المؤتمر الهندسي الدولي الثاني للإعمار والتنمية الجامعة الإسلامية- غزة The 2 nd Inter. Engineering Conference on Construction and Development Islamic University.

Slides:



Advertisements
Similar presentations
Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Advertisements

FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Comprehensive HVAC Pipe Estimating Software package Save estimating time by 50% Simple to use and inexpensive HVAC projects on computer Current customers.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
ATTENTION This presentation breaks down the purchasing process into 6 steps, which are then detailed in the subsequent slides. While responding from either.
Andrea O’Neill Cost/Price Analyst ACC-RSA. Elements of a Proposal; Proposal Example Indirect Rate Calculations Unallowable Costs; Preparing For Negotiations;
The Islamic University of Gaza
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
4-1 McGraw-Hill/Irwin ©2002 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Materiality and Risk.
SAMPLING. THIRD STANDARD OF FIELD WORK (AU ) “SUFFICIENT COMPETENT EVIDENTIAL MATTER IS TO BE OBTAINED THROUGH INSPECTION, OBSERVATION, INQUIRIES,
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
Knowledge is Power Marketing Information System (MIS) determines what information managers need and then gathers, sorts, analyzes, stores, and distributes.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
EM15 – Contractors COST MANAGEMENT
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
Auditing & Assurance Services, 6e
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
ولقد خلقنا السماوات والأرض وما بينهما في ستة أيام وما مسنا من لغوب (سورة ق )
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
CEM 520: Construction Contracting and Administration 03 June 2007
Arun Srivastava. Types of Non-sampling Errors Specification errors, Coverage errors, Measurement or response errors, Non-response errors and Processing.
Customer : contractor : December, 2012 Sociologic Research on Awareness of Industrial Property Protection Possibilities.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
4/21/2017 Evaluation Of Performance Measures For Materials Management Process In Industrial Construction Projects Term Project for CEM 520 Instructor:
Chapter 9 Audit Sampling: An Application to Substantive Tests of Account Balances This presentation focuses (like my course) on MUS. It omits the effect.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
Construction Contracts and Project Delivery Methods
Confidence Intervals about a Population Proportion
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Workshop on Quality Assurance in Geographical Data Production 1 Results of the Survey on Quality Asurance Routines Anders Östman University of Gävle SWEDEN.
By: Devi Sumadi The Administration information system design and construction of UD. Usaha Jaya Engineering Equipment Company.
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Outlining a Process Model for Editing With Quality Indicators Pauli Ollila (part 1) Outi Ahti-Miettinen (part 2) Statistics Finland.
1 Marketing Research. 2 The process of planning, collecting, and analyzing data relevant to a marketing decision.
Customer contractor Sociologic Research on Awareness of Industrial Property Protection Possibilities December, 2015.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
5.8 Finalise data files 5.6 Calculate weights Price index for legal services Quality Management / Metadata Management Specify Needs Design Build CollectProcessAnalyse.
QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS BY Gulam Farooq DEC 1997 Presented by: Hezam Al-Qahtani QUALIY MANAGEMENT PRACTICES AMONG A/E ORGANIZATIONS.
Chapter 8-1 Chapter 8 Accounting Information Systems Information Technology Auditing Dr. Hisham madi.
Margin of Error S-IC.4 Use data from a sample survey to estimate a population mean or proportion; develop a margin of error through the use of simulation.
Bidding Strategies. Outline of Presentation Markup Expected Profit Cost of Construction Maximizing Expected Profit Case 1: Single Known Competitor Case.
Development of Mining Information System (MIS) in Egypt Dr. Sameh Saad El din Ahmed Mining and Metallurgical Engineering Department
NHTSA's Crash Investigation Sampling System
Chapter 3: Cost Estimation Techniques
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Reality of Highway Construction Equipment in Palestine
2) Methodology Research instrument:
(Additional materials)
Factors influencing customer behavior
Under supervision of: Eng. Reema Nassar
Auditing & Investigations I
Confidence Intervals for a Population Proportion
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Construction Contracts
Supervisor: Eng. Mohammad abu neama
Faculty of Industrial Management CONCLUSIONS AND RECOMMENDATION
Basic Principles of Estimating
Factors Affecting Bid/No Bid Decision Making IN The West Bank
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

المؤتمر الهندسي الدولي الثاني للإعمار والتنمية الجامعة الإسلامية- غزة The 2 nd Inter. Engineering Conference on Construction and Development Islamic University - Gaza Cost Estimating Practices of Gaza Strip Construction Contractors Yaser Al-Shanti Dr. Kamalain Sha'ath

Research Aim The aim of this research is to explore the existing local practices in cost estimate for the building construction projects in Gaza Strip. The aim of this research is to explore the existing local practices in cost estimate for the building construction projects in Gaza Strip.

Research Objectives 1. To investigate the local practice of cost estimating in contracting companies in Gaza Strip. 2. To explore the influence of the Israeli closure on material prices, materials availability, and projects cost.

Research Objectives (Continue) 3. To explore the main obstacles which affect the cost estimation process. To evaluate the extent of using computerization in estimating. To evaluate the extent of using computerization in estimating.

The questionnaire consists of three sections 1. Company profile 2. Estimating and bid study item estimating techniques,item estimating techniques, database,database, indirect costs,indirect costs, the effects of closure on project cost,the effects of closure on project cost, the accuracy of bid estimates,the accuracy of bid estimates, the risk factor.the risk factor. 3. Computer aided estimating.

Field Study Population & Sample Gaza Strip Construction Contractors Gaza Strip Construction Contractors Data Analysis Statistical Package for Social Sciences (SPSS) is used in data analysis. Statistical Package for Social Sciences (SPSS) is used in data analysis. Total Third Class Second Class First Class Sample Respondents

Survey Results & Discussions Estimating Method Distribution

Pricing the Items 82.5% of contracting companies 82.5% of contracting companies usually use detailed analysis for usually use detailed analysis for all components of single item all components of single item (material, labor, plant, and (material, labor, plant, and subcontractor). subcontractor).

Database Most respondents (92.5%) Most respondents (92.5%) agree that developing materials database is materials database is necessary for the estimating necessary for the estimating process. process.

Indirect Costs The majority of respondents (82.5%) calculate the site overheads in details as specified in bid documents, while the rest calculate the site overheads as a percentage of the total direct cost of the project. The majority of respondents (82.5%) calculate the site overheads in details as specified in bid documents, while the rest calculate the site overheads as a percentage of the total direct cost of the project.

Effect of Security Closure on Construction Cost All respondents (100%) agree All respondents (100%) agree that the closure has a big that the closure has a big effect on the prices of the basic effect on the prices of the basic materials such as cement and materials such as cement and aggregate. aggregate.

Factors that Reduce the Accuracy of Bid Estimation The limited time allowed for estimating process. The limited time allowed for estimating process. Unclear project plans. Unclear project plans. The estimating overload in the company. The estimating overload in the company.

Risk Factor Almost all respondents (97.5%) believe that the closure has very high effect on determining the risk factor. Almost all respondents (97.5%) believe that the closure has very high effect on determining the risk factor. Increasing material prices is ranked second Increasing material prices is ranked second

Using Computer Applications in Different Areas Christofferson (1999) (1999)USALau (2000)New-Zealand Samadony & Al-Labbad(1997) Egypt EgyptAl-Shanti(2003) Gaza Strip (This research) CostEstimatingTool % of Use UsingSoftware In Cost Estimate

The obstacles which are affecting on the usage of Cost Estimate Software Shortage of user friendly CES. Shortage of user friendly CES. Shortage of qualified persons in using CES. Shortage of qualified persons in using CES.

Factors that Reduce the Accuracy of Bid Estimation The limited time allowed for estimating process. The limited time allowed for estimating process. Unclear project plans. Unclear project plans.

Conclusions The results confirm that the most used tool is using detailed analysis in estimating bid items. On the other hand, the least used tool is using of same item rate from previous projects The results confirm that the most used tool is using detailed analysis in estimating bid items. On the other hand, the least used tool is using of same item rate from previous projects

Conclusions (continue) All surveyed contractors believe that the Israeli closure on Gaza Strip is considered the main element that affects risk factor. All surveyed contractors believe that the Israeli closure on Gaza Strip is considered the main element that affects risk factor.

Conclusions (continue) Most of contracting companies are still estimating their bids manually. Shortage of suitable estimating software is considered the main obstacle for estimating computerization, Most of contracting companies are still estimating their bids manually. Shortage of suitable estimating software is considered the main obstacle for estimating computerization, another important factor is lack of availability another important factor is lack of availability of qualified persons in using computerized estimating packages of qualified persons in using computerized estimating packages

Conclusions (continue) The main advantages that can be obtained from using estimating software according to contractors ’ opinions are: Building database. Building database. Building archive for previous projects. Building archive for previous projects. Simplicity of updating the prices. Simplicity of updating the prices. Fast estimating and saving time. Fast estimating and saving time. Minimizing errors and human omission. Minimizing errors and human omission.

Thank You