Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis.

Slides:



Advertisements
Similar presentations
1 Capacity mechanisms - IFIEC position June 12 th 2012.
Advertisements

David Purkey, SEI Rob Lempert, RAND
Ad Hoc Working Group on The World at 7 Billion and Beyond: Promoting a Forward-Looking Vision of People-Centred Development POSSIBLE ROLE FOR FAO relating.
Economic Performance of Sri Lanka
UK BH Investment Forum Kemal Kozarić Governor of the Central Bank of Bosnia and Herzegovina London, United Kingdom, April 18, 2013.
Hydropower Development: Experience of Nepal
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Energy Infrastructure in Latin America the View of the IDB May 6, 2011 Miami, Florida Sustainable Energy for all.
Derek Eaton Division of Technology, Industry & Economics Economics & Trade Branch Geneva, Switzerland “Designing the Green Economy” Centre for International.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 15 Finance and Fiscal Policy for Development.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
The Status Quo, Barriers, and Countermeasures to Small Hydropower Development in Rural China Hydropower and Rural Electrification Development Bureau, the.
China’s Sustainable Energy Policy
5 - 1 Copyright McGraw-Hill/Irwin, 2005 Households as Income Receivers Households as Spenders The Business Population Legal Forms of Business Public Sector:
Economic Environment. Meaning of Economic Environment: Those Economic factors which have their affect on the working of the business is known as economic.
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Presented by: Gerald W. Braun, Director Business Development June 17, 1998 A Business Unit of Amoco/Enron Solar Financing of Renewables: Considerations.
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
Financing Urban Public Infrastructure
WATER ISSUES IN THE EASTERN EUROPE:
RAO “UES of Russia” Action Plan on Reliability Improvement of Unified Power System of Russia August 29, 2005.
O Papel da Universidade no Século XXI: o MIT e o Crescimento do Brasil Jerson Kelman CEO, Light S/A 11 de Agosto de 2010 São Paulo - Brasil.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
National Policy Dialogue in Ukraine on Integrated Water Resources Management First meeting of the Steering Group (Kiev, 25 April 2008)‏ Nataliia Zakorchevna.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
Hydrology Days 2004 Applied Stochastic Hydrology Lessons Learned from the Brazilian Electric Energy Crisis of 2001 Jerson Kelman President of ANA (Brazilian.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» to the 18th World Energy Congress (round table) Buenos Aires.
“Brazil’s Moment in the sun” Energy front – a key part of its economy Jerson Kelman – CEO, Light S/A.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
Structural Reforms Improve the supply side of the economy Measures – 1.Industrial Reforms 2.Public Sector Reform & Disinvestment 3.Trade & Capital Flows.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Seminário Regulação, Infraestrutura e o Futuro do País FGV, 31 julho 2014 Jerson Kelman COPPE-UFRJ
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Russian power sector reform Presentation to AmCham Russia members by CEO of Unified Energy Systems of Russia, Anatoly B. Chubais March 20, 2001Moscow.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
INTEGRATED RIVER BASIN MANAGEMENT: FROM THEORY TO PRAXIS B.P.F. Braga Director Agência Nacional de Águas Regional Workshop and Capacity Building Training.
2 ELECTRICITY SUPPLY MATRIX WORLD x BRAZIL (%) 3 HYDROPOWER REQUIRES SYSTEM INTEGRATION HAVING CONTINENTAL DIMENSIONS EQUIVALENT TO EUROPE Rio de Janeiro.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
ANA AGÊNCIA NACIONAL DE ÁGUAS SESSION 5 - WATER GOVERNANCE IN BRAZIL Gisela Forattini Voorburg, the Netherlands May 2006 USER-PRODUCER CONFERENCE:
THE URBAN SYSTEM Human System Natural System Built System.
Public Private Partnerships An Academic Understanding, or Not 2003 NEFPP Annual Conference.
Kiichiro Fukasaku Development Centre
El Gallo Hydroelectricity Project PDD Analysis
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
ICAP SAFA Conference 2016 South Asia: Corridor of Opportunities Lahore, January 30, 2016 Mirza Hamid Hasan.
INVESTMENT IN GENERATION CAPACITY PAYMENTS IN COLOMBIAN MARKET Luis A. Camargo S. Wholesale Electricity Market Manager Colombia APEx Orlando. October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
1 Economic Dispatch Sub-Committee Meeting Ross Baldick Department of Electrical and Computer Engineering The University of Texas at Austin September 24,
INCREASING THE DIALOGUE BETWEEN SCIENTISTS, POLICY MAKERS AND STAKEHOLDERS SUBERNAREKHA RIVER BASIN, INDIA SOCIO-ECONOMIC ISSUES AND POLICY OPTIONS RAMESH.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
Electricity Power Market: Competitive and Non-competitive Markets Ito Diejomaoh.
Strategy of economic and social development of St. Petersburg until 2030 Committee for Economic Policy and Strategic Planning of St. Petersburg
André Pepitone da Nóbrega Director Brazilian Regulatory Framework: Supporting the Growth of Renewable Energy Installed Capacity in a Sustainable Development.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Comparison between Wind Energy Public Policies in Brazil and Colombia
Energy day July 3th, 2012.
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
Issues hindering the Adoption of BioEnergy in Pakistan
Overview on Renewable energy in Bulgaria
SEWORLD – ELECTRIC SECTOR IN THE WORLD Risks to Water Security
NS4960 Spring Term, 2018 China: Expanded Renewables
Water Statistics and Water Account in Jordan
Water Utility Performance
Presentation transcript:

Designing effective national incentive and subsidy schemes in industrial policy (energy and water) Jerson Kelman Brazil Round Table Comparative Analysis of Industrial Policy Worldwide Moscow, April 27, 2004

Brazil Population (millions) 180 Territory (millions km2) 8.5 Per capita income (US$/year) 2,700 (?)

Globalization and its discontents (2002) Joseph Stiglitz (Nobel Prize of Economy, 2001) In Russia, market economy has delivered less than expected. Substitution of central planning by market driven economy and reduction of military expenditure could, in theory, lead to overall prosperity. Instead, in Russia industrial output went down 60% (in contrast with the period, 24%)

Key Considerations of Russia’s New Industrial Policy 27. The strategy of minimal state interference in industrial policy has exhausted itself…

Key Considerations of Russia’s New Industrial Policy 9. …An industrial policy cannot be tantamount to giving away of state budget resources. 12. The first priority would be supporting of exports … The mechanism for doing this entails state guarantees of up to 25 percent of from investments for creating such production project…

Key Considerations of Russia’s New Industrial Policy State guarantees Case 1: Brazilian Electric Power Industry

Country Wide Integrated Electric System  Installed Capacity = 73,000 MW  96 Hydropower plants > 30 MW  57 Regulating reservoirs  Country is interconnected by 70,000 km of high-voltage lines

Reservoirs and power plants in cascade TRÊS MARIAS V = 19 billion m³ 396 MW SOBRADINHO V = 34 billion m³ 1,050 MW ITAPARICA V = 10 billion m³ 1,500 MW PAULO AFONSO IV 2460 MW XINGO 3000 MW MOXOTÓ 440 MW PAULO AFONSO I MW II MW III MW 95% Hydro  Centralized dispatch

The Liberal Power Sector Reform of 1996 (which failed…) Rationale: –To promote economical efficiency Guidelines: –Private investment and competition in energy generation and retailing –Transmission and distribution to remain regulated, with provisions for open access

SOUTH-SE System Energy Wholesale Market Prices (US$ / MWh)

THE ENERGY CRISIS OF 2001 (load curtailment of 20%) There was a market failure  Government restored centralized expansion planning for new plants and transmission lines Owner of a new hydroelectric plant now gets, before construction, a long term contract with a pool of distribution companies (equivalent to an annual “rent”) All power plants operate according to rules set by central dispatch

Key Considerations of Russia’s New Industrial Policy 15. Support of industrial infrastructure development needed by business. 16. The purchase area for industrial development needs the following: ….. - tougher control should be exercised over investment activities of the “natural” monopolies…

Key Considerations of Russia’s New Industrial Policy State control should be exercised on processes or on results? Case 2: Subsidizing sewage treatment plants for cities

SEWERAGE Residential Service Coverage 56 % Urban areas 3 % Rural areas 47 % Brazil

River Pollution  Water Rationing TIETÊ RIVER IN SÃO PAULO

CANTAREIRA SYSTEM

CANTAREIRA SYSTEM Is responsible for the water supply to approximately 10 million inhabitants of the Greater São Paulo Area. Guaraú Water Treatment Plant Nominal Treatment Capacity: 33 m 3 /s Water inflow at the entrance of Guaraú Plant – Cantareira System

Basic Assumptions and Objectives: Government does not pay for civil works or equipment. It pays for results. Government does not pay service provider before the plant is in full operation.

Terms of the contract between Government and service provider estimated Government subsidy is 50% of the total estimated capital cost of the plant, according to a Reference Value Table Payments are made quarterly on fixed amounts for a period varying from 5 to 7 years, provided sewage is treated according to quality standard set in contract Government makes a bank deposit in favor of the service provider equivalent to present value of the cash flow

Case 3: Integrated management of natural resources taking into account interests of multiple sectors of economy

Water allocation among sectors Navigation Hydroelectricity Urban supply Industrial supply Tourism Fishing Flood Control Irrigation

Reservoirs and power plants in the São Francisco River TRÊS MARIAS V = 19 billion m³ 396 MW SOBRADINHO V = 34 billion m³ 1,050 MW ITAPARICA V = 10 billion m³ 1,500 MW PAULO AFONSO IV 2460 MW XINGO 3000 MW MOXOTÓ 440 MW PAULO AFONSO I MW II MW III MW

Loss of firm energy for each m 3 /s used for irrigation 2,79 MWmed 2,54 MWmed 2,08 MWmed 1,06 MWmed 0 MWmed 3,22 MWmed

SOLUTION..... River Basin Committee Water Rights Enforcement Polluter pays Water Resources Management