1 Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits) Gordon Dobson-Mack (Chair) Dynamic Transfer Capability.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
ACE Diversity Interchange (ADI)
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
Marianna Vaiman, V&R Energy
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
PacifiCorp-CAISO EIM Initiative Overview
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Enhanced Curtailment Calculator
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Review of BPA Voltage Control Conference
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
American Electric Power Service Corporation Jan 26, Coordinating Controls across CREZ  What dials are available to the operators?  What are the.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
AESO Export Capability Workshop February 16, 2006 Metropolitan Centre, Calgary.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
1 Progress Report Policies and Procedures Tom Green PCC Salt Lake City July 15, 2014.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
NW Loss of Load Probability James Gall Power Supply Analyst
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
A new Nomogram Development POM- based tool - Application results in the Idaho Power System. Orlando Ciniglio, IPC Marianna Vaiman, V&R Energy WECC TSS.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Dynamic Transfer Limits Study WIST Update 12/17/09 Brian Tuck, BPA.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
© 2015 Portland General Electric. All rights reserved. I NTEGRATED R ESOURCE P LAN 2016 Results of PGE’s EIM Comparative Study OPUC Public Meeting Tuesday,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Interchange Scheduling & Accounting Subcommittee
Borah Mitigators Problem Definition: Sponsor: Idaho Power
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Terry Baker Peak Reliability
Solar Eclipse Overview August 2017
EU-IPA12/CS02 Development of the Renewable Energy Sector
Reliability Assessment Committee Reliability Workshop Priorities
DEC System Voltage Planning - June 2018
Enhanced Curtailment Calculator (ECC)
PacifiCorp-CAISO-NVE EIM Initiative Overview
Reliability Assessment Committee Reliability Workshop Priorities
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Jim Mcintosh Director, Executive Operations Advisor California ISO
Dynamc Transfer Capability Task Force 28 Jan 2011 Phase 1 Update
Presentation transcript:

1 Integration of Variable Generation into the Grid: Need for TVLs (Transfer Variability Limits) Gordon Dobson-Mack (Chair) Dynamic Transfer Capability Task Force Wind Integration Forum – Steering Committee November BCCPG

2 Discuss the need for TVLs and what can be done to increase them Purpose of Presentation

3 1.Variability & its impacts: –Increased variability is a reality for operations; –Dynamic Transfers contribute to variability; –Transfer Variability impacts the grid; –Need Transfers Variability Limits for some systems. 2.DTC Task Force –Mandate & Membership; –Deliverables; 3.What Next? –Questions & Options; Outline

4 BPA’s Installed Wind Source: BPA:

6 NWPP Wind Generation Levels 2010 Coincident Peak Load = 60,200 MW Dec 2010 Installed Wind Gen = 7,800 MW Dec 2012 Installed+Committed Wind Gen = 13,200 MW 2010 Spring Min Load (HE04) = 32,745 MW Source: NWPP & DTC TF: search “DTCTFPhaseFullReport pdf”

7 Source: see slide #3http://

Generation Problem: –Need to maintain Generation Balance; –Want access to least cost & most flexible Ancillary Services Transmission Problem…As well: –Transmission system designed historically for routine predictable changes; –Must be ready to withstand the next worst contingency; –Voltage control and RAS arming are local measures that must be factored into the solution. Generation or Transmission Problem?

9 R L C C CC C Load Transmission Line Transmission Line Physics

10 Maximum TTC, Transmission Tuned Light Load or line open - High Voltage unless reactive switched off Low Voltage: Without added Reactive – could Be a voltage collapse Reactive “Tuning” And Remedial Action Schemes (RAS)

Power - Voltage Curves and Reliability N-1 Limits N-1 Outage Acceptable Voltage Range Voltage Level N-1 Outage Reliability Limits Operating MW Range no Caps in MW Power Level Operating MW Range Caps in Capacitor Switched on Normal N-0

Added Switching Remedial Action Schemes (RAS) RAS arm RAS un-arm Capacitor In Capacitor Out Minutes MW Flow 1850 MW 2050 MW Path flow with VG Traditional tie line flow

13

14 Present Dynamic Schedule Requirements Montana – NW 50 MW BPA Loads 20 MW Glacier Wind 1318 MW Colstrip Participants 91 MW NWE Idaho – NW 200 MW PAC 60 MW Boardman DTC Studies-BPA Report (Feb 2010)

15 DTC Task Force – Part of Wind Integration Study Team (WIST) DTC Task Force Convened October 2010 Technical Staff primarily from NW & CA entities ~55 Meetings to date. Purpose: 1.Develop a technical consensus on how to facilitate increased Dynamic Transfers without compromising system reliability 2.BAs & TPs to establish DTC Limits on paths 3.Determine if & how to expand DTC

16 DTC TF (Phase 3 )Membership Avista: Rich Hydzik BPA: Brian Tuck, Ramu Ramanathan BCH: Steven Pai, Sanjeet Sanghera, CAISO: Jim Price Gaelectric: Dan Wheeler IPCO: Orlando Ciniglio MSR: Dave Arthur, Ann Fisher NWE: Rikin Shah, Ray Brush PAC: Sanman Rokade PGE:Philip Augustin, Don Johnson PSE: Alex Berres, Joe Seabrook TANC: Abbas Abed, Shawn Matchim SMUD: Richard Buckingham WAPA (Folsum): Kirk Sornborger Powerex: Gordon Dobson-Mack DTC TF Chair Tel: Columbia Grid: Marv Landauer Northern Tier: Rich Bayless NWPP: Don Badley 3

17 DTC TF Work Process Phase 1 (03/11) Phase 2 (07/11) Phase 3 (11/11)

18 Three Conditions Restricting Transfer Variability Limits

19 Does not calculate TVLs for particular Paths; –Recommends a methodology; –Leaves limit calculations to Transmission Providers Does not recommend specific projects –Describes generic projects to enhance TVLs –Leaves specific project recommendations to TPs Caveats for Phase 3 Report

20 TVL is a real issue; –Impediment to transfer imbalance energy and regulation between BAs; –Will limit where & how the region can integrate wind; –Limits can be raised, but not overnight. Need for TVLs will vary by system; Should plan for increased transmission flexibility to manage the increasingly variable flows on grid Bottom Line – so far

21 How automated is your RAS arming? How much automatic voltage control do you have across your system? What are the TVLs for your major flowgates? How will your company manage TVLs? What capital projects are planned to increase Transmission Flexibility? Questions for Companies

22 Modifying some SOL assumptions (e.g. overshedding); Automating RAS Automating voltage control Ensure voltage control equipment is designed for frequent switching (**Detailed TVL studies needed to identify most effective solutions) Options for increasing TVLs

Questions?