LAFAYETTE COLLEGE ECE 492 – SENIOR DESIGN PROJECT ERIK ADOLFSSON JUSTIN BUNNELL GREG EARLE SAM FRIEDMAN WILL KIEWICZ-SCHLANSKER RICARDO QUAN LiFePO4 Battery.

Slides:



Advertisements
Similar presentations
~ Mini Programmable DC Power Supply ~. mPP Series :
Advertisements

Chapter 3 Ohm’s Law.
Taylor Holmes, Jason Partin, William Rody, Malcolm Stagg.
555 Timer ©Paul Godin Updated February Oscillators ◊We have looked at simple oscillator designs using an inverter, and had a brief look at crystal.
Team: – Brad Jensen – Will Klema – Nate Schares Client: – PowerFilm, Inc. Advisor: – Dr. Ayman Fayed Solar-Powered Mobile Power Station (MPS)
Voltage and Its Measurements
Design and Computer Modeling of Ultracapacitor Regenerative Braking System Adam Klefstad, Dr. Kim Pierson Department of Physics & Astronomy UW-Eau Claire.
Current. Current Current is defined as the flow of positive charge. Current is defined as the flow of positive charge. I = Q/t I = Q/t I: current in Amperes.
Introduction Since the beginning of the oil crises, which remarkably influenced power development programs all over the world, massive technological and.
Prepared by: Hamzah Snouber For: Dr. I mad Breik.
Hardware-in-the-Loop Testbed Team 186. Project Collaborators Team Members: o Aaron Eaddy – EE o Ken Gobin – EE/COMPE o Douglas Pence – ENGR PHYS/EE Team.
MSU Solar Team Battery Management System Team 7 Matt Gilbert-Eyres, Albert Ware Gerald Saumier, Auez Ryskhanov Michael Burch Facilitator Dr. Bingsen Wang.
Professor Sung-Yeul Park
LPRDS – CMS – 2011 Per Cell Management Design. Presentation Outline Introduction Project Goals One Board Per Pack ESS Controller Board System Communication.
Capacitive Electric Load Leveling Systems Conceptual Design Review November 9, 2004 Erin Davis Fred Jessup Benton O’Neil.
Power System for Ocean Bottom Observatories Taken from the Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
EKT214 - ANALOG ELECTRONIC CIRCUIT II
Single-Cell Gauging 101.
© 2012 Pearson Education. Upper Saddle River, NJ, All rights reserved. Electronic Devices, 9th edition Thomas L. Floyd Electronic Devices Ninth.
Autonomous Control of Scalextric Slot Car on User-Defined Track Siddharth Kamath Souma Mondal Dhaval Patel School of Electrical and Computer Engineering.
LSU 10/09/2007System Design1 Project Management Unit #2.
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
Electrical Principles Chapter 3
Cost-Effective Hundred-Year Life for Single-Phase Inverters and Rectifiers in Solar and LED Lighting Applications through Port-Based Ripple Management.
1 © Unitec New Zealand Embedded Hardware ETEC 6416 Date: - 10 Aug,2011.
Abstract/Problem Statement The goal of this project is to develop an efficient, safe and scalable system for charging and monitoring a multi-cell battery.
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
Electricity Unit 1 Physics.
Power Supply Design J.SHANMUGAPRIYAN.
WILLIAM KIEWICZ-SCHLANSKER LAFAYETTE COLLEGE LiFePO4 Battery Pack Per-Cell Management System.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Robotic Sensor Network: Wireless Sensor Platform for Autonomous Topology Formation Project: Sponsored By: Advisor: Dr. S. Jay Yang, CEManager: Steven.
Low Cost Infrared Touch Screen Bezel for POS Systems Rohan Verma, Jeremy Taylor, Freddie Dunn III Georgia Institute of Technology School of Electrical.
LDO or Switcher? …That is the Question Choosing between an LDO or DC/DC Converter Frank De Stasi Texas Instruments.
Optimization of PHEV/EV Battery Charging Lawrence Wang CURENT YSP Presentations RM :00-11:25 1.
For Electric Vehicle Team Members Pramit Tamrakar - EE Jimmy Skadal - EE Hao Wang - EE Matthew Schulte - EE William Zimmerman - EE Advisor Ayman Fayed.
DEVELOPMENT OF LABORATORY MODULE FOR SMALL WIND TURBINE CONTROL SYSTEM (Phase V) Advisor/Client: Dr. Venkataramana Ajjarapu Group MembersPosition on Team.
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
An Automated RF Tuner for Silicon Carbide Electronic Device Processing
1 Electrical Skills Voltage and Its Measurements.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Self Switching Power Supply. Introduction Self Switching Power Supply  Embedded system requires a regulated power supply.
Solar Powered LED Blinds Group 28: Austin Estes and Kerr Oliva TA: Katherine O’Kane.
Auto turn off battery charger Auto turn off battery charger.
Project Description The Square D occupancy sensors use both ultrasonic and passive infrared technology (PIR) to detect occupancy in a room. This project.
Chapter 9 CAPACITOR.
Self-Sustainable Electric Golf Bag Final Presentation Group 19 Jon Kinney, Cory Edwards, Harrison Kantner 30 April 2013.
How to Build a Digital Physical System - Lab Lecture 2.
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
ARUN MUCHHALA ENGINEERING COLLEGE- DHARI [ ] ANALOG ELECTRONICS Prajapati Omprakash rd ELECTRICAL DEPARTMENT ANALOG ELECTRONICS.
Introduction to Linear Voltage Regulators Krishna Kishore Reddy K 2010H223084H.
Chapter 6: Voltage Regulator
UNIT- II Rectifiers and Filters. Basic Rectifier setup, half wave rectifier, full wave rectifier, bridge rectifier, derivations of characteristics of.
Specialized Battery Emulator for Automotive Electrical Systems
OPERATING SYSTEMS CS 3502 Fall 2017
Subject Name: LINEAR INTEGRATED CIRCUITS Subject Code: 10EC46
Electronic Devices Ninth Edition Floyd Chapter 17.
Rectifiers and Filters
555 Timer EEE DEPARTMENT KUMPAVAT HARPAL( )
SCADA for Remote Industrial Plant
Day 5: Energy Applications - Energy Conversion and Management Silicon
Brendan Flood, Gerard deBlasi, John Fedak IV Lafayette College
Power Electronics Research at Seoul National University
Optimization of PHEV/EV Battery Charging
Introduction to Linear Voltage Regulators
Chapter 6: Voltage Regulator
Photovoltaic Systems Engineering Session 10
Series 5300 Lithium Cell Formation System
Prototyping with Micro-controllers, Sensors, and Materials
Presentation transcript:

LAFAYETTE COLLEGE ECE 492 – SENIOR DESIGN PROJECT ERIK ADOLFSSON JUSTIN BUNNELL GREG EARLE SAM FRIEDMAN WILL KIEWICZ-SCHLANSKER RICARDO QUAN LiFePO4 Battery Pack Per-Cell Management System

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Budgets Future Work

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Budgets Future Work

System Overview Lafayette Photovoltaic Research and Development System (LPRDS)  2kW solar energy system that converts high voltage DC to 120V AC RMS signal of 60Hz  Capstone project to introduce students to real engineering project issues and requirements  Multi-year multi team senior Electrical and Computer Engineering design project

LPRDS-CMS-2011 Design a system which will complete per-cell management requirement of the LPRDS statement of work  Initially included full system integration into LPRDS tower, including 16, 4-cell packs and a master controller board Diminished scope of project (due to time constraints) led to attempting only a subset of the requirements: one 4-cell pack of LiFePO4 cells  Able to communicate to master device (PC or master board),  Scalable to include multiple series packs  Capability for full system integration

Why Balance? Extend useful lifetime  Or, not decrease the expected lifetime Increased health over lifetime Increased operational capacity Increase the accuracy of SOC calculations

Why Balance Our Way? Dictated by several factors:  Requirements  Physical limitations  Time constraints Design for simplicity:  Relatively simple implementation  Uses easy to gather information  Can be updated to reflect better cell characterization

Active Vs. Passive Balancing Active: Using capacitive or inductive loads to shuttle charge from higher charged cells to lower charged cells.  Is more efficient from a power perspective  Has scalability issues Passive: Bypasses cells (usually through a resistance) and burns off the excess charge from the cell.  Better large-stack scaling  Burn off can be significant

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Budgets Future Work

Hardware Design

Strict Physical Requirements  Fit on top of a pack  Low enough to fit in rack  Interweave components between the cell terminals Electrical Requirements  High power path must handle up to 25 Amps  Minimize current drawn for circuitry  Electrical isolation for all communication signals  Bypass circuitry should bypass as much current as possible

Hardware Design - Bypass Main factors in bypass loop  Resistor  Value, package  Transistor  Switching parameters, package  Isolation  Solving the floating ground problem  Indication  Clear notification of when bypass occurs

Hardware Design - Bypass

Hardware Design – Temperature Analysis Temperature rise without heatsink ~ 4000 Kelvin Initial thermal requirement is 40°C above ambient: 65°C Temperature waiver raised requirement to 70°C above 30°C ambient = 100°C

Temperature Analysis Temperature rise heatsink ~ 400 K Empirically tested with IR gun, temperature rise does not exceed 53°C Temperature waiver requirement may still be necessary for individual component temperatures (i.e. bypass resistor, voltage regulator)

Hardware Design - Sensors Current, voltage, temperature monitoring  Use these metrics during cell balancing Redundant temperature monitoring is outside of the microcontroller  Temperature failure notification not based in firmware Buffers to boost signals and interface to low- impedance ADC’s

Hardware Design - Microcontroller Controls the balancing algorithms as well as all communication going into or out of the board. Has three status LED’s to show activity and charge/discharge Programmable using ICSP, communicates with I2C

Hardware Design - Layout Limited space  Had to fit within the pack outline  Battery terminals were set  High current paths needed very wide traces Heat dissipation  Heatsink placement and attachment  Electrical insulation

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Budgets Future Work

Software Design – Cell Balancing Algorithm Utilizes direction of current through current sensor to determine charging or discharging state In charging state, bypass based on monitoring of 50 mV differences in cell voltages Maximum and minimum charge decided by variable voltage thresholds determined by register in PIC Monitors temperature to protect against overheating

Software Design – State of Charge Algorithm Based on Coulomb Counting Uses data from the current sensor to sum the current over time Sum and sample period are output through I2C, and the user can calculate SOC by

Software Design – I2C OBPPs respond only to board address matched by value in program memory Memory address is mapped to a function in firmware I2C can read all defined memory addresses Certain variables can be changed to alter operation of OBPP I2C can be used to manually set bypass Can address up to 168 packs in system

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Budgets Future Work

Simulation – SOC Curves SOCs begin at largely different values Over about 16 charge/discharge cycles, SOCs converge to within 5% of each other Standard deviation of SOCs of the cells begins at 12% and decreases to about 2% SOC

Simulation – Standard Deviation and Power Bypass curves coincide with sloped regions of standard deviation curve As pack converges, less bypass is needed Standard deviation decreases and levels off over multiple charge/discharge cycles, demon- strating convergence

Standard Deviation in %SOC and Joules Standard deviation in %SOC (12% - 2%) Standard deviation in Joules (3.4 * 10 6 J– 0.5 * 10 6 J)

Simulated Merit of Efficiency For grouping of cells with initial SOCs: 90%, 25%, 12%, 10%

Merit of Efficiency Using capacitive or inductive balancing may be more efficient than resistive bypassing We have a way of determining and justifying the efficiency of our system. Imbalance / Cost = Efficiency (J/J) Why does it work? Multiple Cycle, Partial Resistive Bypassing

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Budgets Future Work

Acceptance Testing Comprehensive testing to prove requirements have been met Composed of two main tests and one secondary test 24 hour operation test Test 1: Cell balancing, hardware requirements, indicators and communication Test 2: Comprehensive I2C verification Test 3: Addressing basic/ complex problems using the User’s Manual

Acceptance Testing Setup

Acceptance Testing - Test 1 Pack is deliberately unbalanced Test setup fully charges and discharges the system multiple times Data is taken from all cells continuously Simulink is used to automate the change from charging to discharging After five cycles, a script polls the I2C line for another 16 hours

Acceptance Testing – Test 1

Empirical Results It works!  Based on a metric that we created  For the express purpose of passing this test Approximate beginning standard deviation = 12% Approximate ending standard deviation = 9% More charge/discharge cycles needed for better graphs and more rigorous verification

Acceptance Testing - Test 2 Comprehensively test I2C Make sure every voltage, temperature, current, and other relevant measurements are accurate and concur with digital multimeters and thermometers Also, make sure manual mode works as desired and bypass can be initiated for the desired amount of time. Lastly, make sure the I2C system remains responsive throughout the duration of the test.

Empirical Results Passed all parts of Acceptance Test 2 except 2 nd part of temperature verification  Initial hypothesis for reason of failure is ineffective testing method procedure  Heat dissipated through heatsink before accurate temperature from thermometer could be read  IR gun does not accurately report temperature of reflective surfaces

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Conclusions Budgets Future Work

Requirements Met R002 – Energy Storage  LPRDS-CMS-2011 permits per-cell battery management  System charges to maximum recommended capacity (over several charge/discharge cycles)  System bypasses cells which become full first to balance cells  System monitors cell voltage to avoid over-discharge  Indication LEDs and DONE signal  I2C system can monitor voltage and current of every cell in pack and the SOC of each pack  Standalone operation of CMS pack

GPR002 – Environmental  System is reliable under normal functional operation in ambient lab temperatures of 70°C over ambient of 30°C GPR003 – EMI/EMC  Does not emit any unintentional electromagnetic radiation GPR004 – Hazmats  There are no hazardous materials used in this design GPR006 – Reliability  The system wide MTBF is greater than 1000 hours over system lifetime  24 hour test demonstrated firmware reliability (also demonstrated hardware failure, not design flaw) GPR007 – Maintainability  System wide MTTR is less than 1 week over system lifetime  Repairs during ATP took less than 1 week to complete GPR008 – Manufacturability  All components and subassemblies have sustainable source of supply over system lifetime

Requirements Missed Accurately read temperature during T002 Continuous Fuel Gauge indicator (trinary) Schedules (every single one)

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Conclusions Budgets Future Work

Conclusions Standard deviation of cell voltages is a fair metric of the effectiveness of the CBA Effective operational capacity of the balanced cells demonstrates a noticeable increase over the unbalanced cells Capacity variation between cells has a significant impact on the predictability of the algorithm

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Conclusions Budgets Future Work

Budget – Full Project Spending Total expenditures: ~$1,373

Budget – Pack Cost Total cost: ~$141

Introduction Hardware Design Software Design Justification for Method QA Testing and ATP/ATR Requirements and Success Conclusions Budgets Future Work

Modification of the CBA to accommodate certain conditions  All cells bypassed  Cells nearing convergence  Sliding bypass window Full stack integration incorporating a master device Full system integration with the LPRDS system

Questions?