Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.

Slides:



Advertisements
Similar presentations
FAIR Status Report Hans Ströher NuPECC-Meeting Cracow June 9, 2006.
Advertisements

Boris Sharkov FAIR Joint Core Team
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Status of FAIR Boris Sharkov FAIR Joint Core Team.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
GSI and FAIR - EPICS status report - Peter Zumbruch Experiment control systems group GSI (KS/EE)
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
FAIR GmbH and FAIR Project History, Status and Outlook
IPY Dr Eduard Sarukhanian, Special Adviser to Secretary–General on IPY International Polar Year Status of preparation and the role.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Hosting EPOS components Executive & Coordination Office and Integrated Core Services Elisabeth Kohler, CNRS-INSU France EPOS IAPC 19/09/ Rome.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
Status of the FAIR Project Boris Sharkov FAIR Scientific Director GSI AustriaIndiaChina Finland FranceGermanyGreeceU KItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia.
FAIR – Facility for Antiproton and Ion Research
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt A Status Report Hans H. Gutbrod CBM collaboration meeting 7. July.2003.
European Strategy Forum on Research Infrastructures Dr.- Ing. Beatrix VIERKORN-RUDOLPH ESFRI Chair NuPECC Long Range Plan 2010, 9 th December 2010.
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Science and Technology Committee GGOS, December 2006.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
Geographical Enlargement of CERN Associate membership Principles and criteria S. Intoudi / 8 July
Status and Perspectives for the NuSTAR collaboration Reiner Krücken Physik Department E12 Technische Universität München.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
1 GUTs and Branes DESY Theory Workshop 2003 A brief introduction to the future of particle physics at DESY Albrecht Wagner Hamburg, 23 September 2003.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR Sweden FranceIndia Finland GermanyPoland Spain.
Facility for Antiproton and Ion Research
Chinese Contributions to FAIR Hushan Xu Institute of Modern Physics, CAS, Lanzhou
Oct. 16, 20081CBM Collaboration Meeting, Dubna, Zbigniew Majka FAIR project status  Establishment of the FAIR GmbH  Accelerator construction  Civil.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Opening CERN to non-European States (aka as ‘geographical enlargement’) Rüdiger Voss CERN International Relations Office FPRIB, SINP Kolkata| April 16-18,
Task XV Extension: Task Status Report Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting New Delhi,
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany 2nd PhD Science GSI 2014 – 11 August 2014 FAIR – Facility for Antiproton.
O. Kester, NuSTAR annual meeting, 27/02/2013
Delivery of FAIR In-kind items (feedback from India) Subhasis Chattopadhyay VECC-Kolkata & BI-Kolkata.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
2013 China-CEEC Business Council – proposed role and structure Michal Polański, Ph.D. Polish Agency for Enterprise Development Katowice, April 20th 2015.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
Status of the FAIR Project
Status of FAIR Status FAIR technical preparations
Status of HESR 18th March Gießen Dieter Prasuhn.
In-Kind FAIR David Urner FAIR, Darmstadt , D. Urner.
Ways to industry participation in CLIC 24th October, 2017
EU-Russia Cooperation in the Areas of Science, Research and Innovation
FAIR – the Universe in the labororatory
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
and collaboration with France
Presentation transcript:

Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia

FAIR – 16 Partner Countries AustriaIndiaChinaFinnlandFranceGermanyGreeceUKItalyPolandSlovakiaSloveniaSpainSwedenRomaniaRussia Observers New FAIR Joint Core Team Leader: Horst Wenninger New STI Chairman: Alex Müller

FAIR RealizationStart Version Phase B Accelerator systems Super-FRS X CR X NESR X Proton-linac X SIS 100 X SIS 100 RF Phase B X Antiproton-target and separator X RESR X HESR no electron-cooling X electron-cooler X SIS 300 X electron-ring (incl. electron-linac) X Basis experiments PANDA X CBM X NUSTAR X APPA (Applied, Atomic and Plasma Physics X FAIR RealizationStart Version Phase B Beam Lines from SIS18 to SIS100/300X from SIS 18 to HESRX from SIS18 to plasma physics caveX from SIS18 to NESRX from SIS 100 to Super-FRSX from SIS100 to antiproton targetX from SIS100 to CBMX from SIS100 to plasma physicsX from SIS300 to cavesX from SIS100/300 to high-energy atomic physics X from Super-FRS to CRX from CR to RESR/NESRX from RESR to HESRX from Super-FRS to NUSTAR Experiments X from NESR to SPARC/FLAIR- Experiments X FAIR start version as of Nov (940 Mio €)

4 FAIR accelerator schedule Beams available for experiments: SIS100 in 2014: nuclei up to 14 (11) A GeV, Z/A=0.5 (0.4) protons up to 29 GeV SIS300 in : nuclei up to 44 (34) A GeV, Z/A=0.5 (0.4) protons up to 89 GeV

CBM Collaboration Meeting - Zbigniew Majka 5 Roadmap for FAIR Nov. 2007:FAIR Start Event Definition of Start Version (ad valorem 940 M€) Oct. 2008: Finalization of legal documents the Convention with its five Annexes and the Final Act May 2009: Cross-Checking Conference German, English, French, Spanish, Chinese, Russian, Italien? ~July 2009:Signature of the Final Act for FAIR Formation of FAIR GmbH

CBM Collaboration Meeting - Zbigniew Majka 6 FAIR START VERSION FUNDS 940 MEuro Accelerator 420 MEuro Civil construction 282 MEuro Manpower 150 MEuro Left over 78 MEuro

CBM Collaboration Meeting - Zbigniew Majka 7 Accelerator EoIs ►Components worth 60.5M€ are currently not covered by EoIs ►FAIR Joint Core Team assumes that further EoIs will arrive from FAIR partner countries (France, Slovakia, Slovenia...) ►In any case Germany is willing to contribute up to 60.5M€ in cash earmarked for accelerator components Accelerator Current acc. EoIs M€ German cash commitment 60.5 Accelerator funding is secure! Status Expression of Interest for the Accelerators

March, 10, 2009AFI and STI Meeting in Bonn, Zbigniew Majka 8

CBM Collaboration Meeting - Zbigniew Majka 9 Several possible selection criteria were discussed: STI chose the approach to take into consideration the interests of all countries and suggests to guarantee each of the partners a certain contribution to experiments

CBM Collaboration Meeting - Zbigniew Majka10 Table 1

CBM Collaboration Meeting - Zbigniew Majka11 Cost of the FAIR Start Version is 940 MEuro ( 2005 prices / CostBook 5) Considering accelerator construction -, civil construction -, and personell costs, only 78 MEuro were left over to assure a minimum base for guaranteed funding of the approved experiments program within the FAIR Start Version budget. Declared intentions by experiment collaborations to apply for funding amount, however, to 185 MEuro and correspondingly high were announced contributions to the FAIR experiments by the partner countries. Only France and Italy declared that they do not want their contribution to experiments recognised as FAIR construction costs.

FAIR Newsletter No. 12 April 2009 FAIR Scientific Director appointed A Search Committee for choosing a FAIR Scientific director, composed of Chairman Jacek T. Gierlinski, Prof. Witek Nazarewicz (Poland), Prof. V. S. Ramamurthy (India), Dr. Beatrix Vierkorn-Rudolph (Germany, BMBF) and Prof. Oleg O. Patarakin (Russia) announced their outcome at the latest ISC meeting in April: They will recommend Prof. Boris Yu. Sharkov (Institute of Theoretical and Experimental Physics (ITEP) in Moscow to the future FAIR Company’s Council for the position of the FAIR Scientific Director. Following this, Dr. B. Vierkorn-Rudolph, Director at the German Ministry of Education and Research (BMBF), suggested that GSI may offer Prof. Sharkov a position in the FAIR Joint Core Team with immediate effect. This is to involve Prof. Sharkov early and actively in the business of the FAIR project and to speed up the preparation process for establishment of the Company. Prof. Sharkov has agreed to get in touch with the Ministry on this matter. Prof. Boris Yu. Sharkov