Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting.

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
NSAC Long Range Plan Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
Electron-Ion Collider and the NSAC Long Range Plan Robert Tribble December 7, 2007 Texas A&M University.
The Long Range Plan for Nuclear Physics The LRP working group “After the big meeting” Richard Seto University of CA, Riverside RHIC-AGS User’s Group –
Output from this Series of Workshops: A science vision for the RHIC future 1.Provide a science case for the future RHIC program that makes clear its importance.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
BENE Meeting April 28, 2006 A. Bross US Contribution to the IDS Aka WDS BENE IDS/FP7 at RAL April 28, 2006 A. Bross.
Long Range Plan (LRP) & EDM Nuclear Physics LRP is prepared every 5- 6 years Provides guidance to funding agencies w.r.t. scientific and funding priorities.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
U.S. Department of Energy Office of Science U.S. Department of Energy Office of Science High Energy Physics Advisory Panel Meeting FY 2009 Budget Request.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Office of Science U.S. Department of Energy RHIC Users Meeting, June 8, 2006 The RHIC Spin Program W. Bradford Tippens Program Manager for Medium Energy.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Curtis A. Meyer Nuclear Science in the United States The Core of Matter The Fuel of Stars.
Status and General Considerations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
Rolf Ent Jefferson Lab ? + = 2007 Long-Range Plan 2014 EIC White Paper
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
General Discussion some general remarks some questions.
A feasibility study for measurements using electroweak probes at the proposed Electron-Ion Collider: Investigating nucleon structure and the fundamental.
Director’s Comments on the BNL Strategic Plan RHIC/AGS Users Meeting May 29, 2008 Steve Vigdor, filling in for Sam Aronson.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Workshop on Women in Science and Engineering Latifa Elouadrhiri Jefferson Lab November 16, 2009.
EIC — Bring the Glue to Light. Gluons dominate QCD QCD is the fundamental theory that describes structure and interactions in nuclear matter. Without.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
The RIA Users Organization (RIAUO) Witold Nazarewicz (Tennessee) EURISOL Week, CERN, November 2006 History The Mission Organization Activities Perspectives.
Dual Target Design for CLAS12 Omair Alam and Gerard Gilfoyle Department of Physics, University of Richmond Introduction One of the fundamental goals of.
R.G. Milner2nd EIC Workshop Summary and Outlook science case machine design EIC realization.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
Jefferson Lab’s Enabling Technologies: A Call for Strategic Planning W. OREN JLAB Engineering Division 9 February 2012.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
June 1-5, 2009 June 8-10, 2009 Nuclear Physics at NSF NP Experiment –Structure –Heavy Ions –Symmetries –Hadrons and QCD NP Theory Particle and Nuclear.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
GlueX Collaboration Meeting
Jefferson Lab Overview
Welcome Stuart Henderson May 22, 2017.
The RIA Users Organization (RIAUO)
for the EURISOL Steering Committee
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
Charge for APS Neutrino Study
Introduction to Jefferson Lab
Introduction and Workshop Charge
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
SOLID Collaboration Meeting
Update on the JLEIC pCDR
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Perspectives from DOE NP
Presentation transcript:

Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June JLAB Users Group Meeting

The Horizon at Kitty Hawk, NC The location of our Long Range Plan Meeting Photo by Matt Shepherd The Wright brothers first airplane flight

3 Charge to NSAC to Develop a New Long Range Plan

No-Spoiler Alert I am not going to present the recommendation(s). I am not going to quote news articles about what the recommendations might be. I will be happy to answer your questions except about the recommendations

Why This is Important The Agencies Listen All major projects in Nuclear Physics since 1979 have been recommendations of a Long Range Plan It gives you a sense of what your colleagues think is important

Anticipated LRP Schedule Charge delivered at 24 April NSAC Meeting LRP Working Group formed in early June ~ 60 members - NuPECC and ANPhA observers. Community organization last summer DNP town meetings in the July/September Joint APS-DNP-JPS Meeting Oct 7-11, 2014 – Wednesday afternoon discussion. Working Group organizational meeting Nov 16, 2014 in Rockville, MD White papers by end of January to have greatest impact Cost review of EIC – Report at April 3 NSAC meeting Most of text of report assembled by April 10. Resolution meeting of Long Range Plan working group April 16-20, Second draft of full report by May 18 Draft report reviewed by external wise women and men. LRP final report due October 2015 – NSAC Meeting and Public Presentation

The 2015 NSAC Long Range Plan

History 1983: Increase operating and equipment funds ♯ Build RHIC ♯ Following instruction to assume CEBAF led to a mixed message which had to be addressed later. 1989: Complete CEBAF, Build RHIC, Join Kaon 1996: Pursuit of opportunities from recent investments Build RHIC Radioactive Beams – in-flight and ISOL LISS and AGS hadron beams 2002: Exploit opportunities from recent investments, facility ops, universities and theory Build RIA Underground Lab CEBAF upgrade

FY07 LRP Recommendations (after a period of little major construction) Complete JLAB 12 GeV Build FRIB Targeted program in fundamental symmetries Upgrade RHIC Resources for R&D for EIC Initiatives in theory, gamma-ray tracking and Accelerator R&D

Web locations You can find more information on the NSAC web site: This will give you the charge, membership of the Long Range Plan working group and a link to a site at ANL with further information such as the schedule for upcoming activities. Argonne Site: This describes what we are doing and contains a link to all the input documents we have received from the community.

Recommendations from the Cold QCD Town Meeting RECOMMENDATION I: With highest priority, we recommend both completion of construction and full operation of the 12 GeV CEBAF at the Thomas Jefferson National Accelerator Facility, along with targeted instrumentation investments, such as the SoLID and MOLLER projects. RECOMMENDATION II: A high luminosity, high-energy polarized Electron Ion Collider (EIC) is the highest priority of the U.S. Nuclear Physics QCD community for new construction after FRIB. RECOMMENDATION III: We recommend strong support for other existing facilities, such as the polarized proton facility at RHIC, university-based laboratories, and the scientists involved in these efforts, in order to guarantee the effective utilization of such resources for continued scientific leadership and discovery, and for educating the next generation of nuclear scientists in the USA.

RECOMMENDATION IV: We recommend that support for the hadron theory program be increased, in a balanced manner and in proportion to new and continuing investment in experiment. This will both guarantee that all aims of the existing program can most rapidly be achieved and secure a promising future for the next generation of nuclear scientists and the nation. Given the breadth of the hadron physics enterprise, this program must necessarily be multifaceted and capable of reacting quickly to the new opportunities that innovative experiment and creative theory will reveal. The QCD and Hadron Physics Town Meeting also voted to endorse the following conclusions from the Town Meeting on Education and Innovation and the Town Meeting on High Performance Computing. Recommendations from the Cold QCD Town Meeting Continued

EIC Cost review Since the cost of an EIC was a significant issue for the plan, there was a cost review chaired by Ed Temple. Excerpt from Summary: Of the uncertainties that remain, the subcommittee considers the dominant ones to be technical. Given these technical uncertainties, based on the plans presented by both teams, the subcommittee concluded that an EIC could be built for about $1.5B in FY15$. We note that critical information on the performance of the eRHIC energy recovery linac (ERL) and the coherent electron cooling (CeC) approaches is planned to become available in Such information could go a long way toward reducing the greatest technical uncertainties for the eRHIC concept. The total on-project cost for both approaches may potentially be reduced as technical risk is retired, by off- project funds especially for the detectors from international sources, by redirection of operating funds at the host laboratory or by reducing the design requirements.

Recommendations from the Town Meetings Run JLAB12 Run RHIC RHI Run RHIC Spin and other existing facilities Run ATLAS and NSCL Participation in LHC Build and run FRIB Build EIC Lead NLDBD INCREASE Instrumentation and MIE Increase theory and theory computing Increase experimental research in Astro, FS&N These flow into possible Working Group recommendations Requests JLAB $75M LE $116M RHI $31M ASTRO $25M??? OTHER FS&N $116M TOTAL 363M Not Priority Ordered!

Budget Constraints are Real! We were asked what resources and funding levels would be required to maintain a world leadership position in nuclear physics research and what the impacts are and priorities should be if funding available provides for a constant level of effort…

Budget History

General Thoughts How do we make it clear that we understand we cannot get everything. Many small recommendations only make sense if they are to shut something down. Otherwise how do you evaluate relative priorities? We have to trust the agencies have the wisdom to deal with scarce resources across areas of the field.

Summary The community worked very effectively preparing for the Long Range Plan Thank you! The LRP working group respectfully grappled with a number of serious issues. I believe we are creating a plan that will allow us to reach new horizons. When you see it in October, I hope you will agree.

Backup

2007 EIC Recommendation The nuclear science community has recognized the importance of this future facility and makes the following recommendation. We recommend the allocation of resources to develop accelerator and detector technologies necessary to lat the foundation for a polarized Electron-Ion Collider. The EIC would explore the new QCD frontier of strong color fields in nuclei and precisely image the gluons in the proton.

2007 FS&N Recommendation We recommend a targeted program of experiments to investigate neutrino properties and fundamental symmentries. These experiments aim to investigate the nature of the neutrino, yet-unseen violations of time-reversal symmetry, and other key ingredients for the New Standard Model of fundamental interactions. Construction of a Deep Underground Science and Engineering Laboaratory is vital to U. S. leadership in core aspects of this initiative.