Douglas P. Carstens Chatten-Brown & Carstens LLP, Hermosa Beach L EGAL A SPECTS OF C LIMATE C HANGE & U SING CEQA TO S UPPORT B ETTER P ROJECTS.

Slides:



Advertisements
Similar presentations
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
Advertisements

Item #16 California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital.
Urban Sprawl and GHG Pollution—SB 375 NCEL Presentation Kip Lipper-CA Senate September 8, 2008 Portland, OR.
Meeting the Letter and Spirit of the Law: Legal Components of Comprehensive Plans.
PROYECTO NEREIDAS VISIÓN EUROPEA DE LOS PROYECTOS TEN-T ALEXIO PICCO – CIRCLE Malaga 03/04/2014.
Citrus County Planning Division Evaluation and Appraisal Report Citrus County Comprehensive Plan.
LAQM.PG(S)(09) – new biomass guidance. PG(S)(09) published in February Reflects changes since PG(S)(03) 2003: - biomass burning not a significant issue.
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
California Environmental Quality Act (CEQA)
Planning & Community Development Department Municipal Code Amendments: Adoption/Certification Authority of California Environmental Quality Act Reviews,
SEEA as a framework for assessing policy responses to climate change Prepared for the IAOS conference Sjoerd Schenau and Roel Delahaye Statistics Netherlands.
The Legal Implications of Sea Level Rise Erin Crisman-Glass Attorney at Law The Washington Climate Change Impacts Assessment Conference Conference Presentation:
Planning Issues in Agriculture Laws and Regulations Lecture 6 Lecture 6.
Local Planning Process The General Plan SB 18 Training Program.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Community Development Department DEVELOPMENTS OF REGIONAL IMPACT (DRIs) Summary.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
California's Global Warming Act Presented by: Jila Priebe Statewide Transit Planning & Research Branch Division of Mass Transportation California Department.
LAND USE, PLANNING, ZONING, AND ENVIRONMENTAL HAZARDS
How 1041 Regulations are Impacting Geothermal Development A discussion of how counties are applying 1041 regulations to geothermal development and the.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
La Center, Washington: Balancing Pipelines and Populations 1.
Presented By: Lori D. Ballance Gatzke Dillon & Ballance LLP Prepared For:Assn. of California Airports 2013 Fall Conference.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
Climate Action Plans and CEQA Charlotte Strem Assistant Director, Physical and Environmental Planning University of California Office of the President.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
WEST BERKELEY PROJECT Master Use Permits (MUP) May 15, 2012 Response to Concerns & Issues.
April 9, 2011 Mike Wieszchowski, P.E., PTOE Professional Traffic Operations Engineer Road Use Planning Guidelines to Protect Your Roadways.
California Measure SB375: Linking Greenhouse Gas Emissions Reductions to Metropolitan Transportation Planning Presentation to the National Capital Region.
1 EPA’s Climate Change Strategy Robert J. Meyers Principal Deputy Assistant Administrator U.S. EPA, Office of Air and Radiation December 3, 2007.
SERVICE TO UNINCORPORATED COMMUNITIES GOVERNMENT CODE SECTION SERVICE TO UNINCORPORATED COMMUNITIES GOVERNMENT CODE SECTION August 30, 2007.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
1 Proposed amendments to the National Environmental Management Act, 1998 (NEMA) October 2007 Presentation by Joanne Yawitch DDG EQP.
The California Environmental Quality Act and Greenhouse Gas Emissions SB97 and the Proposed Amendments to the State CEQA Guidelines on Analyzing Greenhouse.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Georgia Climate Change Summit antruth Al Gore: an inconvenient truth IPCC: 4th Assessment Report 2007 Nobel Peace Prize.
Sustainable Communities Strategies 101: An Introduction to California’s New Planning Law SCANPH conference October 1, 2010.
Effects Analysis and Comparison. Objectives Accurately determine which impacts need to be evaluated in the land use plan. Develop a matrix comparing the.
Department of Transportation City Council August 31, 2015 Annual Self Certification Congestion Management Program for Los Angeles County.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Water Supply Planning A Legal Overview Edward J. Casey Weston Benshoof Rochefort Rubalcava & MacCuish 333 South Hope Street, 16 th Floor Los Angeles, California.
CEQA and Climate Change Evaluating & Addressing GHG Emissions from Projects Barbara Lee, CAPCOA.
Implications of the Newhall Ranch Decision for Climate Change Analyses
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
Bay Area Air Quality Management District CEQA Air Quality Guidelines September 2, 2010 Bay Area Air Quality Management District CEQA Air Quality Guidelines.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
1 EIS CONTENT & USE: ROBERTSON v METHOW VALLEY CITIZENS COUNCIL (207) FACTS  CHALLENGE TO ADEQUACY OF EIS FOR FOREST SERVICE PERMITS FOR SKI RESORT ON.
1 “Fair Argument” Test Triggering EIR: Friends of “B” Street v City of Hayward Facts & Issue Trial court: city abused discretion in adopting negative declaration.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Central Valley Flood Protection Plan Senate Bill 5 Amendments
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Introduction to the California Environmental Quality Act (CEQA)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
GREENHOUSE GAS EMISSIONS INVENTORY
Facebook Campus Expansion Project EIR
SEEA as a framework for assessing policy responses to climate change
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
Nick Bonvoisin Secretary to the Convention on the
Tajiguas Resource Recovery Project Doing More with Our Waste
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Brackish Water Desalination Project Draft EIR
Proposed CEQA Guidelines
Effective Off-Site Air Quality Mitigation
Off Site Mitigation Measures under CEQA
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Douglas P. Carstens Chatten-Brown & Carstens LLP, Hermosa Beach L EGAL A SPECTS OF C LIMATE C HANGE & U SING CEQA TO S UPPORT B ETTER P ROJECTS

2

3 CEQA requires a close look at alternatives and mitigation that can reduce greenhouse gas pollution and the risk of climate change.

By enacting SB 97 in 2007, California’s lawmakers expressly recognized the need to analyze greenhouse gas emissions as a part of the CEQA process. Amendments to the CEQA Guidelines were adopted that clarified several points: * Lead agencies must analyze the greenhouse gas emissions of proposed projects, and must reach a conclusion regarding the significance of those emissions. (See CEQA Guidelines § ) * When a project’s greenhouse gas emissions may be significant, lead agencies must consider a range of potential mitigation measures to reduce those emissions. (See CEQA Guidelines § (c).) * Lead agencies must analyze potentially significant impacts associated with placing projects in hazardous locations, including locations potentially affected by climate change. (See CEQA Guidelines § (a).) (?) * Lead agencies may significantly streamline the analysis of greenhouse gases on a project level by using a programmatic greenhouse gas emissions reduction plan meeting certain criteria. (See CEQA Guidelines § (b).) * CEQA mandates analysis of a proposed project’s potential energy use (including transportation-related energy), sources of energy supply, and ways to reduce energy demand, including through the use of efficient transportation alternatives. (See CEQA Guidelines, Appendix F.) 4

* Chevron applied for the necessary permits to construct a project that would replace manufacturing facilities at its refinery. * At first, the EIR refused to even acknowledge the environmental significance of greenhouse gas emissions and the effect of those emissions on global warming. * After numerous objections, the EIR acknowledged "that the Proposed Project's estimated new emissions of 898,000 metric tons per year of GHGs [greenhouse gases] prior to mitigation would most likely be a significant effect on the environment." Communities for a Better Environment v. City of Richmond (2010) 5

6 * However, the EIR provided only a perfunctory list of possible measures to mitigate the Project's significant contribution to greenhouse gas emissions and deferred identification of these measures until after the CEQA process. * Since the EIR merely proposed a generalized goal of no net increase in greenhouse gas emissions and then set out a handful of cursorily described mitigation measures for future consideration that might serve to mitigate the 898,000 tons of emissions resulting from the project, the court found the mitigation plan for greenhouse gases to be deficient. * The court stated, "the novelty of greenhouse gas mitigation measures is one of the most important reasons that mitigation measures timely be set forth, that environmental information be complete and relevant, and that environmental decisions be made in an accountable arena.”

7 Some recent case law has delivered setbacks to climate adaptation by restricting the ability of public agencies to consider future conditions related to climate change such as sea level rise and flooding.

* Project was a mixed-use real estate development in the Playa Vista area of Los Angeles. * CEQA states, “The purpose of an environmental impact report is to identify the significant effects on the environment of a project....” * Environmental groups claimed the EIR failed to address the impacts of sea level rise resulting from global climate change. Ballona Wetlands Land Trust v. City of Los Angeles (2011) 8

9 * The court said the purpose of an EIR is to identify the significant effects of a project on the environment, not the significant effects of the environment on the project. * The Court explained, “identifying the effects on the project and its users of locating the project in particular environmental setting is neither consistent with CEQA’s legislative purpose nor required by the CEQA statutes.” * The Court concluded that EIR’s are not required to discuss the impact of sea level rise on the project.

* This case involved a challenge to the County of Madera’s approval of a mixed-use development project. * When a project exceeds a water demand threshold, CEQA requires compliance with certain provisions of the Water Code. * Water Code section requires an agency considering a project to obtain a written assessment of water supply and demand. * This assessment must be included in the EIR. Madera Oversight Coalition, Inc. v. County of Madera (2011) 10

11 * An EIR for a land use project must address the impacts of likely future water sources, and the EIR's discussion must include a reasoned analysis of the circumstances affecting the likelihood of the water's availability. * Under the 2007 California Supreme Court case Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova, where it is impossible to confidently determine that anticipated future water sources will be available, CEQA requires some discussion of possible replacement sources or alternatives, and of the environmental consequences of those contingencies. * The Madera Oversight Coalition court concluded that the nondisclosure of information concerning uncertainties surrounding the project's source of water resulted in the EIR’s discussion of the water supply being inadequate.

* The City of Santee certified an environmental impact report for a residential development project, which included a water supply assessment. * The project was located in a declared high fire hazard zone and the project site has burned many times in the past and it is expected to burn again in the future. Preserve Wild Santee v. City of Santee (2012) 12

13 The Court concluded the EIR’s analysis of water supply was inadequate because of 1) the large discrepancy between the EIR's estimation of the project's water demands and the assessment's estimation of the project's water demands; 2) the EIR failed to adequately analyze this discrepancy; and 3) the EIR did not discuss the uncertainty as to the project’s stated receipt of water.

14 * The EIR also concluded the project's fire safety impacts were less than significant because the developer prepared a fire protection plan, which included building structures with fire resistant materials, creating landscaping zones around structures, and managing the amount of potential fuel in open space areas with prescribed burns or goat grazing. * However, when the City approved the project, it did not adopt the open space fuel management portion of the fire plan, and thus the court concluded there was insufficient evidence to support the EIR's conclusion the project did not have significant fire safety impacts.