Why this workshop? 1) To review the ATLAS and CMS upgrade strategies and plans. 2) Explore areas of technology where common approaches can be adopted.

Slides:



Advertisements
Similar presentations
Radiation damage in silicon sensors
Advertisements

Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Andrei Nomerotski 1 3D ISIS : Different approach to ISIS Andrei Nomerotski, LCFI Collaboration Meeting Bristol, 20 June 2006 Outline  What is 3D ? u Reviewed.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
ACES Workshop 3-4 March, 2009 W. Dabrowski Serial power circuitry in the ABC-Next and FE-I4 chips W. Dabrowski Faculty of Physics and Applied Computer.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Advantages & Disadvantages of DC-DC Conversion Schemes Power Task Force Summary Meeting January 30 th, 2009 Katja Klein 1. Physikalisches Institut B RWTH.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers M. Bochenek 1,2, W. Dąbrowski 2, F. Faccio 1, S. Michelis 1 1. CERN, Conseil Européen.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Si Pixel Tracking Detectors Introduction Sensor Readout Chip Mechanical Issues Performance -Diamond.
Avogadro-Scale Engineering: Form and Function MIT, November 18, Three Dimensional Integrated Circuits C.S. Tan, A. Fan, K.N. Chen, S. Das, N.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Silicon – On - Insulator (SOI). SOI is a very attractive technology for large volume integrated circuit production and is particularly good for low –
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
Nov. 10, 2005UCSC US ATLAS Upgrade meeting -- Ely, Garcia-Sciveres1 DC to DC Power Converion R. Ely and M. Garcia-Sciveres Atlas Upgrade Workshop Santa.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Developments on power transfer at CERN (DC-DC converters) Philippe Farthouat CERN.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
VIP1: a 3D Integrated Circuit for Pixel Applications in High Energy Physics Jim Hoff*, Grzegorz Deptuch, Tom Zimmerman, Ray Yarema - Fermilab *
Foundry Characteristics
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
1 Possible integrated solutions to the power distribution puzzle in LHC upgrades F.Faccio, S.Michelis CERN – PH/MIC.
20 Mar 2007ACES workshop -- Switched Capacitors -- M. Garcia-Sciveres1 Switched Capacitor DC-DC converters Peter Denes, Bob Ely, Maurice Garcia-Sciveres.
1 FNAL Pixel R&D Status R. Lipton Brief overview due to 3 failed MS Powerpoint versions –3D electronics New technologies for vertical integration of electronics.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
UK Activities on pixels. Adrian Bevan 1, Jamie Crooks 2, Andrew Lintern 2, Andy Nichols 2, Marcel Stanitzki 2, Renato Turchetta 2, Fergus Wilson 2. 1 Queen.
Special Focus Session On CMOS MAPS and 3D Silicon R. Yarema On Behalf of Fermilab Pixel Development Group.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Compilation of Dis-/Advantages of DC-DC Conversion Schemes Power Task Force Meeting December 16 th, 2008 Katja Klein 1. Physikalisches Institut B RWTH.
LHCb Vertex Detector and Beetle Chip
Round Table discussion We prepared single slides covering –Power –Control/links –Tracker Architectures –Technologies –Trigger/DAQ –Design Libraries –Frameworks.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
EMCal Sensor Status (* M. Breidenbach*,
Rutherford Appleton Laboratory Particle Physics Department 1 Serial Powering Scheme Peter W Phillips STFC Rutherford Appleton Laboratory On behalf of RAL.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
CMOS FABRICATION.
Rd07 Conference th June 2007 Florence, Italy 1 High frequency stepdown DC-DC converter with switched capacitors This work is part of the INFN DACEL.
Giulio Pellegrini 27th RD50 Workshop (CERN) 2-4 December 2015 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona 1 Status of.
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Pixel Meeting Nov 7, Status Update on Sensors and 3D Introduction Laser Annealed HPK sensors MIT-LL thinned sensors SOI devices –OKI –ASI 3D assembly.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
Low Mass, Radiation Hard Vertex Detectors R. Lipton, Fermilab Future experiments will require pixelated vertex detectors with radiation hardness superior.
R&D for SLHC detectors at PSI and Geneva CHIPP workshop on the high-energy frontier of particle physics Zürich 6. September 2006 R. Horisberger (Paul Scherrer.
1 S. Michelis Inductor-based switching converter for low voltage power distribution in LHC upgrades S. Michelis, F. Faccio, A. Marchioro – PH/ESE/ME Twepp07.
TILC08, Sendai, March DEPFET Active Pixel Sensors for the ILC Marcel Vos for the DEPFET Collaboration (
30 Mar 2007SiD tracking meeting -- Powering -- M. Garcia-Sciveres1 Power distribution R&D for ATLAS sLHC upgrades Maurice Garcia-Sciveres Lawrence Berkeley.
Straw man layout for ATLAS ID for SLHC
ATLAS-MUON Trigger hardware developments
Hybrid Pixel R&D and Interconnect Technologies
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
Grounding, Power Distribution
Presentation transcript:

Why this workshop? 1) To review the ATLAS and CMS upgrade strategies and plans. 2) Explore areas of technology where common approaches can be adopted. 3) Plan for potential common Research and Development.

new upgrade bunch structures 25 ns 50 ns nominal 25 ns ultimate & 25-ns upgrade 50-ns upgrade, no 50 ns 50-ns upgrade with 25- ns collisions in LHCb 25 ns new alternative! new baseline! SLHC ( ~ 2014) peak luminosity upto 1.5 ● cm -2 sec -1 (10X of LHC)

Summary of the machine upgrade. two scenarios of L~10 35 cm -2 s -1 for which heat load and #events/crossing are acceptable 25-ns option: pushes  *; requires slim magnets inside detector, crab cavities, & Nb 3 Sn quadrupoles and/or Q0 doublet; attractive if total beam current is limited; transformed to a 50-ns spacing by keeping only 1/2 the number of bunches 50-ns option: has fewer longer bunches of higher charge ; can be realized with NbTi technology if needed ; compatible with LHCb ; open issues are SPS & beam-beam effects at large Piwinski angle; luminosity leveling may be done via bunch length and via  * b

Changes required in ATLAS (Nigel Hessey). Beampipe. - Currently central part of ATLAS beampipe is Beryllium (Be), rest is Stainless Steel (SS) - SS gives large backgrounds, especially to muon system - SS gets activated - Change to Al for ~ Change to all Be for SLHC - Be is expensive compared to SS, but cheap compared to muon chambers! It gives a big reduction in background in critical areas of muon system (factor 2 or better). Muon chamber. If at low end and Be beampipe, most of MDT system can remain At higher end, large fraction of MDT system needs replaced Occupancy makes efficiency reduce to 50 % MDT Electronics needs upgrading For radiation damage For data rates Also considering reading out only regions with a trigger. Radiation damage, pile-up problem, power budget, material budget are important issues.

Changes required in ATLAS (Nigel Hessey). Inner Detector -TRT straws cannot cope with the rate -Silicon Strips will be suffering from radiation damage and have too high occupancy -Pixel (renewed) b-layer and the other 2 layers will be radiation damaged All Inner Tracker to be replaced !!! - All silicon tracker Pixels + short strips (SS) + long strips (LS) “Strawman” layout decided on (a straw man is easy to change) 4 pixel layers 3 short strip (SS) layers 2 long strip (LS) layers

On-detector power dissipation. Power IN → cables (material). Power OUT → cooling pipes (material ). FARTHOUAT, PhilippeFARTHOUAT, Philippe (CERN)

SCT| SLHC 8V|  2V 4V|  1V 0V| 0V Chain of modules at different voltages; “recycle” current Chips on a module are connected in parallel (as usual) Analog ground, digital ground and HV ground are tied together for each module (as usual)  floating HV supplies AC-coupled read-out !!! Serial powering. Current source (external power supply) Marc Weber, RAL

F.Faccio (CERN) 8 AC/DCDC/DC Module (with DC/DC) 0.5-2m 100m 24 or 48 V High voltage vs Low current = Low power loss P = I 2 ● R long wire PP Important considerations: Magnetic field, Radiation and Material Budget, Noise, plus EMI if inductor-based DC/DC Inductor-based DC-DC converter. 8 Aiming at demonstrating the feasibility of a fully integrated (except L and passive components) DC-DC buck converter Vin=12-24 V Vout=1.5-3V I=1-2A high-V CMOS technology with radiation tolerant design air core inductor Switching noise Controller architecture 1.5 or 3 V Low voltage vs High current

Switched Capacitor DC-DC converters. Maurice Garcia-Sciveres (Lawrence Berkeley National Laboratory) Phase 1 - Charge Load Vd Load Phase 2 - Discharge -Same 50V 0.35  m HV CMOS process -Sized for 1A output. 4.3 x 4.9 mm - Contains auxiliary circuits. - All capacitors external - All clocks external

VLSI technology choice. - IBM 130 nm CMOS has been found suitable for SHLC upgrade. -It is radiation hard enough therefore we can use commercial libraries for the most of the digital blocks. - Moreover, this technology has a lot of attractive desing features. - CERN has signed a long-term contract with IBM covering both 130nm and 90 nm technologies. - MIC group of CERN is ready to organize MPW runs if there will be sufficient participants in high-energy physics community. - Some ATLAS group are about to start redesign of their present front-end chips into IBM CMOS 130nm technology. These are: 1) ATLAS Pixel Detector Front-end chip (K. Einsweiler, LBNL). 2) ATLAS Strip Detector Front-end chip ABC-N (W. Dabrowski, Krakow).

Digital – Memories (SEU tolerant), serializers – PLL, DLL frequency multipliers – Slow control protocol (target low power + SEU tolerance) – LVDS drivers : customized for minimal power / standard ? – Codecs : Analog – Bandgap, we are involved – voltage regulators, – DAC, temperature monitoring – ADCs : what power/#bits/speed ? – For when the Universal preamp, tunable by slow control ?? Consensus to carefully minimize power – Is it compatible with « standard » cells? Based on IBM 0.13 µm. Portability to other technologies ? IP documentation, responsibility, maintenance ?? – Regular workshops Common IP blocks in the Design Library.

3D and SOI Technology for Future Pixel Detectors Ray Yarema Fermilab Common ATLAS CMS Electronics Workshop At CERN March 19-21, 2007

Active Pixel Sensor in SOI 0.15  m Fully-Depleted SOI CMOS process, 1 Poly, 5 Metal layers (OKI Electric Industry Co. Ltd.). PMOS and NMOS transistors Detector signal Is proportional To substrate thickness Thin top layer has silicon islands in which PMOS and NMOS transistors are built. A buried oxide layer (BOX) separates the top layer from the substrate. The high resistivity substrate forms the detector volume. The diode implants are formed beneath the BOX and connected by vias. Advantages: * 100% fill factor * NMOS + PMOS transistors * Large signal * Faster charge collection Charge released along track Buried oxide 200 nm Monolithic Active Pixel Sensors (MAPS)

0.18  m partially-Depleted dual gate SOI CMOS process,Dual gate transistor (Flexfet), No poly, 5 metal (American Semicondutor / Cypress Semiconductor.) ASI Process ASI process based on dual gate transistor called a Flexfet. 4 – Flexfet has a top and bottom gate. – Bottom gate shields the transistor channel from charge build up in the BOX caused by radiation. – Bottom gate also shields the transistor channel from voltage on the substrate and thus removes the back gate voltage problem.

15 Vertical Scale Integration (3D) – Increased circuit density due to multiple tiers of electronics – Independent control of substrate materials for each of the tiers. – Ability to mate various technologies in a monolithic assembly DEPFET + CMOS or SOI CCD + CMOS or SOI MAPS + CMOS or SOI Reduce R, L, C for higher speed Reduce chip I/O pads Provide increased functionality Reduce interconnect power and crosstalk

3D Stack with Vias High resistivity substrate BOX Vias: 1.5 um dia by 7.3 um long Tier 1 Tier 2 Tier 3 Pixel cell: *175 transistors in 20 µm pixel. *Unlimited use of PMOS and NMOS. *Allows 100 % diode fill factor. 20 um Via using oxide etch process (Lincoln Labs) Typical diameters are 1-2 microns

Two Different 3D Approaches for HEP Die to Wafer bonding – Permits use of different size wafers – Lends itself to using KGD (Known Good Die) for higher yields Wafer to Wafer bonding – Must have same size wafers – Less material handling but lower overall yield Die to wafer bonding KGD Wafer to wafer bonding Dice/test

Key Technologies Through wafer vias typically have an 8 to 1 aspect ratio. In order to keep the area associated with the via as small as possible, the wafers should be thinned as much as possible. Thinning is typically done by a combination of grinding, lapping, and chemical or plasma etching. 2) Wafer thinning Photos from MIT LL Six inch wafer thinned to 6 microns and mounted to 3 mil kapton.