1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
Operational Experience of system Protection Scheme of Talcher – Kolar HVDC Link.
PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.
HVDC Challenges in Grid Operation
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
POWER GRID CORPORATION OF INDIA LTD.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
UI SUMMARY BOTTLENECKS IN SR GRID RECENT GRID DISTURBANCES MERIT ORDER OCC PRESENTATION FGMO KAR DISTURBANCE REDUCING THE LOSSES IN GRID BUYING AND SELLING.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
SPECIAL PROTECTION SCHEME FOR KOODANKULAM
ISSUE OF CONCERN.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
Presentation transcript:

POWER GRID CORPORATION OF INDIA LTD GRID EVENTS AND ISSUES in 139TH SREB MEETING 19TH DECEMBER 2005 HYDERABAD SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LTD

HIGH VOLTAGE OPERATION 139th SREB - 19 – DEC – 05. FREQ DURATION CURVE LOAD DURATION CURVE SEP-05,OCT 05, NOV-05 VOLTAGE PROFILE SEP -05 OCT -05 NOV -05 DEMAND INDICES TALCHER - KOLAR SCH Vs DRWL EVENTS HYDRO GENERATION COMP.. 2003-04-05 MAX, MIN & AVG STATE DRAWAL RESERVOIR POSITION HIGH VOLTAGE OPERATION 01-02 NOV 05 HIGH FREQ OPERATION FGMO (FREQ 48.54Hz) 28-NOV-05 FGMO SUMMARY KAIGA TRIPPING 07-NOV-05 FREQUENCY PENALTY SCHEME FORMATION OF RPC TALCHER – KOLAR INTER TRIP GEN. TRIPPING AT KAIGA & KODASALLI ADV. USING CHIKKODI - KOLHAPUR EVACUATION OF NEW GENERATION

Next NOV-05 NOV-04 In HZ <49 <49.5 49-50.5 >50.0 >50.5 Avg Freq Nov-05 0.12 1.58 98.24 78.60 1.64 50.11 Nov-04 0.33 8.04 99.63 17.76 0.04 49.80 NOV-05 NOV-04 0 10 20 30 40 50 60 70 80 90 100 Next

OCT-05 NOV-05 NOV-04 In HZ <49 <49.5 49-50.5 >50.0 >50.5 Avg Freq Nov-05 0.12 1.58 98.24 78.60 1.64 50.11 Nov-04 0.33 8.04 99.63 17.76 0.04 49.80 Oct-05 0.00 0.03 97.47 96.04 2.53 50.22 OCT-05 NOV-05 NOV-04 0 10 20 30 40 50 60 70 80 90 100

LOAD DURATION CURVE OF SOUTHERN REGION FOR SEP 2005 & SEP 2004 0 10 20 30 40 50 60 70 80 90 100 Next

LOAD DURATION CURVE OF SOUTHERN REGION FOR OCT 2005 & OCT 2004 0 10 20 30 40 50 60 70 80 90 100 Next

LOAD DURATION CURVE OF SOUTHERN REGION FOR NOV 2005 & NOV 2004 0 10 20 30 40 50 60 70 80 90 100

TALCHER-KOLAR IMPORT OF 23850MUs FROM ER THROUGH TALCHER-KOLAR UPTO NOV - 05 YEAR ---> 2002 2003 2004 2005 MONTHS TOTAL ENERGY (IN MU) MAX FLOW (IN MW) JAN --- 311 850 805 1528 852 1583 FEB 273 1010 701 1508 775 1865 MAR 491 1316 837 1600 884 1507 APR 473 1183 923 1500 878 MAY 172 1026 652 1385 704 JUN 277 994 688 1416 691 1605 JUL 319 1075 759 1490 1254 1880 AUG 346 1088 628 1341 857 SEP 6 200 512 1533 742 1552 732 1881 OCT 58 500 508 1458  829 1550 895 1834 NOV 77 470 1048  719 999 DEC 241 750  630 1383  882 1615 TOTAL 382   4782 9165 9521 AVERAGE 96 399 764 866 MAX FLOW

DEMAND INDICES FOR NOVEMBER 2005 COMPARISON

DEMAND INDICES - COMPARISON   May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 ANDHRA PRADESH LEAN/PEAK 0.80 0.75 0.73 0.71 0.64 AVG/PEAK 0.90 0.92 0.88 0.87 0.89 0.85 KARNATAKA 0.69 0.59 0.58 0.60 0.83 0.78 0.76 0.77 KERALA 0.53 0.51 0.52 0.54 0.70 0.66 0.65 0.67 TAMILNADU 0.79 0.74 0.68 0.61 0.86 SOUTHERN REGION 0.72 0.81

MAJOR EVENTS Continued….. SOUTHERN REGION MET A DEMAND OF 21112MW IN SEPTEMBER 05 (4% RISE OVER LAST YEAR) 33% RISE IN HYDRO STORAGE IN SR COMPARED TO LAST YEAR PER DAY SR HYDRO GENERATION TOUCHED 172.39MUS. MORE AND MORE STOA TRANSACTIONS SALE OF URP OF RSTPS U#7 TO PSEB COMMENCED FROM 21ST SEP 05 SOUTHERN REGION MET A DEMAND OF 21268MW IN OCTOBER (4.6% RISE OVER LAST YEAR) 37% RISE IN HYDRO STORAGE IN SR COMPARED TO LAST YEAR ON 17TH OCT 05 400KV N’SAGAR – RAICHUR LINE LILOED AT MAHABOOBNAGAR S/S OF APTRANSCO 400KV N’SAGAR-MAHABOOBNAGAR 400KV MAHABOOBNAGAR-RAICHUR 400/220KV , 1 x 315MVA ICT COMMISSIONED AT MAHABOOBNAGAR S/S OF APTRANSCO ON 18TH OCT 05 Continued…..

MAJOR EVENTS (Continued ….) 400/220KV , 315 MVA ICT SYNCHRONISED AT NARENDRA S/S OF POWERGRID ON 28TH OCT 05 400KV KAIGA-NARENDRA DC LINES SYNCHRONISED ON 28TH OCT 05 400KV KAIGA-NARENDRA DC LINES ALONGWITH 400/220KV, 1 x 315 MVA ICT AT NARENDRA S/S COMMERCIAL OPERATION FROM 1ST NOV 05 SOUTHERN REGION MET A DEMAND OF 20,736MW IN NOV–05. (3% RISE OVER LAST YEAR) 38% RISE IN HYDRO STORAGE IN SR COMPARED TO LAST YEAR

MAXIMUM & MINIMUM DRAWAL IN MW NOV-05 STATE AVG DRAWAL MAX DRAWAL NOV 05 TILL NOW ENTITLEMENT MIN DRAWAL NOV 05 TILL NOW AP 950 1580 2180 1459 - 80 - 1070 KAR 735 1450 2410 1417 -170 - 170 KER 600 970 1120 1148 50 -301 TN 1500 2500 2990 2361 380 - 100 PONDY 160 210 235 304 60 10 JUN-05 AUG-04 NOV-05 MAY 05 SEP-05 APR-05 JUL 05 OCT-03 OCT-04 APR-04

IMPLEMENTED SCHEME TO ENSURE GRID STABILITY BOTH POLES WERE HEALTHY AND ONE POLE GOES OUT INSTANT TRIPPING OF UNIT #6, (ONE OF THE FOUR STAGE-II UNITS) IF EX BUS GENERATION IS MORE THAN 1700MW BOTH POLES WERE HEALTHY AND BOTH POLES GO OUT IF EX BUS GENERATION IS MORE THAN 1100 MW UNITS #5 & #6 TRIPPED INSTANTANEOUSLY UNIT #4 TRIPPED AFTER 250 m sec IF EX BUS GENERATION IS MORE THAN 550 MW UNIT # 5 TRIPPED INSTANTANEOUSLY UNIT # 4 TRIPPED AFTER 250 m sec UNIT # 6 TRIPPED AFTER 500 m sec NOTE: STAGGERED TRIPPING IS ADOPTED TO ALLOW THE POWER SUMMATED SIGNAL RESETTING Continue ……

Continue ……

Inter Trip Scheme Continue ……

HIGH SPEED INTER-TRIP SCHEME AT KOLAR TO TALCHER KURNOOL SOMYAZULA PALLI GOOTY CUDDAPAH KOLAR SOMANHALLI SPBDR HOODY HOSUR PONDICHERY SALEM BAHOOR NLC II NLC -1 EXP. TRICHUR TRICHY UDUMALPET MADURAI Continue ……

HIGH SPEED INTER-TRIP SCHEME AT KOLAR MODE OF OPERATION POWER LEVEL FOR GENERATING INTERTRIP SIGNAL MONO POLAR >400 MW AND THE POLE TRIPS BI-POLAR IF BOTH POLE ARE CARRYING > 800 MW EACH AND ONE POLE TRIPS IF EACH POLE IS CARRYING POWER IN THE RANGE OF 400 TO 800 MW AND ONE POLE TRIPS AND AFTER THE DELAY OF 2 SECS THE POWER ON SURVIVING POLE IS LESS THAN 600MW IF POWER FLOW ON EACH POLE > 200 MW AND BOTH POLES TRIP WITH IN 2 SECS

KADAMPARAI GENERATION/PUMP ENERGY FROM JAN - 2003   2003 2004 2005 GENERATOR MODE PUMP MODE JAN 39 38 44 58 FEB 46 21 MAR 32 51 6 18 APR 35 40 26 3 MAY 37 43 41 48 30 JUN 29 45 55 JUL 47 49 50 79 62 AUG 54 25 SEP 36 15 OCT NOV 23 24 64 59 DEC 53 TOTAL 446 507 328 330 356 306

RESERVOIR LEVEL - COMPARISON LEVEL IN MTS LEVEL 30-Nov-04 30-Nov-05 JALAPUT 836.14 837.58 LINGANMAKKI 548.56 553.04 SUPA 540.40 559.57 IDUKKI 722.87 729.50 KAKKI 972.35 979.60 NILGIRIS TOTAL ENERGY 30-Nov-04 30-Nov-05 RISE IN MU % RISE 438 501 63 14 2698 4106 1408 52 1781 2759 978 55 1407 1946 538 38 609 829 220 36 1459 1442 17 1 8393 11584 3190

KAIGA TRIPPING ON 07th NOV 05 AT 16:18HRS, HUBLI BUS BECAME DEAD DUE TO INSULATOR BURST AT HUBLI ON 220KV HUBLI-LINGAPUR. KPTCL DETAILS 2. 400KV KAIGA-GUTTUR WAS ALREADY OUT. NAGJHERI & KAIGA GENERATION WAS AROUND 800MW. CHIKKODI, BELGAUM, NARENDRA, AMBEWADI & GOA LOADS ARE AROUND 250-300MW. POWER RUSHED TO GUTTUR THROUGH 220KV KAIGA-GUTTUR LINE. AT 16:21HRS, 220KV KAIGA-GUTTUR LINE ALONG WITH KAIGA UNITS TRIPPED. KAIGA & NAGJHERI COMPLEX FREQUENCY SHOOT UP TO 52.6HZ. SUBSEQUENTLY ALL UNITS @ NAGJHERI WERE TRIPPED AT 16:33HRS. SCADA

AP KAR TN Next KER List ORISSA MAHARASHTRA STATUS OF 400 KV LINES OF SR AS ON DATE 02-NOV-05 ORISSA TALCHER BHADRAVATI JEYPORE MAHARASHTRA AP SIMHADRI NTPC RSTPP KALPAKKA KHAMMAM P GAZUWAKA (POWERGRID) MMDP HYDERABAD P P P MAHABOOB NAGAR P NARENDRA N’SAGAR VIJAYAWADA KAR RAICHUR P KURNOOL MUNIRABAD SSLMM P KAIGA N SIRSI P GOOTY CUDDAPAH GUTTUR P NELLORE 1000 MW HVDC BACK TO BACK LINK HIRIYUR TALGUPPA NELAMANGALA 2000 MW HVDC BIPOLE BANGALORE P MADRAS KOLAR P HOODY HOSUR 500 KV HVDC LINE 400 KV LINE POWERGRID SALEM NEYVELI 400 KV LINE APTRANSCO TN UDUMALPET P TRICHY NEYVELI TPS – 1 (EXP) EXP 400 KV LINE KPTCL TRICHUR P 400 KV LINE OPERATED AT 220 KV MADURAI Next THERMAL GENERATING STATION KER List 400KV SUB-STATION THIRUVANANTHAPURAM

ADVANTAGES OF MADURAI-TRIVANDRUM LINE ALTERNATE SUPPLY PATH TO TRIVANDRUM AREA INCREASED STABILITY OF S.KERALA SYSTEM DECREASED LOSSES IMPROVED TRANSFER MARGIN – FACILITATING BETTER MERIT ORDER OPERATION AND ECONOMY

THE ISSUES OF CONCERN Next HIGH VOLTAGE AT TRIVANDRUM TRIPPING OF ICT ON V/F AT NIGHT RISK OF TRIPPING OF LINE CONTINUED HIGH LOADING ON 220 KV EDAMON-KAYATHAR PREVENTING FURTHER DECREASE IN GENERATION IN KSEB SYSTEM Next

ADVANTAGES OF COMMISSIONING 400 KV KAIGA NARENDRA D/C LINE KOLHAPUR (MAHARASHTRA) ADVANTAGES OF COMMISSIONING 400 KV KAIGA NARENDRA D/C LINE CHIKKODI KARNATAKA M.L.PURA BELGAUM MAPUSA NARENDRA 220 PONDA (Goa) AMBEWADI XELDEM(GOA) HUBLI KODASALLI KADRA NAGJHARI GUTTUR KAIGA Next NOT TO SCALE DISTANCES EXAGERATED FOR CONVENIENCE

ADVANTAGES OF COMMISSIONING 400 KV KAIGA-NARENDRA D/C LINE PROVIDES ALTERNATE PATH FOR EVACUATION OF KAIGA GENERATION IN CASE OF CONTINGENCY LINE IS ON DIFFERENT ROUTE FROM THAT OF KAIGA-GUTTUR ENHANCED REDUNDANCY AND RELIABILITY

Inter Regional Links Present IR Capacity = 9,500 MW 1650 MW 700 MW 2300 16,000 1200 MW 32,700 MW 1200MW Present IR Capacity = 9,500 MW 34,500 MW 2000MW

400 KV LINE PRESENTLY OPERATED AT 220 KV GRID MAP TALCHER BHADRAVATI TYPICAL FLOWS ARE FROM NORTH TO SOUTH JEYPORE 178x2 2x221 SIMHADRI NTPC 8x4 RSTPP 400 KV LINE PRESENTLY OPERATED AT 220 KV 1 GAZUWAKA(AP) 189 301x2 15x2 187 P 195 267x2 VISAKHAPATNAM (POWERGRID) HYDERABAD KHAMMAM P 197x2 P 115 317 P MMDP 155 P 146x2 221x2 VIJAYAWADA RAICHUR 258 P NAGARJUNASAGAR Nagjhari KURNOOL 172 279 ABOUT 12000 CKM 400KV TRANSMISSION GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC 308 MUNIRABAD SSLMM KODASAALY P 277 KAIGA 52x2 N SIRSI 120 P GOOTY 60 CUDDAPAH DAVANAGERE P 300 NELLORE KADRA 302 173 HIRIYUR 330 242 NELAMANGALA 28 BANGALORE ALMATHI HOODY P KOLAR MADRAS P TALGUPPA HOSUR MAPS 182 181 63 175 SALEM PONDICHERY P NEYVELI 54 179 151 164x2 UDUMALPET QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW P TRICHY 130x2 TRICHUR P P 127 130x2 P MADURAI PALLOM EDAMON THIRNELVALI KAYANKULAM 2x78 THIRUVANATHAPURAM KOODANKULAM

INTER REGIONAL LINKS TALCHER KOLAR HVDC LINE LENGTH:100 KMS TALCHER ORISSA) KOLAR (KARNATAKA) HVDC STATION

TALCHER KOLAR SCHEMATIC Electrode Station Electrode Station KOLAR +/- 500 KV DC line 1370 KM Kolar 400kv System 220kv system Hosur Hoody B’lore Chintamani Salem Madras Cudappah Udumalpet

SUMMARY OF UI – 153WKS (FROM 01/JAN/03 TO 04/DEC/05) AP KAR KER TN PONDY Total UI exported(-) / Imported(+) in MUs -4688 4734 679 1702 -199 Total amount paid in Crores Rs. -899 862 117 448 -36 Average rate of UI in paise/unit 192 182 173 263 183

TOTAL UI AMOUNT DISBURSED:- 1933 CR AVG WEEKLY TRANSACTION:- 66 MU UI IN SR (FROM 01/01/03 TO 04/12/05) TOTAL UI TURNOVER :- 10141 MU TOTAL UI AMOUNT DISBURSED:- 1933 CR AVG WEEKLY TRANSACTION:- 66 MU AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR

Back

INTER-REGIONAL EXCHANGES DETAILS UPTO 151 WKS (Till 20.11.05) WR ER Net Energy Transaction 57.5 MU IMPORT BY SR 493.9MU Amount Due to SR Constituents Rs. 79.7 Cr. Rs. 24.5 Cr.* Amount Credited TO SR Constituents Rs. 76.2 Cr. Rs. 24.5 Cr. *from 06.09.04 (when ER exchanges computed @ respective frequencies)

MW MVAR

MW MVAR

MW MVAR

STEPS TAKEN TO CONTAIN OVER VOLTAGE TRANSFORMER TAP CHANGES MANY ICT TAPS WERE CHANGED ON 400/220 ICT’s GT TAP CHANGES GENERATORS ON SYNCH CONDENSOR MODE NETWORK MANIPULATION UPTO 40 LINES KEPT OUT TO CONTROL HV DURING LEAN SEASON EVEN DURING PEAK, SRISAILAM LINES ARE KEPT OPEN TO CONTROL HIGH VOLTAGE TAKING OUT THE LINE AND CONVERTING LINE REACTOR TO BUS REACTOR UTILISATION OF HYBRID AC/DC NETWORK DIVERSION OF TALCHER STAGE 2 POWER THROUGH GAJUWAKA

GENERATORS ON SYNCH CONDENSOR MODE: ADVANTAGES IMPROVED SHORT CIRCUIT LEVELS CAN BE CONVERTED TO GENERATOR MODE IN SHORT NOTICE EXCELLENT REACTIVE SOURCE REDUCED LOSSES CONTROL VOLTAGE FLUCTUATIONS NEXT: IDUKKI 3 QUADRANT OPN

3 QUADRANT OPERATION MW MVAR

SYNCHRONOUS CONDENSOR OPERATION: IN OPERATION S. No Name of the Generator Unit No Installed capacity (In MW) Remarks 1 N'Sagar 2 100 Running 3 4 5 6 7 SriSailam LBPH 150 Tested 8 9 10 11 12 Iddukki 130 13 14

SYNCHRONOUS CONDENSOR OPERATION: POSSIBLE AT SL.NO. POWER STATION INSTALLED CAPACITY TYPE OF SCHEME TYPE OF TURBINE 1 SHARAVATHI 10x103.5 1035 S V.PELTON 2 JOG 4x18+4x12 120 3 VARAHI 2x115 230 4 KUTTIADI 3x25 75 PELTON 5 KUTTIADI EXTENTION 1x50 50   6 PALLIVASAL 3x7.5+3x4 37.5 7 SENGULAM 4x12 48 R 8 SABARIGIRI 6x50 300 9 IDUKKI 3x130+3x130 780 PEPPARA PELTON 10 S 3 3

SHORT TERM OPEN ACCESS TOTAL TRANSACTION APPROVED = 105 ENERGY TRANSACTED = 717 MUs SRLDC CHARGES COLLECTED = 19.2 LAKHS TRANSMISSION CHARGES COLLECTED = 10.2 CRS DATE :12th Oct 2004

LIST OF GENERATORS WITH PELTON TURBINE

LIST OF LINE REACTORS THAT CAN BE USED AS BUS REACTOR Note : Matter taken up with SRTS I & II to confirm on voltage switching.

KOODANKULAM EVACUATION 400 KV D/C QUAD LINE TO TIRUNELVELI 2nd 400 KV D/C QUAD TO TIRUNELVELI ON SEPARATE ROUTE LILO OF 400 KV D/C MADURAI-TRIVANDRUM @ TIRUNELVELI 400 KV D/C TIRUNELVELI-UDUMALPET LINE 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE 400 KV D/C TIRUNELVELI-EDAMON LINE 400 KV D/C TIRUNELVELI-COCHIN-THRISSUR LINE AND THE 400 KV D/C TIRUNELVELI-EDAMON LINE WOULD BE ON THE SAME MULTI-CIRCUIT TOWER USING ROW OF EXISTING 220 KV EDAMON-KAYATHAR LINE. 400 KV D/C TIRUNELVELI-EDAMON LINE TO BE CHARGED AT 220 KV INITIALLY. 400 KV D/C TIRUNELVELI-EDAMON LINE WOULD LATER BE EXTENDED TO TRIVANDRUM

MULTI-CIRCUIT TOWER ON 220 KV EDAMON-KAYATHAR CORRIDOR NLMNG CHITOOR KOLAR HOODY ALMATHI HASSAN SP-BUDUR S’HALLI HOSUR MELKOTTAIYUR MYSORE BAHOOR KOZHIKODE SALEM NEYVELI ARASUR NLY-EXP PUGALUR JAYAMKONDAM THRISSUR UDUMALPET TRICHY KARAIKUDI COCHIN MADURAI MULTI-CIRCUIT TOWER ON 220 KV EDAMON-KAYATHAR CORRIDOR EDAMON KOODANKULAM TRANSMISSION SYSTEM AS APPROVED IN 17TH STANDING COMMITTEE MEETING HELD AT BANGALORE IN SEP03 TIRUNELVELI TRIVANDRUM KOODANKULAM

TALCHER-KOLAR IMPORT OF 23850MUs FROM ER THROUGH TALCHER-KOLAR UPTO NOV - 05 YEAR ---> 2002 2003 2004 2005 MONTHS TOTAL ENERGY (IN MU) MAX FLOW (IN MW) JAN --- 311 850 805 1528 852 1583 FEB 273 1010 701 1508 775 1865 MAR 491 1316 837 1600 884 1507 APR 473 1183 923 1500 878 MAY 172 1026 652 1385 704 JUN 277 994 688 1416 691 1605 JUL 319 1075 759 1490 1254 1880 AUG 346 1088 628 1341 857 SEP 6 200 512 1533 742 1552 732 1881 OCT 58 500 508 1458  829 1550 895 1834 NOV 77 470 1048  719 999 DEC 241 750  630 1383  882 1615 TOTAL 382   4782 9165 9521 AVERAGE 96 399 764 866 MAX FLOW

PRESENT KOLAR INTER TRIP LOGIC COMMISSIONED ON 18.04.2003 CONDITIONS BEING CONSIDERED FOR TRIPPING OF 220 KV LINES ON TRIPPING OF TALCHER-KOLAR HVDC POLE(S) MONOPOLAR OPERATION: If the pole power one second prior to trip was more than 400 MW, we extend the inter-trip. BIPOLAR OPERATION: (2A) If both poles were carrying power in excess of 200 MW and both poles trip within a time span of 2 sec, we extend inter-trip. (2B) If both poles were carrying power in excess of 800 MW and any one of the poles trips, we extend inter-trip irrespective of power compensation by the surviving pole. (2C) If each pole was carrying power in the range of 400 MW to 800MW and one pole trips, no trip is extended if after a delay of 2 sec the power of surviving pole is more than 600 MW.

PRESENT INTER-TRIP POINTS 1) Chinakampally 5) Hosur 2) Kolar ICT 6) Sriperumbudur 3) Hoody 7) Salem 4) Somanahalli

SUGGESTED SCHEME: TRIP SIGNAL 1 Trip Signal 1 would be initiated under any one of the following two conditions: If loss of power flow on the HVDC link at any instant compared with the power flow 2 seconds prior to current instant is more than 500 MW but less than or equal to 1000 MW. If one of the HVDC pole block on a line fault and the power flow on the HVDC link just prior to that instant was more than 1000 MW but less than or equal to 1500 MW.

SUGGESTED SCHEME: TRIP SIGNAL 2 Trip Signal 2 would be initiated to obtain an additional relief of around 800 MW (in addition to 700 MW from Trip Signal 1) : If loss of power flow on the HVDC link at any instant compared with the power flow 2 seconds prior to current instant is more than 1000 MW. If one of the HVDC pole block on a line fault and the power flow on the HVDC link just prior to that instant was more than 1500 MW. Note: In the event of occurrence of Trip signal 2, the total relief would be of the order of around 1500 MW.

TRIP SIGNAL 1: POINTS STATE SUBSTATIONS RELIEF (MW) REMARKS A.P CHINAKAMPALLI 150 EARLIER THE SIGNAL WAS BEING SENT BY PLCC. NOW IT IS PROPOSED TO SEND THIS SIGNAL THROUGH WIDE BAND. KARNATAKA KOLAR ICT 250 THROUGH LOCAL PILOT WIRING HOODY THROUGH PLCC TAMIL NADU HOSUR 300 SRIPERUMBUDUR SALEM

TRIP SIGNAL 2: POINTS STATE SUBSTATIONS RELIEF (MW) REMARKS A.P GOOTY SWITCHING STATION 200 SIGNAL WILL BE SENT THROUGH WIDE BAND ANANTHAPUR -DO- SOMAYAJULAPALLI KURNOOL KARNATAKA SOMANAHALLI EARLIER THE SIGNAL WAS BEING SENT BY PLCC. NOW IT IS PROPOSED TO SEND THIS SIGNAL THROUGH WIDE BAND. KERALA TRICHUR NORTH KOZHIKODE TAMIL NADU MADURAI KARAIKUDI THIRUVARUR TRICHY 230 INGUR

INTER-TRIP SCHEME TRIP SIGNAL 1 WILL BE SENT TO SOMANAHALLI REDUCTION IN POWER > 500&<1000MW SIGNAL A TRIP SIGNAL 1 WILL BE SENT TO SOMANAHALLI CHINKAMPALLI KOLAR ICT HOODY SRIPERUMBUDUR SALEM HOSUR THROUGH PLCC THROUGH WIDE BAND POWER FLOW >1000&<1500MW AND DC LINE FAULT AND POWER FLOW > 1500MW TRIP SIGNAL 2 SIGNAL B REDUCTION IN POWER > 1000MW AND TRIP SIGNAL 2 WILL BE SENT TO 1 GOOTY ANATHPUR SOMAYAJULUPALLI KURNOOL MADURAI KARAIKUDI TIRUVARUR TRICHY 230 KV INGUR 0 TRICHUR NORTH 1 KOZHIKODE