AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Internet Contracting Estimating and Accounting System ICEAS Multi-Client Software Presented By: I C E A S.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
AOC Services EPA Analytical Operations/Data Quality Center August 14 th, 2001 US Navy/NAVSEA Training Session.
MIS 2000 Class 20 System Development Process Updated 2014.
Insert software product logo (or name) on slide master AASHTO Civil Rights and Labor Management System Executive Summary.
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2005 AASHTO TUG Field Management TAG Daytona Beach, Florida.
The Costs & Benefits of Implementing a MLLRS Sponsored by the AASHTO and FHWA and Conducted in the NCHRP.
Project Title (as descriptive as possible) Group Members CPE Computer Engineering Design I Electrical and Computer Engineering.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
In Alabama, it is illegal to wear a fake mustache that causes laughter in church.
Civil Rights & Labor SiteManager Tina Collins - CRL Janet Treadway - SM.
Insert software product logo (or name) on slide master 2005 Trnsport User Group Meeting November 6, 2005 Roger Bierbaum CRLMS Civil Rights and Labor Management.
City Sara VonBargen, Sr. Implementation Manager GovDelivery ® & Digital Subscription Management: December 8, 2009.
© Copyright 2011 John Wiley & Sons, Inc.
NOT FOR PUBLIC DISTRIBUTION State of Minnesota Technology Summary February 24, 2011.
1 Fundamental Principles of Solution Design and Implementation Chapter 3.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer 2003.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2004.
Goldsmith Brothers Insulations Economic Feasibility of Computer Integration in Cost Estimation Process by: Dave Travis Craig Krawiec Aaron Israel Sami.
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Site License Online Application Demo. Agenda Licensing Portal1 License Draw Down – All User4 License Draw Down – Super Users5 Contract Administration.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc.
Chief Operating Officer Greg Johnson. 7 Million Sheets of Paper.
Copyright ©2013 The Nielsen Company. Confidential and proprietary. 1 Consumer Confidence Survey – Q3 – 2014 Field Dates: August 13 – September 5, 2014.
Internet Bidding: Leveling the Playing Field TUG Conference St. Louis, MO October 8, 2007 Joe Phelan, Director, Info Tech, Inc. Ozette Brown, BidX Product.
TISWG Vaccine Choice Update May 20, Agenda  Choice Legislation  Current Ordering/Reporting Process  Choice Strategies  Timeline.
Craig J. Nichols, Secretary 1. Mainframe and Other Software Florida State Term Contract Mainframe and Other Software July 22,
Information Dissemination EENet Maria Ristkok Rhodes, 2004.
FieldNet 2.0a Joe Bruewer Michigan Department of Transportation 2004 AASHTO TUG Mobile, Alabama.
Trns port What is Trnsport? Trnsport is a of suite software modules, developed by AASHTO, designed to support state construction programs.
المؤتمر الهندسي الدولي الثاني للإعمار والتنمية الجامعة الإسلامية- غزة The 2 nd Inter. Engineering Conference on Construction and Development Islamic University.
AASHTO Subcommittee on Construction Burlington, Vermont Tuesday, August 17 th, 2010 Tom Ravn.
Dr. Walaa Nasr.  By the end of this lecture the students will be able to identify :  Computer system  Hardware and its contents  Software  Networks.
Mobile Inspection Experts. Wentworth Solutions began customizing database designs for various industries in 2002 In 2008, we began specializing in the.
Survey Responses Regarding Current Issues and Approaches for: Price/Supply Issues, Alternate Bidding Issues, Practices for Increasing Competition Prepared.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
Tyrone Ware FDOT Specifications & Estimates Office Estimating Systems Support Section.
AASHTOWare Program Overview to the Safety Data Systems Task Group of the Safety Management Subcommittee Presented by Tony Bianchi, Project Manager AASHTO.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
RECYCLE Recycle Compliance Tracking System PVK Corporation.
Ed Hardick Director of Marketing/ Product Support.
TransXML Survey and Scoping Study NCHRP Project Task 295 (2011) Frances Harrison Spy Pond Partners, LLC.
2010 Practice Management Annual Conference Using Time Matters® to Manage Firm & Communications Presented by: Duane Cary.
Greening of IT – The Business Case May 2009 Presented By: Information Access Systems & The Virginia Department of Motor Vehicles.
Annual FIMS Comprehensive Training Argonne National Laboratory May 6, 2015.
Improving your Audit Process Through Technology Christopher McDonald Director of Field Loss Prevention, Babies R’ Us Inc.
CGS 2100:0026 Project 2 By: Jacqueline Gabel. Publically Traded Computer Hard/Software Companies Jack Henry & Associates Latronix Gateway.
1 SPIRIT Replacement Project April 15th, SPIRIT Replacement Overview SPIRIT, the domestic theatrical sales, distribution and revenue collection.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
GS CERN GS Department CH-1211 Genève 23 Switzerland CSC for Service Owners How to use the CERN Service Catalogue maintenance tool.
STREAMLINING STORM WATER PERMIT IMPLEMENTATION THROUGH USE OF AN INFORMATION MANAGEMENT SYSTEM April 8, 2004 Presented by John W. Hart 30 th Environmental.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Slide 1 Software Construction Software Construction Lecture 3.
How Can the Federal Electronics Challenge (FEC) Help You? Federal Environmental Symposium June 5, 2007 Cate Berard U.S. Environmental Protection Agency.
Computer Technology: Your Need to Know Chapter 1 Slide 1.
Cut down on the time it takes employees to process invoices using Square 9’s SmartSearch integration with Microsoft Dynamics GP. SmartSearch allows invoice.
COTS Software Licensing REQUIREMENTS QUESTIONS JULY 2015.
«My future profession»
Mobile Software Solutions
Business Recycle Plans and Hauler Tracking System
Civil Rights & Labor SiteManager
Systems Analysis and Design 5th Edition Chapter 8. Architecture Design
General Services Department
BILLING AND COLLECTIONS
Presentation transcript:

AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys August 16–20, 2010

There were There were two surveys conducted by the Computers & Technology Section over the past year. Construction Cost Containment Identify the programmatic approaches used by different agencies to address construction cost containment. Construction Document Management Systems Identify the digital data storage systems different agencies use to document construction project activities. Construction Cost Containment Identify the programmatic approaches used by different agencies to address construction cost containment. Construction Document Management Systems Identify the digital data storage systems different agencies use to document construction project activities.

Construction Cost Containment

Which of the following alternate bidding measures has your agency recently implemented? Construction Cost Containment

Has offering bid alternates influenced the unit cost of the items bid? Construction Cost Containment

Two different methods were noted by several agencies: If Yes, how was this quantified and monitored? Has offering bid alternates influenced the unit cost of the items bid? Contractors were required to bid both alternates which allowed for comparison Contractors bid prices were compared to historical bid prices Construction Cost Containment

Which of the following standardized elements/features has your agency recently implemented? Construction Cost Containment

If you answered Yes to Options A or C in the previous question, please list the various Bridge Structure Elements and/or Pavement Typical Section Types. Construction Cost Containment

List any other design initiatives implemented to contain costs, for example Practical Design. Include details on how these efforts were quantified and monitored. There were a total of 22 responses to this question. Construction Cost Containment 7 agencies noted Practical Design 7 agencies noted Value Engineering Additional initiatives noted by various agencies Change order review for plan errors and omissions Allow short term road closures instead of detour construction Incentive for use of recycled pavement Implemented steel price indexing Construction cost oversight and tracking Balanced lettings / dividing mega contracts into smaller ones

Which of the following bidding procedures/measures has your agency recently implemented? Construction Cost Containment

If you answered Yes to any items in the previous question, please provide details as to how the efforts were quantified and monitored. Electronic bidding produced the following cost savings There were a total of 9 responses to this question. Construction Cost Containment Reduction or elimination of printing and mailing cost Reduction of man hours to produce paper documents Increased number of bidders which produced increased competition

Construction Document Management Systems

Please identify activities where electronic construction document management systems are used regularly in your state to capture information:

Construction Document Management Systems To what extent do your document management systems interface with construction management systems such as Trns-port (SiteManager), Field Automated Communication System (FACS), etc.?:

Construction Document Management Systems Please identify any external hardware that supports your construction document management systems? Please identify any external hardware that supports your construction document management systems?

Construction Document Management Systems What experience have you had with the use of external hardware that supports your systems? Most states use laptops for their systems Several states use camera and hand-held devices as well Several states reported IT support issues related to increased workload Several states reported network connection issues related to increased data transfer

Construction Document Management Systems Does your State own the document management software, or are there licensing agreements with proprietary software companies?

Construction Document Management Systems What is your experience with the use of consultant construction management firms that provide document management services? Several states are successful with consultant software Several states mentioned issues related to: Additional cost for customization Continuity issues due to using different firms from one project to another project Proprietary issues have limited use of date Some states develop their own software to address issues listed above

Construction Document Management Systems What types of software are used for your systems?

Construction Document Management Systems Are your document management systems web based?

Construction Document Management Systems What are your experiences with maintenance and/or upgrades of the document management system? Several states mentioned that maintenance is not a major issues and occurs as needed Several states mentioned that upgrades are: Costly Labor intensive Time consuming Some states develop their own software to address issues listed above Required to address the ever changing needs of the end user

Construction Document Management Systems Please identify any external (non-DOT) reporting systems that your document management systems link to:

Construction Document Management Systems Does your agency provide specific training on the use of your systems?

Construction Document Management Systems Has your agency experienced any proprietary / legal issues related the use of document management system software?

Construction Document Management Systems Does your agency allow/use digital signing of documents?

Construction Document Management Systems Please identify any project stakeholders that have access to your document management systems.

Construction Document Management Systems Does your agency allow local jurisdictions to use your document management software for their construction project management needs?