.
Airbus A320 Family Configurations
Utilizing your notes and past knowledge answer the following questions: 1) What part of the aircraft is located on the outer portion of the trailing edge.
Parts of an Aircraft Parts of an Aircraft Gateway To Technology®
Lesson 2-2a Principles of Flight
BASIC AERONAUTICS AND AERODYNAMICS AIRCRAFT IN MOTION FLIGHT NAVIGATION THE AIRPORT AIR CARRIERS GENERAL AVIATION JEOPARDY.
The Port of Baltimore Glossary Activity Produced by.
Lecture 3: Basic Aircraft
TEAM DO NOW: DAY # Lesson # September 8, List the three primary flight control surfaces. 2. What is the purpose of the trim tab? 3. Explain the.
Presented by: Michael Weidner Lindsay Brew Robert Zander.
Southampton 3 P Bradshaw EDXCW. © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Pop-Up Spoilers Description  High lift: Slats,
Vidin harbour. Vidin harbour is the first major port on the Danube in the Bulgarian section of the river, and the first Danubian port. The port has a.
Investment Project Construction of Multi-purpose Marine Complex of Terminals (MMCT) “Galitsyno”
PROJECT CARGO TRANSPORTATION CHALLENGES IN MEXICO In Mexico the major CHALLENGE for Transportation of Oversized and Heavy Equipment is our Infrastructure.
IAQG General Assembly 29 April 2005 Amsterdam. Version 9 2 H. Luijt\ ASD-EASE Association according to Belgian law 52 member in 8 European countries.
 Communication  Observatory  Flyby  Lander  Penetrator.
Joint Strike Fighter F-35 An International Collaboration Jon Waldrop
Airplanes By : Hebron Yam,Justin Minucci. How do airplane work? Problem???
Aircraft Familiarization
By Bala Dhareneni.  The fuselage, or body of the airplane, is a long hollow tube which holds all the pieces of an airplane together. The fuselage is.
The Parts Of Airplane More information General Aviation planes vary in size and shape but the basic parts remain the same.
Cargo securing to prevent cargo damages on road, sea, rail and air CARING is partially financed by the Leonardo da Vinci programme of the European Union.
AIRBUS A380 Has Airbus set the benchmark for future aviation? Will other manufacturers follow this trend?
Introduction to Aerospace – Historical Perspective Dr. Doug Cairns.
2005 Europe/US International Aviation Safety Conference, Cologne 7-9 June The Europe-US International Aviation Safety Conference 2005 ‘ Aviation Safety.
Cargas em Operações no Solo Cargas em Aviões ITA – Instituto Tecnológico de Aeronáutica.
AIRFRAME Objective Know the design and construction features of the airframe and airframe components.
Aero Vodochody Aerospace Leader
비행체 구조설계 Aircraft Structural Design
Large Aircraft Design Programme for AVIC 2009/2010 Group Design Project Dr. Shijun Guo Academic Program Director 9 th April 2009 Department of Aerospace.
UBAX14 Microsoft Convention 2013 ‘If you’re trying to get to there…..’
Control surfaces sgt. Vojtěch Pták 23-4PIL ; Brno.
Utilizing your notes and past knowledge answer the following questions: 1) What part of the aircraft is located on the outer portion of the trailing edge.
1 Aerospace Developments in Korea Aerospace Division Dr. S.Y.Yoo / Director Korea Institute of Aerospace Technology
Basic Aircraft Structure
AIRCRAFT MAINTENANCE TOWING OF AIRCRAFT.
Break-in-bulk, RORO or ro-ro, Project cargo
Aerospace System Prototyping and Validation- Lecture 2
PARTS OF AN AIRCRAFT.
Global Services Dreamlifter Logistics System Kurt R. Kraft VP - Modification Engineering, Boeing Global Services September 13, 2017.
4 2 . Parts of the Airplane.
Warm-Up – 9/5 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What are the four forces of flight? Describes what.
Airplane Parts and Theory of Flight
AIRBUS A380 Has Airbus set the benchmark for future aviation? Will other manufacturers follow this trend?
Warm-Up – 8/23 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What part of the aircraft is located on the outer.
SAE Aero East 2017 MAE 435 Mid-Term Progress Presentation
NİŞANTAŞI ÜNİVERSİTESİ
Warm-Up – 1/18 – 10 minutes Utilizing your notes and past knowledge answer the following questions: What are the two most popular types of fuselage structures?
stages control devices thrust arrangement
Teachers Resource Pack
What is an Airplane? Aircraft Airplane More general term
Comet Quad Tailsitter Inspiration:
Unit 2 Unmanned Aircraft
Vocabulary in your own words
Presentation transcript:

A380 Manufacturing & Logistics

Airbus Manufacturing Plants and Subsidiaries 15 Airbus Manufacturing sites in 4 countries acting as one industrial system St Nazaire Toulouse Broughton Nantes Filton Getafe Méaulte Illescas Puerto Real Laupheim Stade Hamburg Bremen Varel Nordenham

Broughton (UK) Getafe / Puerto Real (Spain) Hamburg (Germany) Hamburg (Germany) Stade (Germany) St. Nazaire / Nantes (France) St. Nazaire / Meaulte (France) Toulouse (France) Best use of Airbus centers of competence Bremen (Germany) Puerto Real (Spain) Hamburg (Germany) A380 Airframe Production Major Component Assemblies

Bill Jay/ASCO Belairbus BAe Aircabin Alenia Aries Eurocopter EADS Aug. FACC Finavitec Fokker Gamesa GKN HDH Ralee RUAG Saab Sabca Sacesa Socata Sogerma Sonaca CTRM Senior Aerospace AS & T Jamco FHI Labinal Latécoère Lhotellier Latelec MASA Mecachrom More than 40% of Airframe Workpackages are outsourced to 33 major Industrial Partners. Bill Jay/ASCO Belairbus BAe A380 Industrial Partners

KAI (outer bottom panel) FACC (flap/fairings) Alenia Jamco (CFRP crossbeams) Eurocopter (all doors) Finavitec (spoilers) HdH (wing tip) Hurel Hispano Latecoere (lower shell) Sonaca (upper shell) Belairbus (slats) Fokker (J nose) Glare panels/ Nippi (HTP Tip) FHI (leading, trailing edge & tip) Saab (mid & outer front spar) GKN (shroud box, access panels) A380 Industrial Partners

S 11/12 MCA in St. Nazaire Components from Meaulte and Industrial Partners. MCA in St. Nazaire Delivery to FAL. MCA in Hamburg Fuselage Shells from Nordenham. Parts, Components from Bremen, Varel, and Industrial Partners. S 11/12 S 13 Fwd Fuselage MCA S 13 A380 Aircraft Build Process Forward Fuselage MCA

MCA in St. Nazaire Components from Alenia, Nantes, Hamburg, and Puerto Real. A380 Aircraft Build Process + + Centre Fuselage MCA A380 Aircraft Build Process Center Fuselage MCA

Aft Fuselage MCA + MCA in Hamburg Shells from Nordenham. Components, Parts from Getafe, Stade, Varel, Bremen, and Industrial Partners. A380 Aircraft Build Process Aft Fuselage MCA

Top cover assembly Bottom cover assembly A380 Aircraft Build Process Wing Assembly MCA in Broughton Components, Parts from Filton, Bremen, and Industrial Partners.

A380 Components delivered to FAL

Station 37 HTP Equipping Station 41/40 Structural Assembly Station 45 Wing Equipping Station 31/30 Structural Completion / Equipment Installation / System-Testing Station 18 Outside Tests Station 15 Production Flights TLS  HAM A380 Aircraft Build Process The Final Assembly Line - Toulouse

Special Transport System  Fuselage Sections, Wing, Horizontal Tailplaine, Belly Fairing Airbus Special Transport, Beluga  Forward and Aft tailcone, Vertical Tailplane, Cockpit Unit, Nose Fuselage Components, Landing gear bays Conventional Road – Sea transport  Flaps, Pylons, etc., Aerostructure Components from Industrial Partners, e.g. Slats, Spoilers, Fuselage Shells, Doors A380 Transport Means

Pauillac St Nazaire Langon Toulouse Hamburg Broughton Mostyn Cadiz SEA RIVER ROAD A380 Transport : a challenge

The concept  Multimodal transport (Sea, River, Road)  Roll-on / Roll-off handling principe  Specific transport conditions –No effort transmitted to the A380 components –No contact between the A380 components –Accelerations control  Specific means & equipment under responsibility of reliable and performant partners  Taylored infrastructure –Harbour terminals (Hambourg, Broughton, Mostyn, St Nazaire, Cadiz, Pauillac and Langon) –Road Parking areas along the « Grand Itinéraire » –City by-passes  Back-up systems A380 Transport

TCUs (Transport Cargo Units) 6 TCUs : 3 fuselage sections A380 Transport

TCUs (Transport Cargo Units) 6 TCUs : 2 Wings + 1 HTP A380 Transport

Marine Transport – Twin screw, two engines – Bow thrusters – Stabilizing systems (fins)  Ro-Ro Vessel –Basis from a « Car carrier standard » –Length 154m, Width 24 m –Max speed 21 knots –Operational speed 16 knots Our partner : FRET CETAM A380 Transport

River DEE transport  HOLYHEAD TOWING Operator  35 km between BROUGTHON and MOSTYN  Barge able to transport 1 wing  2 voyages to transport one aircraft  Maximum rate 1 aircraft a week  Navigation depending on tidal cycle  Empty jigs transported during barge return voyage A380 Transport

PAUILLAC A380 Transport River GARONNE transport  SOCATRA Operator  95 km between PAUILLAC and LANGON  2 Barges able to transport 2 fuselage components or 1 wing  4 trips to transport one aircraft  Pont de Pierre (Bordeaux) crossing depending on the tidal cycle  Empty jigs transported during barge return voyage

Specific port terminals for loading, unloading operations in place Pauillac: Floating Transfer Station St Nazaire: main pontoon Cadiz: lifting gantry & ramp A380 Transport – Harbours, Terminals Hamburg Quay & Ramp Installation

Mostyn Terminal 1Langon wet lock Broughton LOF Facility A380 Transport – Harbours, Terminals

Between Langon and Toulouse by means of special tractors & trailers  Operator Capelle  3 Nights drive operations  1 Departing Base at Langon  four parking areas, along the itinerary 1 st sections transport to FAL took place in April A380 Road Transport Multisteering axle line trailer Tractor Model with 600 HP engine

Véhicule démontage signalisation Véhicule atelier Chef d’Elément de Transport : CET Véhicule remontage signalisation + Véhicules DDE + Véhicules gendarmerie Tractors & trailers owner is the operator CAPELLE A380 Transport – Road Operations

Thank you