Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.

Slides:



Advertisements
Similar presentations
PLM Implementation in L&T Heavy Engineering Ninth ARC India Forum, Pune August, 2011 Achieving Operational Excellence Through IT and Automation Solutions.
Advertisements

Autodesk Integrations Overview SmartDesk A seamlessly integrated, affordable, out-of-the-box, Windows based drawing and document management tool for.
Experience with an IT Asset Management System
Teamcenter: Engineering Data Management System
Cost Sharing Update Facilities, Equipment & Other Resources – New format will assist proposers in complying with NSF cost sharing policy and is a required.
ProjectWise Integration Server Project Collaboration across the Distributed Enterprise Joe Croser Global Marketing Director, Platform & SELECT.
© 2012 Autodesk MA5938-V Integrating Autodesk® Inventor® with SAP and Utilizing Model Structure for Production Planning Alexander Crane CIDEON consultant.
T-FLEX DOCs PLM, Document and Workflow Management.
PLM-TEAMCENTER GATLA SAI RAM INRODUCTION HISTORY COMPONENTS AND PRODUCTS DATA MANAGEMENT IN TEAMCENTER - EXPORTS AND IMPORTS -MIGRATION -FACTORS.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
The Worldwide Graphic Language for Design
PLM windchill By- Bhanu Prakash Vemula Matrikel no
Siemens PLM Software Overview 28 th of May 2008 Bulgaria Colin Johnson.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 8 Slide 1 Tools of Software Development l 2 types of tools used by software engineers:
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Deploying Visual Studio Team System 2008 Team Foundation Server at Microsoft Published: June 2008 Using Visual Studio 2008 to Improve Software Development.
Professional Systems Associates, Inc. We’ve been building powerful, people-oriented software solutions for commercial and government.
1 Teamcenter: Engineering Data Management System UG NX: Transition to New Mechanical CAD System Rich Stanek On behalf of the Teamcenter/NX Implementation.
GOAL ABOUT US Established : 12 Jan 2010 Turn over( ) : 30 Lakhs No of employees : 6 Certification : Applied for ISO 9001:2008.
Introduction to BIM BIM Curriculum 01.
Web 2.0 for Government Knowledge Management Everyone benefits by sharing knowledge March 24, 2010 Emerging Technologies Work Group Rich Zaziski, CEO FYI.
New Product Development Management NPDM 11 Mohsen SADEGHI
Margaret Kubitschek, Solution Architect Sam Brewster, Customer Delivery Manager Dennis Keating, Account Executive Siemens PLM Software19 March 2010 Teamcenter.
By A + B Solutions and LC Consulting Services ®. How to Integrate Production in to T EAMCENTER by LC Consulting Services 8 Denison Parkway East Corning,
Knowledge Reuse What’s New in NX6 May 2008.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Difference between Structured Analysis and Object Oriented Analysis?
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
-1- Project Name Project Name Weekly Project Report Project Manager : __________________ Date : ___________________.
EDMS for CFS Discussion: How to best use EDMS for CFS in ILC preparation? Lars Hagge, Benno List Deutsches Elektronen-Synchrotron DESY LCWS13, Tokyo,
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Teamcenter – Overview Teamcenter - Lab Wide EDMS1.
E-Document Part II: ILC EDMS ILC / LCWS Workshop, Hamburg 2007 Lars Hagge Deutsches Elektronen-Synchrotron (DESY)
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
S1 Global Plug Compatibility CAD Tools & Collaboration April 23, 2008 Don Mitchell, FNAL.
IEEE IT (Information Technology) Strategy – 2005 Unapproved.
1 AutoCAD Mechanical 2006 – What’s New? Advanced Micro Systems, Inc.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Thomas Jefferson National Accelerator Facility Page 1 FNAL/JLab weekly meeting, April 23, 2014 Agenda  Path Forward  Status at FNAL  Status at JLab.
Managing TDM Drawings Lifecycle WorkFlow Created: March 30, 2006 Updated: April 10, 2006 By: Tony Parker.
Chang, Wen-Hsi Division Director National Archives Administration, 2011/3/18/16:15-17: TELDAP International Conference.
Engineering Process IIFC Rich Stanek October 27, 2010.
Establishment of Engineering Data Management System in India based on Teamcenter Computer Division, BARC 27 Feb, 2015.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Engineering Documentation
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Fermilab LCLS-II Cryomodule QA/QC Model and Software Tools ESS Cryomodule Workshop, 16-Oct-2014 Jamie Blowers Head of Machine Shop and Quality & Materials.
Brian Drendel November 15, Ideas TDM (Engineering drawings) Beamssrv1 Z: drive Beamssrv1 Department Drive Indico Meeting Server Document Database.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
PXIE CAD Model: Status, Responsibilities and Plan Forward 14-Jan-2014 C. Baffes Project X Doc DB: Project X-doc-1243.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
The New Generation of CAD Tools
Background - Business Vision
Engineering into Nonin
PLM, Document and Workflow Management
Teamcenter for CAD data management
Tools of Software Development
External Collaboration
Experience with an IT Asset Management System
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Integrating MBSE and PLM
Eastern Mediterranean University Department of Mechanical Engineering
EMA/Cadence Presentation for Moog Library Data Management
Document Management Don Mitchell March 15, 2019.
CAD DESK PRIMAVERA PRESENTATION.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 8 Slide 1 Tools of Software Development l 2 types of tools used by software engineers:
Presentation transcript:

Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

What is Teamcenter?  Teamcenter is a commercial Product Lifecycle Management (PLM) software owned by Siemens  PLM is the process of managing the entire lifecycle of a product from its conception, through design and manufacture, to service and disposal  Teamcenter is used by  more than 6,400 customers across about 9,900 operations with 5 million licensed seats.  DESY for the XFEL project (TC Enterprise), and also at Jefferson Lab (TC Unified) Who will Teamcenter affect?  Scientists, engineers, designers, technicians, machinists, QC, ES&H & procurement personnel  Mechanical, electrical, and civil disciplines Goals  Common access point for engineering related documents – one Engineering Database Management System (EDMS)  Easily find engineering information, engineering reports, analysis on previous designs…  Enhance Collaboration between internal groups and external Labs, Universities, others…  Lab wide workflow processes for reviews and signoffs

Benefits Facilitates Collaboration  Can handle SolidWorks files  Project X – PXIE LBNL ANL JLAB  IIFC  Existing India CAD Models  Benefit  Allows us to collaborate with other labs on common projects

Benefits Visualization  New Functionality at Lab  View, Measure and Markup  Benefit  Allow for easier project collaboration and better understanding of issues

Benefits Provides High Quality Imaging  This helps increase communication and understanding prior to manufacturing  Examples  650 Mhz Cavity  IB3 Proposed improvements Only Computer Images

Benefits Reuse  Benefit - Having a repository of “Common Items” (flanges, bolts, etc.) allows significant amount of use. Flanges Cap Screws Structural Components

Status Current Status Phase 1 –  Went live January 20, 2012  Currently ~4 users per day (~20 users per day at peak) logged in to production  More than 17,000 Common Items created  More than 650 Models/Drawings created to date  Crystal Collimator completion April 2012

Status DesignItems  Current Status  Total Items created in Production > 650 since January 20th First Pilot Project Examples

Status Phase 1  New Projects using NX and Teamcenter  Technical Division SC Magnets - 11 Tesla Magnet SRF - Research Test Cryostat LBNE – Trim Dipole Assembly  Particle Physics Division SCDMS - Adsorber Mounting Vessel LBNE – LArk 6 Kton Detector Beamline - LBAR Timing Detector  Accelerator Division Crystal Collimator PXIE – Facilities Phase 2  Portfolio Management Team (PMT)  Approved implementation of Teamcenter – Phase 2  Detailed planning in progress

Next Steps Short Term  Fix Production “Work Arounds” identified by Pilot Team  Migration of Mechanical Ideas CAD Data to NX and Teamcenter 2012 / 2013  On-Boarding for LBNE, Mu2E and Project X  Create Remaining Item Types (for Engineering Manual Documents)  FESS Workflow  AutoCAD Integration for FESS and Electrical  Electronic Sign-off  Requirements Management  Change Management  ECAD Integration  Migrate Data (Electrical, FESS, others) Questions and Comments  Thank you