Plan- x1 meeting no. 4 – 27/04/10 at NCRA Auditorium, Pune GMRT SERVO SYSTEM PLAN X1 TARGET implements : 1a) Brushless drives 1b) PC-104 Servo computer.

Slides:



Advertisements
Similar presentations
Innovation Intelligence ® VisSim for Motor Control October 2014.
Advertisements

TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
Chapter 2Test Specification Process. n Device Specification Sheet – Purpose n Design Specification – Determine functionality of design n Test List Generation.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Autonomous Helicopter: James Lyden Harris Okazaki EE 496 A project to create a system that would allow a remote- controlled helicopter to fly without user.
Motor Control Lab Using Altera Nano FPGA
MICE Electronics & DAQ P J Smith University of Sheffield.
PRIME Antenna Inc. Antenna Test Team Adam Straubinger Alan Condino Thanh Hong Ronnie Berg Sam Gregorio.
1 DIFFERENTIAL POLARIZATION DELAY LINE Controller FINAL REPORT D0215 Supervisor : Mony Orbach Performed by: Maria Terushkin Guy Ovadia Technion – Israel.
1 Autonomous Parallel Parking Alex Braun & Sergey Katsev.
Motion Tracking Recorder 360 (MTR-360) Group #1 Lee Estep Philip Robertson Andy Schiestl Robert Tate.
A.R. Hertneky J.W. O’Brien J.T. Shin C.S. Wessels Laser Controller One (LC1)
Catheter Guidewire Control System Derek Carlson & Caleb Anderson Advisors: Dr. Dempsey & Dr. Stewart.
 Background  Problem Statement  Solution  Mechanical › Azimuth › Elevation › Concepts › Static and Dynamics of System  Software › SatPC32 › Interpolation.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Controls Lab Interface Improvement Project #06508Faculty Advisors: Dr. A. Mathew and Dr. D. Phillips Project Objectives This work focused on the improvement.
Robotic Arm Controller A VLSI Implementation Team: Justin Hamann & Dave McNamara Team: Justin Hamann & Dave McNamara Advisor: Dr. Vinod Prasad Advisor:
Multidisciplinary Engineering Senior Design Project 6508 Controls Lab Interface Improvement Critical Design Review 2/24/05 Project Sponsor: EE Department.
MUST HAVE SHOULD HAVE COULD HAVE Module # 010. Qi Hardware Objectives Recognize hardware Know how to interface to field equipment Know the 4 different.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
Plan Projects – Current status S.Sureshkumar, Engineer E Fiber Optics and RFI Group.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Computerized Train Control System by: Shawn Lord Christian Thompson.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Engineer Training RTRun – Real Time Software TJ8300 / TJ8500 RTRun – Real Time Software.
Project Life Cycles.
Autonomous Helicopter James LydenEE 496Harris Okazaki.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
Software Status Sonja Vrcic Socorro,
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Progress report Collaboration meeting 23-SEP-2009
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Detection of Patient Falls Using Three-Axis Accelerometer Umer Jamshaid Tyler Quarles Parampal Randhawa Martha Serna Matthew Treinish April 26, 2011 School.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
BARC-IIFC collaboration meet RF Solid-state Power Amplifiers at 325 MHz RFSS, TPD, BARC.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
4m. Blanco TCS Upgrade: Signals and Interfaces
Prototyping SoC-based Gate Drive Logic for Power Convertors by Generating code from Simulink models. Researchers Rounak Siddaiah, Graduate Student-University.
4m. Blanco TCS Upgrade: Electronic Status at March/2010
SPF MAG Quarterly Report – Feb 2015
<Add team picture or relevant project picture here>
T1 Electronic status Conclusions Electronics Cards:
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
4m. Blanco TCS Upgrade: Signals and Interfaces
Comprehensive Design Review
Gustaaf van Moorsel September 9, 2003
Control System Summary of Changes Since PDR
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Status of the ESS High Power RF Systems
Field installable, upgradeable and scaleable
Presentation transcript:

Plan- x1 meeting no. 4 – 27/04/10 at NCRA Auditorium, Pune GMRT SERVO SYSTEM PLAN X1 TARGET implements : 1a) Brushless drives 1b) PC-104 Servo computer 1c) Generic antenna Controller unit (GACB) 1d) Solid state interface logic– SSI 1e) Feed position system – 6U 9/11/20151dec 2008

9/11/2015dec 20082

Brushless drive … work planned for 2k8-9 9/11/2015dec One antenna system testing with test setup (simulating the actual dual drive of either azimuth or elevation axis) in progress in LAB. …..Completed in MTAC period 2010 both in: a) position loop mode b) Velocity loop mode. Overall position accuracy matches with the test report of Leopold

Installation and commissioning on antenna by end 2008 …….Documentation / computation of test plots/results in progress to arrive at performance parameters like a) bandwidth b) resonant frequency Two more antenna systems procurement, testing and installation by March 2009 ……. Purchase order placed in feb 2010 for 4 more systems

Brushless drive … work planned for 2k10-11 Test Large test setup by interfacing SSC to BLDC and later with PC-104 On successful completion of the above, test antenna - C04 with BLDC + PC- 104 Leave the unit at C04 for Observation and feedback from Engineering group / GTAC users. Assemble one antenna bldc system in a 19” rack for minimising RFI emanating from the drives. Test / Measure the RFI after the rack is assembled and submit for acceptance and approval for mass production

Block Diagram ….BLC configured in position loop

Posn.error = +/- 1.6sec

Block Diagram ….BLC configured in velocity loop

Summary of load velocities for different scale factors in Algorithm Analog i/p – to ADC Velocity cmd.Scale factor Load vel. In cnts/sec Load vel. In deg/min Remarks Velocity error 10 V V / ‘sec/s 10 V

Gear box being hauled up to the setup 9/11/201512dec 2008

Generic Antenna Board Functional Block Diagram PC104 Master PC104 Slave 104 lines in Parallel Addr/data bus buffers Addr/data bus buffers CPLD 2 CPLD 1 AIP section DIP section Encoder Interface AOP section DOP section SPI Interface QUAD UART CAN controller K/B,mouse VGA USB TCP/IP 3 x RS232 RS422/RS485 BLDC Drives PMDC Drives Field Sig. Field Sig. Field Sig. Sensors Front Panel (Maintenance) RS232 Add. lines Data lines

Generic Antenna Controller – GAC plan status and projections – 2k Generic Antenna Controller Board FY : Work done : Specification on a new integrated Generic antenna Controller board is finalisedthis year and a detailed design exercise was undertaken in active collaboration with BARC's Control and Instrumentation division. The design has been completed and frozen. PCB layout work with a vendor is in progress currently. It is expected to finalize the layout work by Sept The boards are expected to be populated by Oct 2010 and tests would start in Oct2010. Antenna tryouts are likely by the end of this financial year. 9/11/2015dec

Solid State Interlocks – SSI plan status and projections – 2k10-11 FY : Work Done : --- SSI systems were installed on antennas in this financial years, taking number of antenna with SSI to 22 including 1 prototype board. In addition, work was undertaken to get fresh PCBs ready for 10 antennnas and the population of these PCBs is in progress. It is expected to get 10 systems ready and tested in the coming financial year and install at least 08 systems on antennas, subject to availabilty of antennas during GTAC cycle. 9/11/2015dec

PC-104 FY : works planned / done Development of Graphic user Interface – GUI developed for monitoring, data logging from antenna base. Make RFI measurements and Cabinet vendor identification in progress Performance checks after installation for one GTAC cycle compensator extensively tested at C02, Antenna test plan report generated to validate the code during the antenna installation,added a state machine “calibrate” 9/11/2015dec

Pc-104 works planned 2k10-11 Extensive testing from CEB thro’ ABC Performance evaluation of pc-104 during GTAC observation….2 weeks Interfacing with BLDC at Rayshed/JOgshed with simulated load Actual interface with BLDC at antenna base and control from CEB Make RFI enclosure

Budget Utilisation in Lakhs(Rs) & proposed ActivityPlan 2k9-10ActualPlan 2k QTY Rs Lacs BLDC5 ants (150.00) 4 ants (145.78) 6 #( ) PC-104 & GACB 30 & 5 ants ( 25.00) Prototype ( 2.04) 10 # 5 #( ) BL Drive ( indig) nos( 20.00) Lab eqp.(10.00)( 4.70) Fps – 6U & Angle enc. 10ants &5# ( ) 10ants ( 6.90) 10 ants 5 # ( ) SSI15 ants22ants ( 2.00 ) 08 ants( 2.00) Lightning protection ant (4.00 ) NIL DC Servo Motor magnet 5 nos ( ) #( )

Thank you 9/11/2015April