1. 2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
Load Management System
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
Availability Based Tariff Meter
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Utility Monitoring System Overview AH&MA Annual Conference & Leadership Forum April 5, 2001 Chicago, IL Brian Burke, CEM Energy Manager.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
By Dalip Singh, President, AEE Delhi Workshop for Electricity Consumers On 25Apr 2015 at NMA, Sector 62 Noida.
Energy Management System Future Group. How Energy Management System helps  Gives Electrical parameters and energy consumption Section or store wise for.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Power Line Carrier Communication based Automated Meter Reading System
THIN CLIENT COMPUTING USING ANDROID CLIENT for XYZ School.
1. WHAT IS METER ? A device which measures, indicates and records certain measurable quantity. 2. WHAT IS ENERGY METER ? A device which measures, indicates.
Metering & Data Processing
ELECTRICITY BILL AND METER MANAGEMENT SYSTEM
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Smart Metering and the Smart Grid How does it work and what can it do? Will Chaney 1Energy Awareness Week, 3-8 May 2010.
Event Management & ITIL V3
SPECIAL ENERGY METER STORES STORES THE FOLLOWING DATA DURING THE 10 DAYS PERIOD (i)15 MIN. BLOCKWISE ACTIVE ENERGY FOR 10 DAYS (ii)15 MIN. BLOCKWISE AVERAGE.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
The EnergyMizer Power Reduction & Conditioning System ®
Rudan ltd. For efficient energy management. Our Vision With efficient management and application of new technologies, to become a leading company in the.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
INFSO-RI Enabling Grids for E-sciencE EGEE is a project funded by the European Union under contract INFSO-RI Grid Accounting.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Availability Based Tariff (ABT) in Northern Region.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
Point of connection Mechanism
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
PRESENTATION ON TARIFF POLICY By S.R.SETHI DIRECTOR (OPRS) DELHI TRANSCO LTD.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Open Access Power Purchase
UNIT 4 NETWORK ENVIRONMENTS.
What is ASEMR /ASKUE/ and the Need for Its Implementation
Liquid LVs propellant consumption control terminal system
Queries raised by Director (Tariff) on ARR and Tariff Application of SLDC for FY on
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Presentation transcript:

1

2 ENERGY MANAGEMENT SYSTEM AN OVERVIEW AN OVERVIEW

3 COMMSSION HAD ISSUED DIRECTIVE IN THE TARIFF ORDER OF JUNE 2003 TO PREPARE A TOTAL SCHEME OF ‘ABT’ IN CONSULTATION WITH DISCOMs CLEARLY DEFINING THE RESPONSIBILITY OF EACH LICENSEE AND SUBMIT TO THE COMMISSION.  IN PERSUANCE TO THE ABOVE DIRECTIVE DELHI TRANSCO LTD. HAD FINALIZED THE SCHEME FOR EFFECTIVE IMPLEMENTATION OF ‘ABT’ IN DELHI.  SCHEME HAD BEEN SUBMITTED TO THE COMMISSION.

4 NECESSITY FOR ENERGY MANAGEMENT SYSTEM  AVAILABILITY BASED TARIFF WAS APPROVED BY CERC FOR IMPLEMENTATION TO ACHIEVE GRID DISCIPLINE AND ENSURE QUALITY POWER SUPPLY TO THE CONSUMERS.  AS PER ‘ABT’ EACH LICENSEE IS TO SCHEDULE POWER ON DAY AHEAD BASIS IN 15 MINUTES TIME SLOT BASISAND ENSURE ADHERING TO THE SCHEUDLE ACCEPTED BY SLDC.  FOR EFFECTIVE IMPLEMENTATION OF ‘ABT’ THE INFORMATION OF LOAD DRAWAL ON 15 MINUTES TIME SLOT IS NECESSARY.

5 NECESSITY FOR ENERGY MANAGEMENT SYSTEM CONTD…..  ABT ALSO PROVIDES FOR SELF GENERATION OF REACTIVE POWER BY THE LICENSEE-EFFECTIVELY NO DRAWAL OF REACTIVE ENERGY AT THE DRAWAL POINT.  REACTIVE ENERGY IS ALSO PRICED AS PER THE ORDERS OF THE COMMISSION.  ENERGY DRAWAL WITH FREQUENCY STAMPING AVERAGED OVER 15 MINUTES TIME SLOT IS ALSO REQUIRED FOR LOAD DESPATCH CENTRE OF THE LICENSEES TO TAKE CORRECTIVE ACTION.  THIS IS ONLY POSSIBLE THROUGH AN ONLINE ENERGY MANAGEMENT SYSTEM.

6 OBJECTIVES OF EMS SYSTEM IT IS METERING, SYSTEM BASED ON AVAILABILITY BASED TARIFF CONCEPT TO ACHIEVE: ACTIVE ENERGY  ENERGY CONSUMPTION OF EVERY 15 MINUTES TIME SLOT FOR 96 SLOTS IN A SINGLE DAY.  TO COMPARE THE CONSUMPTION IN 15 MINUTES TIME SLOT WITH THE SCHEDULED ENERGY.  TO DETERMINE OVER DRAWAL & UNDER DRAWAL DURING EVERY 15 MINUTES TIME SLOT.  TO DETERMINE THE AVERAGE FREQUENCY IN 15 MINUTES TIME SLOT COMMUNSURATE WITH ENERGY DRAWAL.  TO DETERMINE THE UI PAYABLE/ RECEIVABLE FOR EACH 15 MINUTES TIME SLOT.  TO COMPUTE SUCH UI FOR 24 HRS. BASIS & THEREAFTER ON WEEKLY BASIS.

7 OBJECTIVES OF EMS SYSTEM CONTD…. REACTIVE ENERGY  TO RECORD LAGGING REACTIVE ENERGY DRAWN BY A LICENSEE FROM TRANSCO AT EXCHANGE POINTS BELOW & UPTO 97PU VOLTAGE.  TO RECORD LEADING REACTIVE ENERGY DRAWN BY A LICENSEE FROM TRANSCO AT EXCHANGE POINTS BELOW & UPTO 97PU VOLTAGE.  TO RECORD LAGGING REACTIVE ENERGY PUMPED INTO THE TRANSCO SYSTEM AT & ABOVE 103PU VOLTAGE AT EXCHANGE POINTS.  TO RECORD LEADING REACTIVE ENERGY PUMPED INTO THE TRANSCO SYSTEM AT & ABOVE 103PU VOLTAGE AT EXCHANGE POINTS.  TO COMPUTE SUCH ENERGY FOR ALL EXCHANGE POINTS AND COMPUTE THEM FOR EACH LICENSEE.

8 COMPONENTS OF THE PROPOSED EMS SYSTEM  COMMUNICABLE, PROGRAMMABLE ENERGY METERS-IMPORT/ EXPORT BASED,0.2 PRECISION-AS MAIN METER TO COMPUTE WATT VAR-FOUR QUARDRANTS VA  CHECK METERS-AS BACKUP TO MAIN METER & ACT AS ENERGY BALANCE METERS  GPS SYSTEM-FOR TIME SYNCHRONISING  POWER QUALITY ANALYSER TO MEASURE: WATT VAR-FOUR QUARDRANT VA VOLTAGE SAG & SWELL HARMONIC CONTENTS EQUIPMENT AT S/STNs.

9 COMPONENTS OF EMS COMPONENTS OF EMS  COMPUTER HARDWARE & MICROPROCESSOR  FREQUENCY SAMPLING DEVICE  LAN & ASSOCIATED HARDWARE FOR READING THE METERS AND POWER QUALITY ANALYSER ETC.  MODEM & COMMUNICATION CARD FOR EXPORTING DATA TO TRANSCO SERVER THROUGH COMMUNICATION HARDWARE SUCH AS GPRS,WIRELESS, TELEPHONE, FIBRE OPTIC ON IEC PROTOCOL.  NEED BASED OFFICE AUTOMATION HARDWARE FOR DATA PROCESSING

10 COMPONENTS OF EMS CONTD..  EQUIPMENT AT TRANSCO CONTROL CENTRE  MODEM & COMMUNICATION HARDWARE FOR RECEIVING DATA FROM VARIOUS S/STNs. THROUGH COMMUNICATION  TRANSMIT PROCESSED DATA FROM TRANSCO SERVER TO LICENSEES COMPUTER THROUGH COMMUNICATION LINK.  OFFICE AUTOMATION HARDWARE FOR DATA PROCESSING/RECORDING.

11  COMPUTER AT LICENSEE END TO RECEIVE & DISPLAY DATA PERTAINING TO POWER & ENERGY OF THE LICENSEE.  MODEM & COMMUNICATION HARDWARE FOR RECEIVING DATA FROM TRANSCO  NEED BASED OFFICE AUTOMATION HARDWARE FOR DATA VIEWING. COMPONENTS OF EMS CONTD.. EQUIPMENT AT LICENSEE END

12 SOFTWARE FOR FOLLOWING USES  READ METERS AND COMMUNICATE DATA TO COMPUTER/ MICROPROCESSOR THROUGH LAN.  COMPUTE ENERGY DATA LICENSEE WISE.  COMMUNICATE DATA ON AVERAGED OVER 15 MINUTES TIME SLOT BASIS TO TRANSCO.  PROCESS DATA AS PER THE APPLICABLE ABT ORDERS WITH 15 MINUTES TIME SLOTAND FREQUENCY STAMPING i.e. ACTIVE ENERGY REACTIVE ENERGY ‘UI’ CHARGES

13

14 ENERGY MANAGEMENT SYSTEM OF POWER GRID PROPOSED ENERGY MANAGEMENT SYSTEM OF DELHI TRANSCO LTD. ABT, Check Meters & Power Monitor installed at different Exchange-Points Consumption would be available On-Line in every 15 minutes. Readings would be available on-line, so no further action required. Bill will be totally computerized. DTL would raise the bill of Energy On- Line at the office of different Licensees. NREB prepares REA for raising energy bills.REA is prepared on monthly basis ‘UI’ and Reactive Energy accounts are prepared on weekly basis. SEM Meters installed at Exchange Points Energy consumption of each 15minuts time slot downloaded after seven days. Readings sent to NRLDC through Floppy, CD or NRLDC computes readings and sent to NREB. To different States To Generator companies Time Period: Almost Online As there is no human intervention, it is a fool proof and efficient method of Energy Accounting. Time Period:It takes about 8-10 days to process the readings and make the accounts by RLDC/REB. Due to human intervention this method is time consuming and error prone.

15 COMPARISION OF PROPOSED EMS WITH PGCIL SEM SYSTEM PGCIL SYSTEM BEING USED FOR ABT BILLING IN REGIONAL GRIDS PROPOSED EMS BY DTL 1) OFF LINE1) ON LINE 2) PROCESSING & ACCOUNTING AFTER 7 DAYS. 2) BEING ON LINE PROCESSING AND ACCOUNTING IN EVERY 15 MINUTES TIME SLOT 3) THE CORRECTIVE MEASURES SUCH AS LOAD MANAGEMENT IS NOT PROPER AS THE BEHAVIOUR OF DRAWAL VS SCHEDULED ALLOCATION IN DIFFERENT FREQUENCY SPECTRUM KNOWN ONLY AFTER PROCESSING OF THE DATA DOWN LODED AFTER 7 DAYS. 3) THE CORRECTIVE MEASURES CAN BE APPLIED AFTER EVERY 15 MINUTES.

16 COMPARISION OF PROPOSED EMS WITH PGCIL SEM SYSTEM… CONTD. 4) ‘UI’ ACCOUNT SETTLED IN 7 DAYS. 4) ‘UI’ ACCOUNT SETTLEMENT CAN BE POSSIBLE ON DAILY BASIS. 5)METER ERROR IS KNOWN AFTER PROCESSING THE DOWNLOADED DATA AFTER 7 DAYS. 5) METER ERROR DEDUCTION IS SIMULTANEOUS DUE TO INBUILT SELF CHECK MECHANISM AND ANNOUNCIATION OF CORRECTIVE MEASURES REQUIRED. 6) NO PROVISION OF COMPUTATION OF SIMULTANEOUS DEMAND. 6) COMPUTATION OF SIMULTANEOUS DEMAND OF EACH LICENSEE IS POSSIBLE WHICH IS REQUIRED FOR PROPER LOAD MANAGEMENT.

17 7)AUTOMATIC BILLING IS NOT POSSIBLE 7) AUTOMATIC BILLING WITH NO INTERVENTION OF HUMAN FROM METER READING TO ISSUE OF BILLS EVERY PROCESS IS TOTALLY COMPUTARIZED AND HENCE FULLY AUTOMATIC. COMPARISION OF PROPOSED EMS WITH PGCIL SEM SYSTEM… CONTD…

18