1 July 12, 2006/10a Fire Emissions Tracking System White Paper Fire Emissions Joint Forum July 11-12, 2006 Portland, OR Dave Randall, Air Sciences Inc.

Slides:



Advertisements
Similar presentations
WRAP Technical Support System for Air Quality Planning, Tracking, & Decision Support Tom Moore | Shawn McClure Western Regional Air Partnership | Cooperative.
Advertisements

Phase 1 – 2002 Fire Emissions Inventory FEJF Meeting September 8 – 9, 2004 Worley, ID – Coeur D’Alene Casino Resort Hotel Dave Randall ( x221;
1 WRAP Fire Emissions Tracking System for Air Quality Planning, Tracking, & Decision Support December 6, 2007 Tom Moore | Shawn McClure | Dave Randall.
Attribution of Haze Workgroup & Technical Support System Report Fire Emissions Joint Forum Meeting July
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Technical Support System Review / / RPO Monitoring/Data Analysis Workgroup Conference.
WRAP Technical Support System for Air Quality Planning, Tracking, & Decision Support Tom Moore, Western Regional Air Partnership, Western Governor’s Association.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Technical Support System Review Board Meeting March 8, 2007.
Fundamentals of Information Systems, Second Edition
Shawn McClure Software Engineer CIRA, Colorado State University Projects: Visibility Information Exchange Web.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Lecture Nine Database Planning, Design, and Administration
WRAP Technical Support System Project Update AoH Call October 19, 2005.
Learning with a Purpose: Learning Management Systems Patti Holub, Director District Initiatives and Special Projects Miguel Guhlin, Director Instructional.
Western Regional Air Partnership Emissions Database Management System January 2004 WRAP Technical Summit Phoenix, Arizona E.H. Pechan & Associates, Inc.
Western Regional Air Partnership Emissions Database Management System Presentation to Fire Emissions Joint Forum Las Vegas, Nevada December 09, 2004 E.H.
WRAP Fire Emissions Tracking System Project Update, Outline, and Timeline WRAP - Fire Emissions Joint Forum Meeting San Diego, CA 22 February p.
MSF Requirements Envisioning Phase Planning Phase.
PHASE II PROJECT Day 1 – 3:15p PHASE II PROJECT -- Ag Burning – Integration of QC responses -- NIF Format -- Plume Characteristics Update -- Next Steps.
1 WRAP Fire Tracking Systems Draft Intent of WRAP FTS Policy – Assist states/tribes to address emissions inventory and tracking associated with fire in.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
Fire Emissions Joint Forum –Section 308 Strategies for Fire Coordinating efforts of states changing or developing smoke management strategies for regional.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Unit 8b Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
November 7, 2013 WRAP Membership Meeting Denver, CO Tom Moore WRAP Air Quality Program Manager WESTAR Council.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
WRAP/FEJF Phase III/IV Emissions Inventory Project WRAP - Fire Emissions Joint Forum Meeting San Diego, CA 22 February a – Presentation (a)
PHASE II PROJECT Day 1 – 1:15p PHASE II PROJECT -- Technical Refinements Large Fires Complex Identification Duplicates -- WF and Rx Fire QC Packets States,
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
1 Fire Emissions Joint Forum: Section 309 Requirements Continued… -Enhanced Smoke Management Programs -Annual Emission Goals for Fire -Fire Tracking Systems.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
REGIONAL COORDINATION GUIDANCE DOCUMENT Status Report Debra Wolfe November 30, 2005 WRAP FEJF Meeting Seattle, WA.
November 2, 2005San Diego, California1 Calculation Tool for Estimating Projected Emissions - Methods Roll Out – (Day 2 – ) Phase III/IV Project.
12/14/20151 Fire Emissions Tracking System Development & Implementation Workshop on Regional Emissions & Air Quality Modeling Studies Biogenics, Ammonia,
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
September 28, 2005Ph III/IV Project Team1 Phase III/IV Planning EIs Update and Status Report.
1 UPDATE ON EMISSION REDUCTION TECHNIQUES FOR AGRICULTURAL BURNING AND WILDLAND FIRE - ANNOTATED BIBLIOGRAPHY AND SUMMARY TABLE JUNE 3 - 4, 2003 MACTEC.
TSS Database Inventory. CIRA has… Received and imported the 2002 and 2018 modeling data Decided to initially store only IMPROVE site-specific data Decided.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
1 Evaluation of Existing Fire Tracking Systems FEJF Meeting Day 1, 1030a – Albuquerque, NM.
Overview of WRAP FEJF Work Products WRAP Workshop on Fire, Carbon, and Dust May 23-24, 2006 Sacramento, CA Darla Potter (WDEQ) & Mark Fitch (USFS)
1/13/20161 FETS: State of the System Providers, Features, Lessons Learned August 31, 2009 FETS Project Meeting Boise, ID.
1 Incorporating Smoke Management Plans into SIPs: THE OREGON 309 SIP Brian Finneran Oregon Department of Environmental Quality Smoke Management Planning.
Fire Emissions Joint Forum Technical & Policy Products Overview June 16, 2004 Portland, OR.
309/308 Technical & Policy Overview Fire Emissions Joint Forum March 10-11, 2004 San Diego, CA.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Application of Fuel Characteristic Classification System to Ph II EI (add-on task to Inter RPO project) Fire Emissions Joint Forum Meeting Spokane, WA.
WRAP Activities Overview §308 Technical Work Outline June 3, 2003.
Evaluation of Existing Fire Tracking Systems FEJF Meeting Day 1, 945a – Seattle, WA.
Key Findings from May & July 2008 WRAP Technical Workshops September 30, 2008 Steve Arnold, Colorado DPHE & Bob Kotchenruther, EPA R10 (Co-Chairs, WRAP.
WRAP WORK PLAN UPDATE NOVEMBER 2001 Submitted to WRAP Board for Approval Andy Ginsburg ODEQ, Co-Chair IOC Forum Mike George ADEQ, Co-Chair TOC Forum.
Introduction to FFI: Why and how FFI was developed Introduction to FFI: Why and how FFI was developed 04/02/2013.
TSS Scoping Study Results AoH Meeting – Tempe, AZ November 16/17, 2005.
Fundamentals of Information Systems, Sixth Edition
Current and Future State of the IMPROVE Website
WRAP Regional Haze Progress Report & FEJF Projects/Budget
Training Session Fire Emissions Tracking System
Annual Emission Goals for Fire
Western Regional Air Partnership Fire Emissions Tracking System
Project Management Chapter 11.
Phase 1 – 2002 Fire Emissions Inventory
July 11, 2006 / 3p Phase IV Projection Emission Inventories
Reportnet 3.0 Database Feasibility Study – Approach
E.H. Pechan & Associates, Inc.
Fire Emissions Joint Forum February 9, 2005
Presentation transcript:

1 July 12, 2006/10a Fire Emissions Tracking System White Paper Fire Emissions Joint Forum July 11-12, 2006 Portland, OR Dave Randall, Air Sciences Inc.

2 Presentation Objectives To bring the FEJF up-to-speed with the FTS Task Team on the current thinking re: the development of the WRAP’s FETS. For the FEJF to reach consensus on the direction the FTS Task Team will take to develop the WRAP’s FETS.

3 Presentation Outline ID Purpose & Objectives of FETS Review FTS Evaluation & Conclusions Recommendations – Approach to Develop FETS –Contractual Relationship (Air Sciences/CIRA) –Preliminary Scope –Cost Estimate –Schedule

4 Purpose of WRAP FETS Regional Haze Rule (Rule) Requirements: –309 states – FETS is part of the GCVTC recommendations –308 states – FETS is likely an important tool for the effective management of fire sources: inventory fire location & type (natural or anthropogenic) calculate & inventory fire emissions data influences choices on planned burns

5 Objectives of WRAP FETS Consistently track fire activity & emissions Accommodate regional coordination Create fire emission inventories Apply Emission Reduction Techniques (ERT) Implement Annual Emission Goals (AEG) FETS data available to States/Tribes for Regional Haze planning

6 FTS Evaluation Project Cursory Overview Is there an existing FTS system that will satisfy WRAP’s FTS requirement? Review Web-based & historical systems Primary emphasis: real-time data import and export capabilities. Evaluation made from the perspective of an FTS user.

7 FTS Evaluation Goals Evaluate existing FTS and provide: –A feasibility assessment of existing systems. –An analysis of modifying each system to include WRAP needs. –Estimate resources needed to modify the system to meet the required elements for tracking prescribed fires.

8 ElementsDate of Burn Burn Location Area of Burn Fuel Type Pre-Burn Fuel Loading Type of Burn Nat/Anth Annual Emission Goal Info AEG (addl) Projections Emissions Emissions (addl) System Features Real time data import and export Web based Can info easily be shared between states GIS/mapping capabilities Conventional system language & design Important Characteristics Straightforward queries Straightforward reporting Important Elements for Regional Coordination Basic Elements of FTS Policy KEY FEATURES OF WRAP FTS

9 Table 1 – Feasibility Study Point System Data ElementsCritical Elements Evaluated Max Possible Points Task 2.A. Basic Data Elements Burn DateStart date; end date10 Burn LocationLatitude/longitude10 Burn AreaSize of burn (acres); fuel type10 Components related to Annual Emission Goals15 Emission Reduction TechniquesAny ERT element5 Bonus Ranking 5 Total for Basic Data Elements55 Task 2.B. System InformationWeb-based, exporting capabilities 15 Task 2.C. Back-End and Front-End Applications 10 Task 2.D. Indexing and Reporting 10 Task 2.E. Optional Modules 5 Task 2.F. Interface and/or Data Exchange 5 Total for System-Related Features45 Total Maximum Possible Score100

10 Table 2 - FTS Evaluations Data Elements Max Possible Points San Joaquin Valley Airshed Management System (MT/ID) Smoke Management Database (NM) Nez Perce Tracking System South Carolina Tracking System Florida Tracking System USDA Smoke Management System Task 2.A. Basic Data Elements Burn Date Burn Location Burn Area Components related to Annual Emission Goals Emission Reduction Techniques Bonus Ranking Total for Basic Data Elements Task 2.B. System Information Task 2.C. Back-End and Front-End Applications Task 2.D. Indexing and Reporting Task 2.E. Optional Modules Task 2.F. Interface and/or Data Exchange Total for System-Related Features Total Maximum Possible Score

11 Table 3 – WRAP FTS Requirements

12

13

14

15 Recommendations - Method Extended the Technical Modifications assessment to Post-Modification period. –By dedicating a estimated amount of labor, how would each FTS perform as the WRAP’s FTS? –Tabulated this assessment and used results to inform the Project Team’s recommendations.

16

17

18

19 Conclusions of FTS Evaluation What existing FTS would work best “as-is” for the WRAP’s FTS? MT/ID FTS –Currently functioning system –Supports burn managers in Montana & Idaho –Uses SQL Server database Meets the needs of the WRAP region Fully functional user interface

20 Conclusions of FTS Evaluation What existing FTS requires least amount of modification to work well as WRAP FTS? NM FTS –Upgrading Access database to SQL Server, NM FTS would be capable of meeting current & future WRAP needs –Estimated 120 labor hours to complete upgrade –Already supports limited emissions estimation (PM10) –Generates maps of burn locations –Unsupported features in existing MT/ID & USDA FTSs –Estimated 140 labor hours to implement features in NM FTS.

21 Conclusions of FTS Evaluation What is the best case scenario WRAP FTS (most features & capabilities)? Modified version of the MT/ID FTS –Advantage because it already uses SQL Server database. –Advantage because the preferred interactive GIS system is already being designed for the MT/ID FTS

22 Conclusions of FTS Evaluation What are the benefits of building the WRAP’ FETS from and existing FTS? –Each FTS already incorporates many of the essential features –Two systems will include preferred GIS –Time and money already spent: down- payment on building the WRAP’s FTS.

23 Conclusions of FTS Evaluation Is there an alternative way for the WRAP to proceed with building the WRAP FTS? Commodity-based FETS –NM/FEJF specifications on super-industrial system –Programming to make it look slick & contemporary Make an existing “Commodity” FTS Upgrade NM to be industrial strength database Host on existing e-commerce site (e.g., Yahoo!) Multi-users accommodated on a Web interface Export events to Google Earth for review and regional coordination

24 Benefits for WRAP of Developing Commodity-based FETS 1.The limited dollars in future WRAP grants and the effects on FEJF project funding 2.Lessons learned in the Fire EI preparation and analysis for haze planning purposes over the past several years 3.Plans to provide states and tribes ongoing regional technical support and data access for their haze plans 4.The timing needs for getting the FEJF FTS on-line and fully operational for states to be using for tracking and regional coordination, as well as to point to in their December 2007 haze SIPs.

25 Mechanical Description of WRAP’s FETS Mechanical Description of WRAP’s Fire Emissions Tracking System Planned RX Burn Raw Data Acquisition Data Entry & QC Requested Burn Data Acquisition, Data Entry & Regional Coordination Burn Decisions Emission Inventory Development & QC Pre-Burn Burn/Post-Burn

26 Mechanical Description of WRAP’s FETS need to mod/include pieces

27 Operable FETS Operable FETS will: –Provide real-time access to planned fire event data –Build comprehensive database of all wildland fire events Operable FETS will not: –Provide air quality bases for ad hoc decisions of ESMP –Include a module to estimate the air quality impacts due to emissions from fire events

28 Other Operations of the FETS Gather, compile, QC, query fire activity & emissions data for wildland fires. Planned fire data added to FETS real-time or in advance Data for unplanned events (wildfire) obtained after event using crawls FETS database will require QA/QC, but minimal “ground-up” data gathering Critical Challenge: SMP’s to optimize collection of accurate data for planned fire events

29 Recommendations: Approach Commodity-based development of FETS FETS attached to WRAP’s TSS Advantages: –FETS would be built to serve specific needs of WRAP states & tribes –Fire emission inventory work integrated into TSS –ESMPs can then integrate fire data into regional haze emissions, monitoring & modeling data –Integrating FETS into TSS will support development of regional haze SIPS

30 Preliminary Scope of Work Air Sciences –Technical & developmental lead for FETS project –ID other contractors possibly contributing to development of FETS –Work closely with Task Team assigned to project –Bring development issues to Task Team for guidance –Prepare periodic updates on project’s progress for FEJF –Work closely with Technical Director of WRAP, CIRA personnel involved in WRAP’s TSS & TSS team CIRA: provide technical & developmental oversight for project; integrate FETS into WRAP TSS

31 Tasks for FETS Project 1.Documentation –Detailed Workplan –Technical support (methods, assumptions, etc) –FETS users guide

32 Tasks for FETS Project 2.FETS Software Development: –Database architecture –Data retrieval & input –User interface –Data QC & security –Database functionality –Queries & exports for real-time use of fire data & reporting –Commodity-based mapping routines (Google Earth) –Data reporting –Data archiving & back-up

33 Tasks for FETS Project 3.FETS Technical Integration to TSS –Integrate fire emissions into emission summary tools –Annual Emission Goal demonstration tool –Support Regional Haze SIP content pertaining to fire emissions 4.FETS Support & Maintenance –QA/QC –Data archiving & retrieval –Data reports & export files for SIP and modeling apps –System repair

34 Hours & Cost Estimate Assumptions for preliminary estimates: –Average hourly rate for CIRA = $60/hour –Subcontractor hours would replace Air Sciences &/or CIRA hours –Hardware (if necessary), software licensing (if applicable), hosting costs: not included in current cost estimate –CIRA will charge $2,250 overhead fee (45% of the first $25,000 of Air Sciences labor billed through the subcontract.

35 Hours & Cost Estimate Project Development Cost: –Air Sciences - $120,000 (labor) –CIRA - $37,650 (labor + overhead) Annual Support/Maintenance Cost: –Air Sciences - $20,000/year

36 Hours & Cost Breakdown 1.Documentation Air Sciences – 250 hours/$30,000 CIRA – 40 hours/$2,400 2.FETS Software Development Air Sciences hours/$75,000 CIRA– 160 hours/$9,600 3.FETS Technical Integration to TSS Air Sciences hours/$15,000 CIRA– 240 hours/$14,400 4.FETS Support & Maintenance Air Sciences hours/$20,000

37 Schedule – Major Milestones 07/15/06 – FEJF approval of approach 08/01/06 – Signed subcontract (Air Sci/CIRA) & contract (CIRA/WGA) 08/15/06 – Draft Project Workplan 11/01/06 – Operational Test Version of FETS 01/01/07 – FETS Operational, Technical Support Document & User’s Guide 03/01/07 – TSS Fire Tools Developed

38 Summary Recommend: –Start with a nuts-and-bolts database structure of the FETS (NM FTS) –Build a commodity-based FETS –FETS attached to WRAP’s TSS This will support development of regional haze SIPs –Develop User’s Guide & Technical Support Documents Request for FEJF to reach consensus on providing direction to FETS Task Team with regard to developing the FETS.

39

40 Reference

41 Essential Components of WRAP FTS Minimum information required to calculate emissions, assess impacts on haze, meet requirements of Rule 1.Date of Burn 2.Burn Location 3.Area of Burn 4.Fuel Type 5.Pre-Burn Fuel Loading 6.Type of Burn 7.Classification: “Natural” or “Anthropogenic”