National Drinking Water Mission – Review in Kerala – To provide every rural person with water for drinking, cooking and other domestic basic needs.

Slides:



Advertisements
Similar presentations
BUDGETING Training Unit 13.2 Principles and financial rules of mobility.
Advertisements

Managing the Health and Safety of Contractors
Indira Awaas Yojana Tamil Nadu Housing is an essential component for a living standard. IAY is a blessing in disguise for the rural poor to have a quality.
Scheme of 1% Interest Subvention for Housing Loans upto Rs. 15 Lakh.
INDIRA AWAAS YOJANA (IAY). Indira Awas Yojana (IAY)  Instruction has been issued to prepare two waitlists, one for SC/ST and another for non SC/ST following.
Understanding the impact of social health protection programs on social exclusion Soumitra Ghosh* and Harshad Thakur for correspondence
On implementation of RTI Act 2005: Government’s initiatives Department of Personnel and Training November 4, 2008, Delhi.
Challenges in IAY implementation – issues and solutions.
NRHM DISTRICT ACTION PLANS PARTICIPATORY & EVIDENCE BASED PLANNING PROCESS.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Hydropower Development: Experience of Nepal
1 Mid Day Meal Scheme Ministry of HRD Government of India PAB-MDM Meeting – Daman & Diu On
Mid Day Meal Scheme MDM-PAB Meeting- UT Chandigarh MDM-PAB Meeting- UT Chandigarh
Project on Convergence MGNREGS – NRLM and CFT Strategies
NATIONAL PROGRAMME OF MID DAY MEAL IN SCHOOLS (MDM) ANNUAL WORK PLAN & BUDGET DEPARTMENT OF SCHOOL EDUCATION GOVERNMENT OF TELANGANA HYDERABAD.
Participatory Audit and Planning (PAP) Process A tool for monitoring and ensuring “Decentralized planning’’ in utilization of Hospital Management Committee.
Social Audit & MGNREGA Meghalaya Venue : C & AG, New Delhi Date : 10 th March 2015.
AWAASSoft The ICT Solution
Understanding Financial Management
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
COHESION FUND MONITORING COMMITTEE 11 April 2008 Jurijs Spiridonovs Ministry of Environment Head of Project Development Department.
Presentation on SOCIAL AUDIT ( )
Community Based Monitoring System for Access to Basic Minimum Services, Kerala D Narayana Slim Haddad Smitha Aravind Katia Mohindra Access to Health Care.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
Indira Awas Yojna A flagship scheme for fulfillment of housing needs of the rural poor population, it aims at helping rural people below the poverty-line.
Decentralised Planning in Uttar Pradesh. 2 The Previous Process The decentralised planning process was actually implemented in the State from financial.
Report of the Comptroller and Auditor General Of India For the year ended 31 March 2000 Removal of Garbage and Sanitation Work Government of National Capital.
WELCOME. IAY/RAY 1.Housing is a fundamental human need. 2.Basic requirement for human survival as well as for a decent life. 3.Provides shelter from the.
Panchayati Raj Department
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
1 KZN SOCIAL WELFARE AND POPULATION DEVELOPMENT PUBLIC HEARINGS ON CONDITIONAL GRANTS 18 TH JAN 2006.
Meghalaya. C&RDDepartment Directorate of C&RD DRDA BDO SDPOADC State Institute of Rural Development Extension Training Centre.
National Conference on “Water and Sanitation for All in Madhya Pradesh: Opportunities and Challenges” Bhopal, Madhya Pradesh 23rd September, 2010 At :
Seminar on Village Health and Sanitation Committee A Vision under NRHM Shib Sekhar Datta
Recommendations of the 19 th JRM on Financial Management & Procurement 40 th Review Meeting of State FCs- New Delhi (30 th January 2014)
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
National Conference of Project Directors of District Rural Development Agencies July 8 – 9, 2013 Indira Awaas Yojana.
Repco Home Finance Ltd LOW INCOME HOUSING FINANCE - the REPCO Experience Presentation by M Balasubramanian, Managing Director, Repco Home Finance Limited.
1 Mid Day Meal Scheme MDM-PAB Meeting – Lakshadweep On Dining Hall in Lakshadweep.
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
INSPECTION OF SCHEMES. PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT.
GOVERNMENT OF TRIPURA TRIBAL WELFARE DEPARTMENT Presentation by Mr. L.H. Darlong, Secretary.
COMPLIANCE WITH THE SIGNING AND FILING OF PERFORMANCE AGREEMENTS BY HEADS OF DEPARTMENT BRIEFING TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION.
Under ICDS Scheme. ICDS Profile UNITSANCTIONEDFUNCTIONAL Dist. Level ICDS Cells21 No. of ICDS Projects148 No. of AWCs AWCs in Minority Area
Evaluation of Rashtriya Sam Vikas Yojna (RSVY) AMS Consulting (P) Limited.
1 Eurostat’s grant policy for 2010 Luxembourg, 23/03/2010 Unit A4 – Financial Management Section 3 – Grant procedures and agreements.
Revised Schedule of Mid Day Meal Programme Approval Board meetings for considering Annual Work Plan & Budget Venue: Conference Room No.112,C-Wing,
VALUE FOR MONEY AUDIT PRESENTATION ON MANAGEMENT OF DAM CONSTRUCTION AND WATER SUPPLY PROJECTS BY ZIMBABWE NATIONAL WATER AUTHORITY (ZINWA) PRESENTED.
Indira Awaas Yojana Ministry of Rural Development, Government of India.
NRLM (Rolled Out in 2011)– CONTEXT  NRLM works towards improving Livelihoods of about 50% of the rural Households who are poor and deprived through Organizing.
1 National Minorities Development & Finance Corporation N M D F C Grant-In-Aid Scheme for Strengthening of SCAs of NMDFC.
1 NATIONAL RURAL EMPLOYMENT GUARANTEE ACT EMPLOYMENT GUARANTEE AND THE RIGHT TO WORK.
1 Mid Day Meal Scheme Ministry of HRD Government of India MDM-PAB Meeting – Andhra Pradesh On
BACKWARD REGIONS GRANT CAPACITY BUILDING PLAN PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA PANCHAYATI RAJ DEPARTMENT GOVERNMENT OF ODISHA.
Mid Day Meal Scheme MDM-PAB Meeting : Chandigarh on Ministry of HRD Government of India.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SPORT AND RECREATION MUNICIPAL INFRASTRUCTURE GRANT By Molatelo Montwedi Date: 14 June 2005.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
A Presentation on the Report of the Monitoring and Evaluation Exercise conducted between 1st January - 30th June, 2011 Presented By Jil Mamza Monitoring.
Tanzanian German Programme to Support Health Monitoring and Evaluation Susanne Pritze-Aliassime.
ActionSoft Tool for Scheme Implementation & Monitoring.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
COMMERCIAL BANKS & ECONOMIC DEVELOPMENT. Economic Development may be defined as a process whereby an economy’s National Income is carried on from a lower.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
Structural Funds Financial Management and Control, Romania
Ministry of Finance Contribution of the Operational Programmes to the implementation of the NSRF objectives Boriana Pencheva Director Management.
National Rural Drinking Water Programme
Objectives of the Training
MDM-PAB Meeting- Nagaland
PAB-MDM Meeting – Mizoram
Presentation transcript:

National Drinking Water Mission – Review in Kerala – To provide every rural person with water for drinking, cooking and other domestic basic needs

 The Scheme revolved around the three distinct interrelated issue:  accelerating the coverage of remaining uncovered habitations with safe drinking water systems  promote sustainability of safe drinking water systems and  institutionalising water quality management, monitoring and surveillance systems.

 the planning process conceived was adequate for successful implementation of the programme in terms of coverage, source sustainability and water quality;  the fund management was economical and effective;  the implementation of various programme components was effective and efficient; and  there existed effective monitoring and evaluation mechanis m

 Vision, Mission and Goals of NRDWP as reflected in the framework for implementation  Water Quality norms stipulated in the Protocol on Water Quality Monitoring  Work execution norms of Kerala Public Works Department Code and Public Health Engineering Department data book.

 Five year rolling plan as envisaged in the framework for implementation of NRDWP (2010) was not prepared and only Annual Action Plan was prepared. ◦ Consequently, adequate priority was not given for schemes started years back.  In schemes involving several components, failure to plan and synchronize resulted in delayed commissioning of the schemes

 Audit analysis of the impact of the programme revealed that despite the Guidelines 2000 specifying norms of 40 lpcd of potable drinking water, by the end of ◦ only 76 lakh beneficiaries could be provided with said quantity of potable drinking water which worked to only 30 per cent of the total rural population of 2.55 crore. ◦ The challenges before the Government become all the more acute when faced with the heightened norms of providing piped water with quality to each household and higher norms of 55 lpcd.

 Delayed execution of 11 major schemes resulted in cost escalation and denial of potable drinking water facility to 10 lakh rural population.  Poor progress was noticed in respect of schemes implemented for coverage of quality affected habitations and for sustainability of waters sources  Out of the 16 subdivisional laboratories formed in the State, 15 of them were functioning without separate infrastructure and technical facilities.

 Though a State Water and Sanitation Mission was formed, activities as envisaged in the guidelines were not performed.  Effective monitoring and evaluation by State Level Scheme Sanctioning Committee or evaluation study by Central/State Government was absent during the period covered under audit.

 The KWA should prepare a comprehensive rolling plan for according priority for completion of schemes already taken up.  KWA should accord priority to cover all quality affected habitations in providing safe drinking water to rural population.  Government should urgently formulate and execute schemes for sustainability of water sources to ensure water security  The SWS & S Mission should function to ensure greater convergence among various departments, besides carrying out other activities as envisaged in the scheme guidelines.

 IAY launched by GOI in May 1985 was aimed to provide financial assistance for construction/up-gradation of dwelling units to Scheduled Castes, Scheduled Tribes, freed bonded labourers and non-SC/ST persons living Below Poverty Line.   The IAY benefits have been extended to widows or next kin of defence personnel killed in action, ex-servicemen and retired members of the paramilitary forces.  BPL General Category of 40% beneficiaries includes people from the minority community to the extent of 15%.

 Commissioner of Rural Development under LSGD is in overall charge of implementation of the scheme in the State.  Project Directors of PAUs under CRD are in charge of District level.  Secretaries of Block Panchayats (BPs) are the Implementing Officers.  CRD is to forward monthly progress received from PAUs to GOI.  PAUs are to allocate the funds received from GOI and State to the Secretaries of BPs in the respective district.  Kerala has much enhanced pattern of assistance by way of supplementary assistance from PRIs from the Development Fund of ` 1,51,500 from (for SCs), for STs it is over Rs. 2 lakh– earlier it was Rs. 38,500 for General and Rs. 51,500 for SCs/STs.

CRD Addl. Development Commissioner Joint Development Commissioner Asst. Commissioner Project Directors, PAU Addl. Project Directors (Planning & Monitoring) Secretary, BP Extension Officer/Joint BDO (Housing) Village Extension Officer State LevelDistrict LevelBlock Level

 The Scheme is being implemented in all the 14 districts in the State.  In the Kerala Panchayat Act, 1994, implementation of rural housing schemes is in the domain of panchayats.  There are 14 District Panchayats, 152 Block Panchayats and 978 Grama Panchayats.  Four districts were selected using Probability Proportional to Size Without Replacement Sampling (PPSWRS) method, dividing the State into two strata viz., Southern region and Northern region.

Malappuram Wayanad Alappuzha Thiruvananthapuram

 Within each selected district 20% Rural Blocks subject to a minimum two and within each selected Block 30% number of GPs subject to a maximum 10 were to be selected. Within each selected GP, two wards (villages) were also to be selected..  Eleven Block Panchayats were selected from the selected districts using Simple Random Sampling Without Replacement (SRSWOR).  25 Grama Panchayats and 50 wards (two wards from each GP) were selected in third stage sampling.  318 beneficiaries from 50 wards (minimum six from each) were selected for joint inspection.

PeriodOB allocationRelease Misc Fund available Expenditure incurred CentreStateTotalCentreStateTotal Total Percentage of expenditure during the five years ranged between 70 to 80. Short release by Centre and State in because of excess carryover of funds, short release of state share, delayed submission of UCs and non-adjustment of homestead share into IAY The above figure do not include PRI assistance. In Kerala, out of the total cost of ` two lakh per dwelling, the GOI plus State Government assistance is ` 48,500 called IAY component. The supplementary assistance by PRIs from the Development Fund is presently `Rs. 1,51,500 (in the ratio of 25:50:25 for DPs, BPs & GPs).

GOI Rural Development Ministry Addl Development Commissioner (General) CRD Consolidated Fund Allotment Letter Rural Dev. Ministry Sanctions PAU DD Cheque (RTGS) BP Scheme Account

 During to , against the physical target of 2.89 lakh new houses, 2.54 lakh were sanctioned of which 1.89 lakh houses were completed till March  Construction of houses were in progress of which were delayed beyond two years.  Major reasons for delay attributed to shortage of construction materials, non-availability of trained labourers, etc.  As of March 2013, houses were up-graded against houses sanctioned.

Audit Objective 1  To examine whether systems and procedures were in place for identification and selection of the target groups and the processes for allotment, construction and up-gradation of dwelling units were adequate and conformed to the scheme provisions. Selection of beneficiaries  Grama Sabhas were to select the beneficiaries from the list of eligible BPL households and their selection was final.  Grama Sabhas were sending lists of beneficiaries to BPs without verifying their eligibility.  Verification of the lists by VEOs revealed that the lists contained ineligible beneficiaries.

 Selection of beneficiaries under IAY is to be done from the permanent IAY waitlist prepared out of the BPL list and approved by the Grama Sabha.  No permanent IAY waitlists were prepared by the Blocks test- checked (except one block each in Thiruvananthapuram & Malappuram).  Selection was done from the annual beneficiary list prepared by Grama Sabha.  Annual beneficiary lists contained some APL beneficiaries.

 Since beneficiary lists are prepared annually, strict observance of priority could not be ensured –Lack of transparency in ranking of beneficiaries.  By not having a permanent waiting list, prioritization of beneficiaries in terms of seniority does not take place.  Beneficiaries have to repeatedly apply year after year for getting benefit as the preference is for widows as head of the family, physically handicapped, war widows etc.  Minimum 2 years, beneficiaries have to wait on an average.

 Most of the beneficiaries surveyed were not aware of waiting list or their priority.  This underscores the importance of Permanent waiting list.  Beneficiary survey of 318 revealed: ◦ 268 held BPL ration cards ◦ 49 held APL ration cards ◦ One had no ration card- he was selected on the basis of VEO’s certificate

Criteria for allocation among blocks/GPs within a district  Allocation of fund and physical target among blocks in a district was to be done by giving 75% weightage to housing shortage and 25% weightage to rural SC/ST population of the concerned block.  Only the PAU, Malappuram and one BP (out of the three BPs of the district test-checked) adhered to the principle.  PAUs and BPs of Alappuzha, Thiruvananthapuram and Wayanad did not observe this principle.  Non-adherence to the principle resulted in distribution of funds without giving due weightage to housing shortage and SC/ST population.

Homestead scheme A part of IAY scheme for providing homestead sites to those rural BPL households who have neither agricultural land nor a house site. Funding was shared between Centre and States in the ratio of 50:50. Financial assistance per beneficiary was `Rs. 10,000.  GOI sanctioned grant-in-aid of Rs crore to the State in December 2009 as one-time measure. State matching grant Rs crore.  Out of Rs crore received (December 2009) by the PAUs of the four selected districts, only Rs crore was utilised (13% achievement).  Assistance from Homestead scheme was meagre compared to the land value.

 Land value being very high in Kerala due to increased urbanisation, Rs. 10,000 is considered as too low and beneficiaries are not coming forward and PRIs are not able to formulate projects because of lack of interest.  Under decentralized planning, the Panchayat are providing assistance of Rs. 50,000 per beneficiary in rural areas for purchasing land – even that is not considered enough.  In the test-checked districts, out of households selected under Homestead only 3038 beneficiaries availed the benefits

Homestead scheme (contd..)  PAU, Wayanad did not follow GOI direction to credit the balance outstanding under Homestead into IAY account. Consequently, GOI did not provide second installment of IAY share during   There was shortage of fund under IAY during on account of this in Wayanad.  In the four test-checked districts, total no. of landless families were 45794, of this were sanctioned. And out of this, 3038 have benefitted, to the total cost of Rs crore.

Cluster approach to facilitate better implementation  Guidelines stipulate that the States should follow the cluster approach to facilitate better supervision, convergence of schemes and economies in purchases. For this purpose, all the villages in a district/block were to be divided into three groups and each group of villages was to be provided funds every year.  This was not seen done in any of the districts in the State.  Had this been followed, the difficulties faced by the beneficiaries could have been reduced.

Inventory of houses  The guideline provided that the implementing agencies should have a complete inventory of houses constructed/upgraded under IAY giving details of commencement of houses and its completion, name of the village and block in which the house is situated, occupation and category of beneficiaries and other relevant particulars to ensure proper planning.  In the blocks/districts test-checked, inventory of houses as stipulated in the guidelines were not prepared.  In the absence of inventorisation, details of the beneficiaries for future reference are not available.

Objective 2 To examine whether the physical performance under IAY in terms of number of units constructed and upgraded was as planned and targeted and that the constructions corresponded to the quality and financial parameters set out in the scheme guidelines. Shortage of allocation to SC/ST. Guidelines provide that at least 60 per cent of the IAY fund and physical target should be utilized for construction/upgradation of dwelling units for SC/ST BPL households. State picture  Against (60%) new houses to be provided, only (52.07%) were provided during  Physical achievement under Up-gradation was 50.43% against the target 60%.

Delay in completion of houses  Considerable delay noticed in completion of houses.  Laxity in monitoring and supervision of the worksites by VEO, Jt. BDO (Housing) and PDs.  BDOs failed to motivate the beneficiaries to complete the houses in time.  Due to non-completion, beneficiaries failed to create permanent shelter and also expenditure of Rs crore is locked up since 3-4 years.

 Total expenditure (new houses & upgradation) during was 49.86%.  In Alappuzha, against (60%) houses, 9785 (38.48%) were provided, shortage of 5470 houses. Against upgradation of 60%, the performance was 44.38%.  In Malappuram, against (60%) houses to SC/ST, only (51.41%) provided, short provision of 2099 houses. Against upgradation of 4258 (60%), only 3712(52.31%) were provided.  In both these districts, lack of willingness of SC/ST beneficiaries because they were accessing from other SC/ST promotion schemes and amount provided was perceived to be meagre compared to the actual cost of construction.  In the other two districts, coverage of SC/ST was more than the required percentage.

 Survey of 318 beneficiaries revealed that:  306 houses were allotted in the name of females  Land ownership - females:162; jointly with spouse: 65; other family members : 91 Non-provision of amenities  IAY houses were to be provided with sanitary latrine, smokeless chulha, drinking water facilities and electricity connection.  Out of 318 beneficiaries surveyed, 230 houses were without smokeless chulha, 60 were without sanitation facilities and 20 were without proper drinking water facility.

Involvement of contractor Guidelines stipulate that no contractor shall be involved in the construction of dwelling units under lAY, by the Implementing Agency.  Four beneficiaries (ST) out of 12 surveyed in one GP under Mananthavady Block in Wayanad District admitted involvement of contactors in construction of their IAY houses.  Village Extension Officer, Thondernadu GP, registered a complaint with the local police against a contractor who failed to complete construction of 5 houses (ST) sanctioned in These beneficiaries were sanctioned Rs. 2.5 lakh each.  Involvement of contractors will have risk of non-completion/ abandonment of houses/cost escalation.

Availability of information on technology  Guidelines stipulate that effort should be made to utilize local materials and cost effective disaster resistant and environment friendly technologies developed by various institutions. The State Governments may also arrange to make available information on cost effective and environment friendly technologies, materials, designs etc., at district/block level.  Cost effective disaster resistant and environment friendly technologies/products were not made available to beneficiaries.

Absence of uniform design of dwelling units (contd…)  Guidelines provide that Officers dealing with the IAY at the State, district and Block levels must be trained in various disaster resistant features to be adopted in the houses and they should ensure that this is complied with during their field visits.  No district and block level officials were trained in adopting cost effective and environment friendly housing technologies and also disaster proof building practices, to assist the beneficiaries.  No logos were displayed in front of majority of the houses inspected.  70 out of 318 houses surveyed were not aware of the requirement of displaying logos.

Delay in release of PRI share Since , 75% of total funds of Rs. two lakh were contributed by PRIs in Kerala  During , PRI share for construction of IAY houses was Rs crore. Of these, Rs. 1, crore spent on completed houses.  Though the time for completion of houses was two years from the date of sanction of house, release of supplementary assistance by PRIs was delayed.  The delay ranged from one to five years in the test-checked blocks.  This was one of the major reasons for delay in completion of dwellings.

Availing loan under Differential Rate of Interest (DRI)  There was failure on the part of the banks in providing hassle free DRI loans to IAY beneficiaries. The banks insisted strict security norms like pledging of property.  Out of 2.53 lakh beneficiaries in the State during the period , only 2753 availed DRI loan.  In Thiruvananthapuram and Wayanad Districts, none of the beneficiaries availed DRI loan whereas in Malappuram district, out of the 45 applications received by banks during to , loans were sanctioned to 15 beneficiaries only and the remaining 30 applications were rejected.  Majority of beneficiaries surveyed were not aware of DRI loan facilities.  Beneficiary survey revealed: ◦ Only 19 out of 318 beneficiaries were aware of DRI loan facilities. Of these, 8 availed loan facilities.

Credit-cum-Subsidy scheme  Guidelines provide that under Credit-cum-subsidy up to 20% of the total funds can be utilized for up-gradation of existing kutcha per household and Credit- cum- Subsidy will be Rs. 12,500 per household for construction of houses with credit from Banks/Financial Institutions.  During the period to , only 8.65% against 20% of the total funds was utilized for upgradation of existing kutcha houses and Credit- cum-Subsidy.  During the period to only 1491 beneficiaries availed credit cum subsidy, percentage of utilization was 0.15.

Objective 4 To examine whether the convergence of the IAY activities with other programmes as envisaged was effectively achieved and availability of a complete functional dwelling unit was ensured.  Absence of effective convergence in the test-checked districts.  Beneficiary survey also revealed that no support was received from any Government scheme for the facilities of water, sanitation and electricity.  Out of 318 beneficiaries surveyed, only 50 stated that there was convergence with other programmes like TSC/RGGVY etc.

Objective 5 To examine whether the mechanism in place for monitoring and evaluation of the outcomes of the programme was adequate and effective. Monitoring  Shortfall in monitoring at district level.  Shortfall ranging from four to ten meetings during audit period in convening District Level Vigilance and Monitoring Committee meetings.   Difficulties experienced by IAY beneficiaries were seldom discussed in these meetings.  Beneficiary survey (318 beneficiaries) revealed:   45 households faced problems in getting IAY assistance.

Evaluation Planning Commission entrusted PEO to conduct evaluation study during June 2009 to December  Many IAY beneficiaries ignorant about the stages of fund release and when to complete the house construction.  Wide range of time period for completion of the construction of houses.  Majority of the houses did not display IAY logo.  IAY houses are good and of average quality.  IAY beneficiaries faced problems regarding release of instalment causing delay in completion of the house.  The State Government also conducted an evaluation study through Centre for Development Studies that broadly corroborate our findings

 Necessity of a permanent waiting list is emphasised for identification of beneficiaries, their prioritization and for transparency in selection.  Land value being high it is essential that the assistance is substantially increased for Homestead schemes to be successful.  The cluster approach should be considered for better supervision (in view of delay in construction), convergence and economy in purchase.  To avoid delay in PRI supplementary assistance, augmentation of development fund/streamlining the loan facilities through banks to be considered.  System to be strengthened for effective convergences of IAY with other programmes for facilities of water, sanitation and electricity to be provided.