January 25, 2005 AIP 8 Update Joint Distribution & Class V Architectures Mr. Pat Kielbasa USTRANSCOM J6-A

Slides:



Advertisements
Similar presentations
A BPM Framework for KPI-Driven Performance Management
Advertisements

Chapter 5 – Enterprise Analysis
Department of Defense Supply Chain Material Management Regulation DOD R 23 May 2003 Office of the Deputy Undersecretary of Defense for Logistics.
DoD Information Enterprise Architecture v2.0
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
June 2, 2009 AIP 9 (Action 6B Partial) Update New Technology – Trailer and Rail Tracking Mr. William R. Maham DTTS Ops and Quality Branch Chief
BTA Supply Chain Update for L&MR
REJ - 1 REJ from Microsoft Chris Gibbs November 5 th, 2007 MBA 731.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Chapter 14 Supply Chain Management
Delivery Methodology.
IIBA Denver | may 20, 2015 | Kym Byron , MBA, CBAP, PMP, CSM, CSPO
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Chapter 5: Supply Chain Performance Measurement and Financial Analysis
Value Chain Strategy for Services automation self-service offshoring selective outsourcing insourcing selective automation selective outsourcing offshoring.
GTM for Product Leaders Project Overview A project that guides product leaders and their teams in developing a successful go-to-market strategy.
ORGANIZATION MODELING OVERVIEW Dr. Denice D. Withrow, ISC May 20, 2013 Cleveland Chapter Presentation.
Enterprise Architecture
1 Data Strategy Overview Keith Wilson Session 15.
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
Customer Relationship Management (CRM)
This report is presented in three parts viz the project framework for the period March 2009 – December 2010, the achievements during the year under review.
BPM Governance Identifying methods for prioritizing, standardizing, measuring and controlling BPM efforts.
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Microsoft ® Office Project Portfolio Server 2007.
What is Business Analysis Planning & Monitoring?
Proposed EA Assessment Framework 2.0 Chief Architect’s Forum (CAF) Dick Burk Chief Architect and Director of Federal Enterprise Architecture Program, OMB.
Supplier Relationship Management in the Context of Supply Chain Management Keely L. Croxton, Ph.D. Asst. Professor of Logistics The Ohio State University.
Joint Deployment & Distribution Enterprise (JDDE)
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
MIS Information Systems in Organizations Dave Salisbury ( )
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
The Challenge of IT-Business Alignment
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Strategic Mobility 21 Focused on Making Decision Relevant Data A Logistics Multiplier in All Domains Strategic Mobility 21 Focused on Making Decision Relevant.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Copyright  2007 McGraw-Hill Pty Ltd PPTs t/a Marketing Research 2e by Hair, Lukas, Bush and Ortinau Slides prepared by Judy Rex 1-1 Chapter One Overview.
Logistics McGraw-Hill/Irwin
DoDAF Journal 5 Jan 2012 DoDAF Team. DoDAF 2.0 Journal Outline Purpose & Objectives Journal Changes First Issue Layout First Issue Articles Planned 2.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
How to Organize the Systems Selection Process Using the SCOR Framework Pittiglio Rabin Todd & McGrath April 12, 2000 David Kennedy, Principal.
MANGT 660 (A): Supply Chain Planning and Control Chapter 12 Manufacturing Focused Supply Chain Integration (2/2)
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
EPA Enterprise Data Architecture Metadata Framework Assessment Kevin J. Kirby, Enterprise Data Architect EPA Enterprise Architecture Team
Brig Gen Henry Taylor, USAF The Joint Staff Vice Director for Logistics (VJ4) Future Joint Logistics Initiatives Panel 19 May 2004 Future Joint Logistics.
Pioneering Business Models through Business Architecture Transformation BMT 3.0 Overview.
2 Developing Marketing Strategies and Plans
(c) Adaptive Processes Consulting Be with the Best!
BEA Orientation November 13, 2007
Presented by: S.M.Tabatabaee Nasab SCOR spans: All customer interactions, from order entry through paid invoice All product (physical material.
Outlines Overview Defining the Vision Through Business Requirements
UTA/ARRI. Enterprise Engineering for The Agile Enterprise Don Liles The University of Texas at Arlington.
Warfighter Workforce Stewardship Business Support Development Improvements Process Warfighter Workforce Stewardship Business Support Development Improvements.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Middle Fork Project Relicensing Process Plan April 25, 2006.
A Framework for Marketing Management International Edition 2 Developing Marketing Strategies and Plans 1.
How the CDC Enterprise Architecture Development Methodology Can Help You Albert Decker, Northrop Grumman John Fitzpatrick, CDC.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
PGDM/ / II Trimester/E-Business. What is supply chain management?  Supply chain management is the co- ordination of entities, activities, information.
Supply Chain Operations Reference Model (SCOR)
Project Planning: Scope and the Work Breakdown Structure
Network Optimization Executive Seminar Track 1, Session A
Identify the Risk of Not Doing BA
INTEGRATING THE SUPPLY CHAIN TO REAP THE REWARDS
The Open Group Architecture Framework (TOGAF)
© 2016, 2017 Change Healthcare Solutions, LLC. All Rights Reserved.
BEA 10.0 CCB Architecture Artifact Approval Brief
Supply Chain Process ISCOM/ 374.
Presentation transcript:

January 25, 2005 AIP 8 Update Joint Distribution & Class V Architectures Mr. Pat Kielbasa USTRANSCOM J6-A

January 25, Overview AA&E Distribution Task and Participants Supply-Chain Operations Reference-Model (SCOR) and the Joint Distribution Architecture (JDA) Future Architecture Development Capabilities-Based Assessment Team (CBAT) IT Focus Areas Class V Automated Information Systems (AIS) Class V IT Architecture – Proposal How do USTRANSCOM Architecture efforts fit into the goals of the AA&E Implementation Plan?

January 25, Tasks – AA&E / Distribution Transform DoD’s AA&E management, business processes and technology investments from an individual segment view to an end-to-end logistics chain view. Develop a Class V distribution architecture that complies with the DOD Business Enterprise Architecture and DODAF. Use the architecture to expedite steps to identify Class V system functionality improvements applied to the ultimate Class V AIS distribution solution.

January 25, Key Participants –OSD (AT&L) - facilitate Service, COCOM and DLA staff participation during Class V enterprise architecture development. –USTRANSCOM - lead Class V distribution enterprise architecture development efforts as the DPO. Identify distribution system functionality for AA&E within the context of distribution portfolio management and the BEA Log –The Military Services - assist in building Class V distribution enterprise architecture and defining current and future-state Class V system functionality. –DLA – review Class V architecture for consistency with BEA Log architecture – The Joint Munitions Command (JMC) – lead definition and validation of Class V architecture and enabling system functionality as the DoD Single Manager for Conventional Munitions.

January 25, Supply Chain Operations Reference – model (SCOR) DOD R, Supply Chain Material Management Regulation –C The DoD Components shall use the supply chain operational reference processes of Plan, Source, Maintain/Make, Deliver, and Return as a framework for developing, improving, and conducting materiel management activities to satisfy customer support requirements developed collaboratively with the support providers Return Make Deliver Plan Return Source Supply-Chain Operations Reference-Model (SCOR)

January 25, Return Level Description Schematic Comments Top Level (Process Types) Level 1 defines the scope and content for the Supply chain Operations Reference-model. Here basis of competition performance targets are set. Source Make Deliver Plan 1 # Configuration Level (Process Categories) A company’s supply chain can be “configured- to-order” at Level 2 from core “process categories.” Companies implement their operations strategy through the configuration they choose for their supply chain. 2 Process Element Level (Decompose Processes) Level 3 defines a company’s ability to compete successfully in its chosen markets, and consists of:  Process element definitions  Process element information inputs, and outputs  Process performance metrics  Best practices, where applicable  System capabilities required to support best practices  Systems/tools Companies “fine tune” their Operations Strategy at Level 3. 3 P1.1 Identify, Prioritize, and Aggregate Supply-Chain Requirements P1.2 Identify, Assess, and Aggregate Supply-Chain Requirements P1.3 Balance Production Resources with Supply-Chain Requirements P1.4 Establish and Communicate Supply-Chain Plans Companies implement specific supply-chain management practices at this level. Level 4 defines practices to achieve competitive advantage and to adapt to changing business conditions. Implementation Level (Decompose Process Elements) 4 Not in Scope Supply-Chain Operations Reference-model Return SCOR Levels of Process

January 25, SCORJDA BaselineClass of Supply JDA Decomposition Methodology Use of SCOR Directed by DoD Guides lower level development (what activities to consider) Consistent levels of detail Automatic linkage to SCOR through Baseline Allows groupings of like activities of different architectures for comparison SCOR Level 3 Activity Example D1.10 Load vehicle, generate ship docs, verify credit, & ship product

January 25, SCOR Level 4 – JDA – Baseline Example SCOR Level 5 – ASP (Distribution Site) Example SCOR Level 4– ASP (Distribution Site) Example

January 25, Distribution Architecture SCOR Level 3 to Class 5

January 25, Prime Thread

January 25, Relationship of Architecture Views and Data To Be Architecture 385 Activities 209 Products 1338 Relationships

January 25, Class-V Interim “To-Be”

January 25, Future Architecture Development Activities JDA Level 4 – Potentially the right level for developing an operational architecture for the DPO –Class V activities decomposed to level 4 as a minimum –System development will require operational activity decomposition to Level 5 and below to enable operational activities Continue associating systems with operational views for Class V –Relationship between the operational activities and system functions (SV-5)

January 25, CBAT Recommended IT Improvement Focus Key Functionality: –Visibility—you can only optimize what you can see –Collaboration—each Service capable in and of itself, but no shared environment –Automation—key data objects need to flow from planning to execution without reentry

January 25, CBAT Defined Key Data Objects Class V Architecture has to be able to support 4 key data formats with as much automated interface as possible: –Requisitions –Transportation Control Numbers (TCN) –Transportation Control and Movement Documents (TCMD)- to include ATCMDs –Unit Line Numbers (ULN)

January 25, AIS Supporting Class V Identified automated systems that support class V distribution –Original list of 41 narrowed to ~24 –Reviewed 24 systems to ascertain what capabilities currently exist to fill gaps –Many of the capabilities desired by CBAT exist in current systems USAUSTCUSAFUSNJointUSMC MTMSDTTSCASOISJOPESULAS NLACGATESCMOS RFID/AITGFMLOGMOD SAAS-MODGTN-21 TAMIS-RIBS WPS LMP TC-AIMS II JMPS CFAST JTAV JFAST AT21

January 25, Class V System Functionality Matrix

January 25, Potential DPO Class V IT Architecture REQUIREMENTS AUTOMATIC ULN/CIN CREATION CONUS JOPES GATES WPS GFM CMOS TC-AIMS II RF-ITV TRANS DTTS GTN21 JOPES Future System JMC DPO CL-V DPO Theater DDOC REQUIREMENTS AUTO- MUREP UNIT LEVEL VISIBILITY SYS LMPCASOISLMPCASOIS THEATER OPTIMIZER COLLABORATIVE TOOL AUTOMATIC CIN/ULN CREATION Future System

January 25, Possible Way Ahead For Class V IT Analysis Analysis of Alternatives Report Development Detailed Tech Solution Business Case development by module Sub- Portfolio Manager System Implementation approval Implementation / Spiral Development 3 Nov – 31 Jan $ $ 1-28 Feb ROM costs Designation of Executive Agents Recommended Approval Decision Brief Integration of Functional and Technical Analysis results 1 June – 31 July 1 Mar – 31 May 3 Alternatives

January 25, AIP 8 Takeaway Completed Class V As-Is and To-Be Operational Architectures Using: –DPO context –SCOR Model v.6.1 –DOD Architecture Framework Examined Existing Class V Systems Capabilities: –Identified Key Data Objects –Developing system architecture alternatives