LHCD Steady-State Technology for KSTAR J. Hosea, S. Bernabei, R. Ellis and J.R. Wilson Presented at the KSTAR Workshop General Atomics, San Diego, CA May.

Slides:



Advertisements
Similar presentations
1 1 – Experience of diagnostics used for LH grill protection 2 – Layout of the suitable diagnostics in ITER 3 – Info on fibre optics for wave guide arc.
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29,
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
PAM experiment on FTU (EX/5-5) - 20 th FEC.Villamoura 1-6 Nov, V. Pericoli Ridolfini et al 1 LHCD and Coupling Experiments with an ITER- like PAM.
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
KCS Ongoing R&D Christopher Nantista SLAC LCWS11 Granada, Spain September 29, …… …… …… … ….
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
Microwave Hybrid Circuits
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Design of Standing-Wave Accelerator Structure
By C. P. Moeller General Atomics, San Diego, California , USA RF Launchers That Survive Presented at the Renew theme III workshop at UCLA, March.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Progress Towards RF Steady State Systems For Fusion Devices
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
30 GHz waveguide line modification towards 12 GHz.
1 Association Euratom-Cea TORE SUPRA Tore Supra “Fast Particles” Experiments LH SOL Generated Fast Particles Meeting Association Euratom IPP.CR, Prague.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
HCCB TBM Mechanical Design R. Hunt, A. Ying, M. Abdou Fusion Science & Technology Center University of California Los Angeles May 11, 2006 Presented by.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
HT-7 HIGH POWER MICROWAVE TEST SYSTEM AND EXPERIMENTS WANG Mao, LIU Yue-xiu, SHAN Jia-fang, LIU Fu-kun, XU Han-dong, YU Jia-wen Institute of Plasma Physics,
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
1.3GHz Input Coupler for ILC
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
1 LHCD Properties with a New Lower Hybrid Wave Antenna on HT-7 Tokamak Wei Wei,Guangli Kuang,Bojiang Ding,Weici Shen and HT-7 Team Institute of Plasma.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Cavity support scheme options Thomas Jones 25/06/15 1.
Cryostat & LHC Tunnel Slava Yakovlev on behalf of the FNAL team: Nikolay Solyak, Tom Peterson, Ivan Gonin, and Timergali Khabibouline The 6 th LHC-CC webex.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
SPS High Energy LSS5 Thermal contact & cooling aspects
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Straw man layout for ATLAS ID for SLHC
LCWS11 WG4 Fully featured accelerating structure engineering design
Stress and cool-down analysis of the cryomodule
High efficiency work and MBK development for accelerators
RF Layout 3pi/2 for Discussion
An X-band system for phase space linearisation on CLARA
12 GHz High Power RF components requirements for CEA activities
LH Generated Hot Spots on the JET Divertor
Challenges for FCC-ee MDI mechanical design
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Purpose of the ex-p: commission the LH coupler
Presentation transcript:

LHCD Steady-State Technology for KSTAR J. Hosea, S. Bernabei, R. Ellis and J.R. Wilson Presented at the KSTAR Workshop General Atomics, San Diego, CA May , 2004

May 2004 LHCD Steady-State Technology for KSTAR The present LHCD design for KSTAR has been developed based on TPX considerations and with PPPL supporting the KSTAR team effort It has many of the design features for the C-MOD LHCD system –C-MOD operation will serve to test these features for relatively short pulses (5 sec) However, the near steady-state of KSTAR operation (300 sec) presents some new challenges which will require new coupler design features –Better heat removal from the coupler grill –Shielding of the microwave windows from direct line of sight to the plasma –Compact water loads for capturing power reflected from the grill/plasma interface We propose to enhance our collaboration with KSTAR to help address these challenges and provide a suitable steady-state launcher design for KSTAR

May 2004 Very Good Spectral Control is Provided by Phasing of Each of 32 Columns of KSTAR Design Maintaining this spectral control will be a primary objective for the steady-state KSTAR design 32 columns x 4 rows = 128 active guides 4 x 0.5 MW klystrons power 8 columns each Each column is individually phase controlled with high power phase shifters Microwave windows need to be placed outside of stacked coupler region to avoid sight of plasma

May 2004 The power splitter/grill guides and water loads fit into a very compact design It is important to maintain this compact design to preserve spectral control and to minimize waveguide losses Cooling of the components - grill, guides, and loads - is more difficult for a compact design Input H-plane taper Fixed phase shifter 4.75 cm 5.5 cm Capacitive button Plasma boundary Matched load

May 2004 Design of coupler assures that wavefronts are in phase at the mouth of the coupler The capacitive button, and fixed phase shifter provide for good power splitting vertically with very little power going to the load guide – P 2 /P 1 = dB – P 4 /P 1 = dB – P 3 /P 1 = dB P in 1 P load 3 2 P out 2 4 P out 4

May 2004 C-MOD LHCD Antenna has a Similar Design to KSTAR 24 columns x 4 rows = 96 active guides 12 x 0.25 MW klystrons power 2 columns each Each column is individually phase controlled with high power phase shifters Microwave windows are placed in nose of coupler

May 2004 C-MOD LH Launcher System - Elevation View front coupler vacuum windowH-taper 3 dB splitter E-taper short or dump loads diagnostic probes diagnostic probes C-MOD port flange

May 2004 C-MOD KSTAR f 2 b (GHz 2 cm) C-MOD LH operations will serve to test short pulse (5 sec) features of the KSTAR design Critical steady state (300 sec) design features required for KSTAR LH design 1..5 MW net power (4 Klystrons kW/guide) Waveguide dimensions: KSTAR - 5.5x0.55 cm 2 C-MOD - 6.0x0.55 cm 2 Power Flux in the Waveguides for KSTAR and C-MOD kW/cm 2

May 2004 Heat Removal From the Coupler Nose is the Major Critical Issue for Steady-State Two possible solutions for KSTAR LH coupler cooling: – Incorporate Frascati ITER PAM (passive-active- multi-junction) grill cooling design  good cooling but reduces active guides by half and reduces directivity of spectrum – Design cooling into the present stacked plate KSTAR coupler design  Heat conductivity of 2 mm SS septum is two low  Material must be changed to Glidcop or CuCrZr or cooling tubes imbedded into septum We propose to keep optimum spectral control - design cooling into the stacked plate design – LHCD operation on KSTAR can then serve to set the optimum phase properties for the ITER PAM design and possibly lead to a better launcher option

May 2004 Frascati PAM LH Coupler Cooling of passive guides between all active guides Active guide Passive guide F. Mirizzi et al., Fus. Eng. Des (2003) 621.

May 2004 EU ITER LH PAM Design for Water Cooling SS cooling pipes HIP imbedded into berilium passive guide spacer plates Glidcop or CuCrZr used for active guide wall plates P. Bibet and F. Mirizzi, CEA:EFDA/00-553; ENEA;EFDA/ (2001)

May 2004 Top/Bottom Cooling of Stainless Steel Fully Active Grill is not Acceptable Top of grill water cooled to within 1 cm of front 100 W/cm 2 from plasma 1181° C Temperature at center of septum reaches 1181° C in steady state SS

May 2004 Inserting Dummy (Passive) Guides Between Active SS Guides Gives Better/But Not Sufficient Cooling 1170° C still too high for steady-state Making septa out of Glidcop does give a reasonable temperature of 410°C However, a solution without passive guides is preferred for spectral flexibility Cooled top Glidcop septum Cooled top Midplane 1170°C660°C Midplane SS septum 320°C410°C

May 2004 Top/Bottom Cooling of Fully Active Grill With Glidcop Septa Gives Sufficient Cooling for Steady-State This is the preferred design for KSTAR to assure optimum spectral selection and directivity Top of grill water cooled to within 5 mm of front Glidcop septum 255° C SS insert 314° C 549° C

May 2004 First Pass Power Spectrum for Fully Active vs Passive/Active Grill Fully active grill gives much better directivity and a wider range for n || If lower n || proves to be optimum on KSTAR then the PAM design may prove to be acceptable for ITER

May 2004 Placement of Windows Out of View of Plasma is Desirable for Steady-State Stacked guide/power splitter Source 1 feed Phase Shifter Dummy load 3 dB hybrids Cooled SS vacuum flange Ceramic window location Titanium guide C-MOD window location Feed guide/power splitter system for C-MOD The windows for the C-MOD LH coupler are placed in the grill nose The placement of the windows for KSTAR launcher need to be placed after splitter if possible - but where f < f ce on the vacuum side This placement will need to be an integral part of the launcher design

May 2004 Further Development of Compact Reflected Power Loads for Arm 4 of Splitter is Proposed Minimization of the recirculation of reflected power is essential for controlling the spectra – Shorting plates are acceptable for equal reflections from the guide ends poloidally – Compact loads are needed for non-uniform reflections (e.g., for vertical plasma shifts and arcs) Water tube insertion designs have been studied – Heat transfer is not totally satisfactory and insulating tubes may prove too fragile Improved design needs to be developed

May 2004 Summary and Proposal Alternatives for US Support of LHCD on KSTAR We propose to help address the important steady-state LH launcher issues – Design, analyze and prototype (at high power) fully active grills that can sustain steady-state operation on KSTAR - a Glidcop/SS sandwich design is probably best for heat/disruption loads – Design proper placement of windows out-of-sight of plasma – Develop new compact water load for arm 4 of splitter - design and prototype (low and high power) This task is estimated to take two years at ~ $400 k per year We could also undertake to design and fabricate the entire LH launcher for KSTAR – This would involve integrating the designs above into a splitter/guide arrangement that would fit into the KSTAR port envelope – Most likely a three-way splitter poloidally would be designed so that the number of windows could be reduced to 32 and could all be placed inside the port space This task is roughly estimated to take ~ 3 years after the development above and to cost ~ $5 M in as spent dollars with 30% contingency.

May 2004 Proposed Schedule and Cost for the KSTAR LHCD Steady-State Launcher KSTAR 1.5 MW LHCD Launcher Schedule Design/develop concept for steady- state grill, power splitter, launcher, window placement, water load Prototype steady-state grill, power splitter, water load Design KSTAR launcher based on prototype results Fabricate and assemble launcher Projected Costs with Inflation and 30% Contingency 400 k 1.0 M2.0 M We project that a robust steady-state launcher can be provided for KSTAR at a cost of ~ $ 5 M and can be ready to support operations in 2010 Two years of R&D prior to design of the launcher is needed to assure the viability of the launcher and its potential relevance to ITER