Commissioning and Data Collection David Johnson Accelerator Physics Center Proton Source Department Meeting June, 23, 2011.

Slides:



Advertisements
Similar presentations
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
Advertisements

Linac Laser Notcher David Johnson, Todd Johnson, Matt Gardner, Kevin Duel April PMG Meeting April 2, 2015.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Ultra-sensitive HALO monitor N. Vinogradov, A. Dychkant, P. Piot.
Planar scintigraphy produces two-dimensional images of three dimensional objects. It is handicapped by the superposition of active and nonactive layers.
ALPHA Storage Ring Indiana University Xiaoying Pang.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
experimental platform
David Johnson –APC -.  The Proton Improvement Plan is tasked with Booster upgrades which will increase the Booster throughput required for future operation.
Linac Laser Notcher Status David Johnson and Todd Johnson PIP Meeting October 10, 2012 Beams doc 4237.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Project X RD&D Plan Instrumentation Manfred Wendt AAC Meeting February 3, 2009.
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Laser Notching Demonstration Experiment (Preliminary Results) David Johnson, Todd Johnson, Matt Gardner, Vic Scarpine, Rick Tesarek.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
NMLTA Protection System Update -Loss Monitors- Arden Warner October 13 th, 2010 Arden Warner, FNAL.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Development of the beam loss monitor for beam halo measurement in the J-PARC RCS Masahiro Yoshimoto *, Hiroyuki Harada, Shinidhi Kato, Kota Okabe, Michikazu.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
K. Matsuoka (Kyoto Univ.) for T2K muon monitor group
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
David Johnson Jinhao Ruan, Jamie Santucci, Vic Scarpine, Ray Tomlin Presentation to PIP November 16, 2011.
D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
B. Azadegan, S. A. Mahdipour Hakim Sabzevari University
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
Beam Profile Monitor for Spot-Scanning System Yoshimasa YUASA.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
High intensity electron beam and infrastructure Paolo Valente * INFN Roma * On behalf of the BTF and LINAC staff.
Beam Commissioning Adam Bartnik.
Alexander Aleksandrov Spallation Neutron Source Oak Ridge, USA
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Positron production rate vs incident electron beam energy for a tungsten target
E-beam scanner experience at FNAL
Auxiliary Positron Source
ILCDR08 10 July 2008 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK)
Controls CBETA controls will extend existing EPICS control system
PAN-2013: Radiation detectors
The Pixel Hybrid Photon Detectors of the LHCb RICH
Department of Physics and Astronomy,
Electron cloud studies at CESR
Variable distance from beam.
Linac Diagnostics Commissioning Experience
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
Presentation transcript:

Commissioning and Data Collection David Johnson Accelerator Physics Center Proton Source Department Meeting June, 23, 2011

 Concept  Linac Installation  Profile Examples  Hardware Issues  Optimization  Conclusions 2

 David Johnson (APC/HINS) group leader  Jim Zagel (AD/I) electronics and integration support  Carl Lundberg (AD/I) electronics and mechanical support  Dave Slimmer (AD/I) software support responsible for LabView  Jim Galloway (AD/I) electronics and mechanical support  Ray Tomlin (AD/PS) laser support guru  Vic Scarpine (AD/I) responsible for HINS LPM design and installation  Manfred Wendt (AD/I) provided button BPM's, and Inst. Dept. support  Kevin Duel (AD/MS) mechanical engineer for chamber construction and installation  Hogan Nguyen (PPD/SiDet) provided scintillator and PMT for electron detector  Vladimir Kashkin (TD) designed electron separation magnet  Peter Prieto (AD/I) Timing board design  Glenn Johnson (AD/I) timing board layout  Wayne Schmitt (AD/Safety) help with radiation measurements  Mark Lebrun (AD/MS co-op) radiation shielding design  Booster Department (particularly Todd and Kent) 3

 Utilize photons from Nd:YAG laser ( = 1064 nm) to photodetatch the outer electron from the H- ions creating neutral H0 atoms and free electrons.  Photodetachment cross section (for Nd:YAG) is ~3.8E-17 cm2  Fraction neutralized where F is photon flux and  is the crossing time  For a 50 mJ 10 ns laser pulse with an average laser size of 200 um, we neutralize about 92 % of the H- passing through the laser.  The liberated electrons are swept into electron detector by weak magnetic field.  With a laser beam diameter << H- beam, we can scan the laser across the H- beam and collect the electrons at each position of the scan thus giving us a density profile of the H- beam.  For typical source currents of ~ 35mA -> 200 MHz bunch intensities of ~1E9 with a bunch separation of ~5 ns. For a laser pulse duration of ~10 ns we impact only a single bunch each linac cycle. 4

launch box optics box laser transport vacuum chamber chute Q8 Mirror boxes 5

viewports (laser beam dump not shown) electron detector port button BPM optics box H- beam electron magnet 6

7

 Scan limits determined by size of laser dump viewport  +/- 33mm/264mm-> 125mr  +/ o optical (+/3.58 o mechanical)  Beam center -> +/-20 mm scan limits  Mask at input viewport limits laser excursion to prevent launching laser up or downstream in vacuum chamber  Cambridge Technology scanner  +/- 1 degree/volt -> input voltage of 3.58V  Repeatability 8 microradians Optics Box 3” beam pipe Electron magnet pole tips 1 3/4 ” beam pipe Not to scale Viewport: AR coated 2.69”dia Anodized MASK Max angle +/- 6 o Anodized laser dump w/PD Mirror box 8

9

YM1 LM1 LM2 LM1 LM2 CM1 A1 A2 10

Peak dipole field ~ 175 Gauss Integrated dipole field ~ +/- 70 G-m from each half of the magnet, Net integrated dipole ~ 0.61 G-m. Results in a displacement of ~0.4 mm and angle of ~19 ur. 11

 Electron energy 218 keV  Optical detection  Scintillator (polystyerene doped with N-Methyl-chloride) 3” diameter 1” thick with 100A aluminized coating on vacuum side and walls  Electron detection nearly 100%  25 ns dopant decay time  Scintillator made at FNAL  Photomultiplier Tube (Hamamatsu stage)  Currently using an 8 bit 1 Gs/sADC scope card in LPM computer to monitor PMT voltage into 50 ohms. 12

 See motion on downstream BPM’s. Peak distortion is seen at VPQ15 of something less than 2 mm and ~0.7 mm at VPFOIL. (This is well within the long term drift/tuning of injection positions)  NO impact on losses of injection efficiency is seen.  Orbit distortion at injection can be compensated (if desired by -0.5 amp on VTQ8) 13

PMT high voltage on/magnet offTurn on magnet (with PMT on) Move laser timing inside the beam pulse 14

15

16

17

Multiwire Data taken March 23, 2011 $1D 11 4E12 LPM profile taken on June 8, 2011 On $14 cycle (single bunch) 18

19

Scan range -18 to 18 mm PMT HV 700 V Small peak area ~ 2.3% of Main bunch Bunch intensity ~1E9 72 data points across scan 10 beam samples/data point Is this real beam or reflection? 20

Increase PMT voltage to 1 kV 21

 Laser power supply damaged by radiation  Moved power supply up stairs  Scanning galvanometers issues  Optical position feedback loop maxed out voltage  Suspect darkened led – working with vendor  Order new galvanometers  Axis select galvanometer issues  Not meant to operate in vertical orientation  Looking for suitable alternative 22

 Currently we are using laser at full energy to get a 10 ns laser pulse. This limits the PMT high voltage due to the limited dynamic range of the ADC.  We need to further optimize the laser energy/timing, PMT high voltage, and better understand the PMT signal and ADC.  Data analysis is just starting… 23

 The BLPM can parasitically and nondestructively measure transverse profiles of beam in the 400 MeV line.  Single (up to a few) bunch measurements possible at any selectable position within the bunch train.  The system is very sensitive and can be used to measure and characterize halo.  Data analysis and optimization just starting.  Lessons learned to be applied to future systems for HINS and Project X 24