Construction Project Management: Technology driven answers for schedule and budget savings.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Building Information Management (BIM)
BIM: Beyond Clash Detection BIM: BEYOND CLASH DETECTIO N A Jobsite Level Perspective THE BIG PICTURE DESIGN & DETAILING INSTALLATION PLANNING TRACKING.
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
BIM EXECUTION PLANNING PROCESS
What Constitutes a Quality Commissioning Job?. Agenda Preconstruction Services –Brian Toevs, PE Construction Services –Rusty Ross, PE, LEED TM, CxA Client.
06/06/07 – 07/11/07 BIM Building Information Modeling.
BIM Management – A Strategic Approach
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Facilities and Construction: Did you know your GPO can help?
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Introduction to BIM BIM Curriculum 01.
Emerging Trends in Electronic Design and Construction April 2013.
BIM Overview Stacy Scopano. AEC is a fragmented industry.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Northside Residence Hall Texas A&M University College Station, Texas Project No Proposal For CMAR Services for.
RECORD SET DELIVERABLE REQUIREMENTS SMOOTH SAILING.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Formats ACT 380.
WE EXIST TO BUILD GREAT THINGS DPR Construction UCSF Mission Bay Pre-fabrication Effort Presentation for Panelized Systems UCSF Medical Center at Mission.
Wilsdorf Hall Materials Science Engineering & Nanotechnology Building University of Virginia Leaha Martynuska Construction Management Option Senior Thesis.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Project Execution Planning for Building Information Modeling Progress Meeting #2 – July 29 th, 2008 A buildingSMART Alliance project sponsored by: The.
Palomar West Medical Center Segmental Review Brett W. Beekman, S.E. Senior Structural Engineer, Southern California.
© 2012 Autodesk Autodesk Structural Curriculum 2013 Unit 5: Advanced Structural Analysis & Coordination Advanced Structural Analysis & Coordination.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Palomar Medical Center West: Segmented Review Process.
CAD SERVICES BIM/3-D MODELING. SUN MECHANICAL’S VIRTUAL DESIGN CONSTRUCTION STAFF HAS THE SOFTWARE AND EXPERTISE TO INTEGRATE 3-D CAD FILES AND GENERATE.
Thesis Research Proposal Aimee Bashore Franklin & Marshall College Row Lancaster, PA.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks Initial Selection of Building Industry Sectors.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
BIM & FM in Hong Kong Public Rental Housing Projects.
1Archer Mechanical. Archer Mechanical is dedicated to providing solutions that save you both time and money. Specializing in sustainable mechanical and.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
Introduction to Energy Efficient Design
DESIGN TOOLS UPDATE.
Design – BIM – Build – Operate
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
BIM EXECUTION PLANNING PROCESS
EXTRA SLIDES.
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Project Execution Planning for Building Information Modeling
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Light Gauge Steel Frame
BIM EXECUTION PLANNING PROCESS
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
DBIA Manual of Practice
Presentation transcript:

Construction Project Management: Technology driven answers for schedule and budget savings

OR How to take advantage of BIM

Peter Campot President, Berry, a division of Suffolk Kurt Rockstroh, AIA, ACHA President/CEO, Steffian Bradley Architects Stanley Hunter Project Executive, Baystate Medical Center Hospital of the Future

Baystate Medical Center 638,000 SF clinical facility in Springfield, Massachusetts New cardiac and vascular center with inpatient beds Project is predominantly new construction with tie-ins to existing buildings.

Baystate Medical Center 55% complete Completion date: October 1, 2011

Project Timeline 2005: Master Plan design started by SBA 2006:Owner/Architect meet and decide not to draw in 3D because of the lack of robust MEP programs 2007:DON Submitted/Berry is onboard 2008: Start of construction - ongoing 2009:March 2009 model started November 2009 model completed Revisited 3D drawing concept and advantages of BIM Timing and scale of project was the perfect opportunity to start 3D

Baystate video slide is here

How has the use of BIM benefitted the Baystate project?

BIM Benefits: Logistics & Scheduling 2D Logistics for Masonry Elevation for Masonry

Foundations slide is here

BIM Benefits: Equipment Coordination Side view of AHU Door Conflict

BIM Benefits: Equipment Prefabrication Piping assembly for AHU

BIM Benefits: Riser Prefab 80’ length pipe Shop drawing 80’ length pipe

BIM Benefits: MEP Coordination Hanger coordination drawing Hangars in place

BIM Benefits: Mock Up and User Coordination Section of OR Ceiling space before equipment selected

BIM Benefits

Avoiding the Mad Rush

Owner’s Viewpoint Coordination Phase –Concurrent coordination by trades instead of sequential –Estimated time savings of 2-3 months in coordination Clash Detection –Sped process to identify, communicate and resolve conflicts –Multiple trades coordinate simultaneously while checking conflicts between each other –CM’s engineer stronger role in coordination between trades Early installation –Expedited hanger and core installation using GPS systems along with BIM Increased off-site fabrication –Pre-fabrication mechanical risers, PRV stations, HVAC and Plumbing mains, HW and Steam piping configurations Allowed “no-fly” zones for coordination to maintain space for: –Access points for maintenance –Equipment requirements in development, such as unistrut for booms and lifts

Items We Are Working On BIM Integration with Operations & Maintenance programs –Space management database –Preventative Maintenance program –Life Safety survey for JCAHO O&M Manual incorporated into BIM –Live as-builts incorporating submittals and as-builts into model as we go Inclusion of site photos into BIM before closing walls –Provides in-wall details for future renovations & fit-outs Standard Specification for future projects Model ready for design process on next phases of fit-out –Facilitate communication between designers and CM team in pre-construction Estimating, Options development and Scheduling –Increase sped, accuracy for cost estimates and take-offs –Quantify and model potential options and changes more accurately and quickly –Scheduling using BIM

Lessons Learned Software –Compatibility –Conversion and input of files between software used by design, CM and Owner –Which software will become industry standard? Major Fixed Clinical Equipment –Import of BIM model of major fixed clinical equipment would expedite coordination between equipment, structure and MEPs –Generally this information is not currently available Knowledge –Varied level of use by design professionals and sub-contractors Engaged Participants –We have had several brainstorming sessions on the capabilities and goals - people are engaged and willing to try ideas

Taking advantage of 6D

Proposed 6D Solution 1. Revit Model that includes the following: Architecturals that include all revisions Structurals that include all revisions MEP drawings that include all revisions Curtainwall system including all u-values used for energy analysis Room, door and finish schedules 2. Navisworks 3D Model All major equipment tagged with the following data: a) Submittals b) O&M Manuals c) Commissioning sheet for each piece of equipment

Proposed 6D Solution 3. Traditional 2D as-built drawings 4. Complete electronic record that includes all project correspondence and communication including the following: All submittals All shop drawings All warranties All drawings

Tagging Example

Q & A