Sites Enterprise Product Data Management David Kemp

Slides:



Advertisements
Similar presentations
Moving Inventory easily between plants
Advertisements

Infor XA R6 Browser to Infor ERP XA Power-Link R7.8/R9
How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
“What’s new from R6 to R7, to R9 ……”
Order Based Production Management
Intracompany Stock Transfer Scenario Overview
1 of 20 Lot Attributes & Pallet Numbers / DA w1 Last updated: Lot Attributes & Pallet Numbers.
PowerLink Navigation The Power Of the ‘Right Click’ in PowerLink Jim Simunek
The Production Process
Chapter 5: The Production Process
Process Management and Control and Physical Inventory SAP Implementation
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Client/Server Databases and the Oracle 10g Relational Database
Recording / Financing Fixed Asset Acquisition Human Resources Purchasing Revenue Traditional files approach: separate systems (Legacy Systems) Expenditure.
The Production Process
Inventory and Warehouse Management Process
High Lights of SAP Business One for Manufacturing.
SAP R/3 Materials Management Module
Module 10 Setup for Production.
David Warne Independent Manufacturing Consultant.
Configuring the MM Structures. Slide 2 Review of the Procurement Process Goods Receipt Pay Invoice Purchase Requisition Purchase Order Invoice Receipt.
Faster and Easier Record Entry with Custom Templates & Card Files Jim Simunek, Senior Consultant
MAPICS Enterprise Solution Presented by John Grindley CISTECH -Senior Consultant
Enables businesses achieve greater efficiency by sharing data and processes Shared application data across legal entities— party, location, products…
Denise Luther Senior IT Consultant Practical Technology Enablement with Enterprise Integrator.
Quality Management System
19-1 P ROCESS C OST S YSTEMS CHAPTER F Used for production of small, identical, low-cost items. F Mass produced in automated continuous production.
Enhancements From R6, R7.x to R9 Enterprise Product Data Management (EPDM) David Kemp
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
6.0 Code Release New ICOTS Features. Features Added – Alert to warn/confirm that a user is about to withdraw a case or compact activities – Back Functionality.
1 Managing MO’s with OBPM How to use Browser/PowerLink technology to revolutionize Manufacturing Orders Jim Simunek, CPIM
6.1 © 2010 by Prentice Hall 6 Chapter Foundations of Business Intelligence: Databases and Information Management.
Chapter 8 Configuring and Managing Shared Folder Security.
Manufacturing Plant maintenance Materials management Quality management.
Chapter 7-1 Chapter 7 Accounting Information Systems The Conversion Cycle Dr. Hisham Madi.
The world leader in serving science Overview of Thermo 21 CFR Part 11 tools Overview of software used by multiple business units within the Spectroscopy.
At the end of each day the evening manager at each store enters a code into the cash register, after which the cash register connects to the central computer.
Oracle Applications User Group Discrete MFG SIG – Cost Group April 27 th 2010 Release 11i & 12: Major Tables & Relationships for Costing, Session I.
CSCI 6962: Server-side Design and Programming Shopping Carts and Databases.
Process Cost Accounting General Procedures
PRODUCTION. Producing Products Production the multistep process of making parts and assembling them into products.
Added Value manufacturing  Neil Towers. Market winners and qualifiers 
AutoSimply Process Flow. Legend System Process Manual Process System Document Manual Document Flow Connector to another slide Terminator Predefined Process.
Materials Management (MM) Organizational Structure EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2013.
 Andersen Consulting IM01 - Organizational Structure & Master Data in IM November, 2000.
Activity-Based Costing
At the end of each day the evening manager at each store enters a code into the cash register, after which the cash register connects to the central computer.
Chapter 27 Cost Management for Just-in-Time Environments
Appendix – Integration with Assets, Locations, and Organizations
Using Item Attributes in a Make-to-Order Environment
Quality control with beas
MRP: Material Resource Planning
Client/Server Databases and the Oracle 10g Relational Database
Intercompany Concepts
Intracompany Stock Transfer Scenario Overview
Intracompany Stock Transfer Scenario Overview
The Production Process
Display Item Information
Sales Order Process.
Intracompany Stock Transfer Scenario Overview
[Update PPE for Worker] Worker Register
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
SAP QM Prepared by Lavanya.M.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Sites Enterprise Product Data Management David Kemp

What is a Site? A high level segregation object in MAPICS Enables grouping of Item Revisions that are not available to all departments or locations Enables Item Revisions to have different characteristics for different departments or locations Can be physical locations or virtual

Sites – Two Main Types Production Sites – Different Physical Location (USA & UK) – Research & Development (works in progress) – Manufacturing Engineering (adding the routing) – Production Floor (making the items) Simulation Sites – “What if” simulation – More in a few minutes

Sites Separate Engineering Records Central Engineering serving multiple plants Engineering for a specific plant or warehouse Separate design engineering from manufacturing

Warehouses are assigned to a Site

Warehouses belong to a Site

Facilities belong to a Site

Costing Labor Rates are Site Specific

Manufacturing Rates are Site Specific

Pur Overhead Rates are based on Site

Sites - Items & Item Revisions PDM – No Sites – Items are unique EPDM – Sites (One or Multiple) – Same Item can be in multiple Sites – Same Item can have multiple Revisions Site ItemAll 3 required to define unique Item Revision Revision

Items & Item Revisions

Unique Item Revisions – Site Dependent Requires a unique combination of Site, Item, & Revision

Site Influence on Item Revision Unique Item Revision requires a defined Site Cost of the Item Revision is based on Site rates (purchase overhead, labor, machine, etc.) Item Revisions are stored in Warehouses defined for the Site Item Revisions can be copied from one Production Site to another Production Site (one at a time or in mass)

Site Controlled Attributes Some attributes of Item Revisions are controlled at the Site level – a few at the Enterprise level If control exists at the Enterprise level, all revisions of an item across all Sites will have the same value for the attribute If control exists at the Site level, all revisions for that Site will have the same value for the attribute Prevents accidental change of the attribute when a new Item Revision is created

Controlled Attribute Controlled at the Enterprise Level (Common across all Sites) Stocking Unit of Measure (UNMSR) Inventory Code (INVFG)

Controlled Attribute Controlled at the Site Level Batch/Lot Control (BLCF) Discrete Allocations (ALLOC) Inspect on Receipt (INTYP) Item Type (ITTYP) QC (Shelf Life) (QCTYP) Shelf Life Days (QCDAY)

New Object in R9: Item Site File

Item Site File Only the current Item Revision (see 3/29/11 Tues Ed) Item Revision used by PM, OBPM, CSM, IM, etc.

Simulation Sites Copied from a Production Site Typically a temporary Site used to run “what- if” scenarios and then deleted Used to determine cost changes based on multiple override values Simulate cost based on increases for new year Use to store cost for previous year

Simulation Site - Limitations Cannot copy Item Revisions from Simulation Site to another Site Cannot release Manufacturing Orders Cannot release Purchase Orders

Cost Simulation object Effects only the selected Site Multiple runs Unrestricted choice of parameters Results saved Results visible via PowerLink

Cost Simulation object

Cost Simulation Overrides Any of the following can be overridden for the cost simulation – Labor costing table – Manufacturing overhead – Facility class – Facility – Item class – Item

Labor & Manufacturing Overrides

Facility Rate Overrides

Simulation results

Questions ?