Quantitative Decision Making and Risk Management CS3300 Fall 2015.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

PROJECT RISK MANAGEMENT
Decision Theory.
Managerial Decision Modeling with Spreadsheets
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
Decision Theory is a body of knowledge and related analytical techniques Decision is an action to be taken by the Decision Maker Decision maker is a person,
Decision analysis: part 1 BSAD 30 Dave Novak Source: Anderson et al., 2013 Quantitative Methods for Business 12 th edition – some slides are directly from.
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
Project Management.
Chapter 7: Managing Risk
© 2008 Prentice Hall, Inc.A – 1 Operations Management Module A – Decision-Making Tools PowerPoint presentation to accompany Heizer/Render Principles of.
Operations Management Decision-Making Tools Module A
Project Risk Management
Sanjay Goel, School of Business/Center for Information Forensics and Assurance University at Albany Proprietary Information 1 Unit Outline Quantitative.
Session 33 Guest Speaker: Gini Van Siclen. Risk Management for Project Managers Gini Van Siclen.
Managing Project Risk.
1 Decision Analysis by Dr. AA. 2 Man decides based on what he believes… Man believes what he want to believe…
© 2006 Prentice Hall, Inc.A – 1 Operations Management Module A – Decision-Making Tools © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
ELECTRONIC SYSTEMS ENGINEERING TECHNOLOGY TEXAS A&M UNIVERSITY Innovating tomorrow’s products and systems today Dr. Joseph A. Morgan, D.E., P.E.
Project Risk Management
PRM 702 Project Risk Management Lecture #28
Project Risk Management: An Overview Andrew Westdorp Program Manger, IV&V Lockheed Martin (301)
Project Risk Management Supplement. The Importance of Project Risk Management  Project risk management is the art and science of identifying, assigning,
Chapter 11: Project Risk Management
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J A-1 Operations.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
IT Project Management, Third Edition Chapter 11 1 Chapter 6: Project Risk Management.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
程建群 博士 (Dr. Jason Cheng) 年 03 月 Software Engineering Part 05.
Engineering Economic Analysis Canadian Edition
Advanced Project Management Project Risk Management Ghazala Amin.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
SOFTWARE PROJECT MANAGEMENT
Decision Analysis Mary Whiteside. Decision Analysis Definitions Actions – alternative choices for a course of action Actions – alternative choices for.
A - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall A A Decision-Making Tools PowerPoint presentation to accompany Heizer and Render Operations.
Models for Strategic Marketing Decision Making. Market Entry Decisions To enter first or to wait Sources of First-Mover Advantages –Technological leadership.
R ISK A NALYSIS & M ANAGEMENT. Risk – possibility that an undesirable event (called the risk event) could happen – Involve uncertainty and loss – Events.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
An EDI Testing Strategy Rosemary B. Abell Director, National HIPAA Practice Keane, Inc. HIPAA Summit V October 30 – November 1, 2002.
Introduction to Project Management Chapter 9 Managing Project Risk
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
QUANTITATIVE TECHNIQUES
Decision Analysis.
1 Project Management C53PM Session 4 Russell Taylor Staff Work-base – 1 st Floor
MODULE 9 MANAGERS AS DECISION MAKERS “Decide first, then act” How do managers use information to make decisions and solve problems? What are the steps.
Decision Making Under Uncertainty: Pay Off Table and Decision Tree.
Stoimen Stoimenov QA Engineer SitefinityLeads,SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Decision Tree Analysis. Definition A Decision Tree is a graphical presentation of a decision-making process within a business which aims to highlight.
Managing Project Risk – A simplified approach Presented by : Damian Leonard.
Software Risk Management
ESET 419 Engineering Technology Capstone I
Chapter 11: Project Risk Management
Steps to Good Decisions
Recognization and management of RISK in educational projects
Supplement: Decision Making
Project Risk Management
RISK ASSESSMENT TOOL PREVIEW
PMI North Area PMP Exam Study Group
CIS12-3 IT Project Management
Decision Analysis Objective
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Risk Analysis and Management: L3
Project Risk Management
Presentation transcript:

Quantitative Decision Making and Risk Management CS3300 Fall 2015

Review Critical Path Scope Staffing Plan Activity-Based Costing

Making Decisions Is this decision the right one. Quantitative techniques can HELP with the process Decision Trees help with multistage or sequential problems.

Tree Syntax Decision point Course of action 2 Course of action 1 Chance event Branch probability

Draw the Decision Tree RULE 1: The net value at the end of a branch equals the sum of the costs and benefits along the tree from the first decision event to the end of the branch in question. RULE 2: Trees are evaluated in reverse order from the sequence of events. If evaluating from right to left, a chance event where 2 or more branches converge, the expected value is the sum of the net value for each branch times the probability of that branch.

Draw the Tree Rule 3: At each decision point, select the expected value which best meets the objective from among the expected values. For minimization, pick smallest value, for maximizing pick the largest value.

Example Situation You have the option of taking an income tax prep course. If you attend the course, it costs $35. The course claims that 75% of the students save an average of $60 on their taxes. The course also says 20% of the students save $35, and 5% find they save nothing. Should you take the course?

Take the Course?? No (no cost, no benefit) EV = 0 Yes, -35 Save 60 (60- 35)*.75 = Save 35 P=.75 P=.20 Save 0 (35 -35) *.2 = 0 (0 – 35) *,05 = EV = – 1.75 = 17 P=.05

Decision Matrix Need to choose an option from a list. Need team members buy-in and a way to show upper management how you arrived at a decision.

Matrix Step 1: Generate a list of choices Step 2: Generate criteria for selection Step 3: Assign a weight to criteria based on priority Step 4: Assign a value to each choice/criteria intersection that shows how well it is supported Step 5: Multiply number by weight of criteria Step 6: Sum total values for each column and choose maximum

Example Want to buy a new laptop AlienwareMac Weight (3) 3 / 9 5 / 15 Screen Quality (2) 3 / 6 5 / 10 Compile Speed (5) 5 / 25 3 / 15 Graphics Card (5) 5 / 25 3 / 15 Sum 6555

exercise What should the target language be for a T- square clone.

Risk Management Risk Assessment – what are risks and potential impact Risk Control – how will we resolve the risk A measure of the likelihood and loss of an unsatisfactory outcome affecting the software project, process or product.

Risk in itself is not bad; risk is essential to progress, and failure is often a key part of learning. But we must learn to balance the possible negative consequences of risk against the potential benefits of its associated opportunity. (Van Scoy, 1992) If you don’t actively attack the risks, they will actively attack you. (Tom Gilb)

Software Risk Project Risk – resource constraints, external interfaces, supplier relationships, contract restrictions. Process Risk – planning, staffing, tracking, quality assurance, configuration management, requirements, etc. Product Risk – requirements stability, performance, complexity, test specs.

Risk Identification What is risk? Probability of occurrence Impact of risk Exposure (probability * cost) or qualitative (see next graphic)

Software Engineering Institute paper on Risk Management

Mitigation Strategies Acceptance Avoidance Protection Reduction Research Reserves Transfer

Taxonomy Analysis of Our Project