Main contractor name – LTI# - Date of incident Incident details Contractor name/number: (subcontractor-contractor- PDO)/CXXXXXX Incident owner: Name /

Slides:



Advertisements
Similar presentations
Main contractor name – LTI# - Date of incident 1 Non Accidental Death Name of Company Date of Incident 1.
Advertisements

Main contractor name – LTI# - Date of incident Incident details PDO directorate/dept: (e.g. OSD _OSO_OSO4) Contractor name/number : (subcontractor-contractor-PDO)/CXXXXXX.
Main contractor name – LTI# - Date of incident Incident details PDO directorate/dept: (e.g. OSD _OSO_OSO4) Contractor name/number : (subcontractor-contractor-PDO)/CXXXXXX.
Main contractor name – LTI# - Date of incident 1 HSE Investigation template and guidance Lost Time and HiPo Incident HSE Incident Investigation guidance.
Always start a vehicle correctly
No Removal of cellar frames by hands
Always use mechanical handling aids when carrying out a heavy lift
Keep a safe distance between the vehicle in front
Location, Asset, Date of incident
Always stay alert while driving, and observe other drivers behaviour
PDO Second Alert What happened? Ensure you are out of the danger zone
AIPS event name Date PIM #XXXXXXX (20XX Tier X #XX)
HSE Incident Investigation guidance notes
HSE Incident Investigation guidance notes
Location, Asset, Date of incident
HSE Investigation template and guidance Lost Time and HiPo Incident
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Incident details Contractor name/number : (subcontractor-contractor-PDO)/CXXXXXX Incident owner : Name / Ref Ind Location : Area / unit - (road/yard/station/rig/hoist/plant.
Use right tools for the job and use them correctly
Always wear fall protection equipment when working at height
Avoid taking shortcuts
Keep away form ‘line of fire’
Always use the right equipment for the task !!!!
Always follow Night driving rules
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
HSE Investigation template and guidance Non Accidental Death (NAD)
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
If in doubt – stop the job
PDO Second Alert Date: Incident title: HiPo Asset Damage
Ensure safety devices are working prior to starting work
Never place yourself in “line of fire”
PDO Second Alert Date: Incident title: HiPo What happened?
Ensure that all Rig moves are carried out by competent personnel
PDO Second Alert Photo explaining what was done wrong
Confidential - Not to be shared outside of PDO/PDO contractors
Always follow defensive driving techniques
Use only certified lifting equipment in good condition
Always intervene an unsafe act
Always get authorization before starting any job!
Always keep your equipment maintained
Effective communication prevents incidents
Confidential - Not to be shared outside of PDO/PDO contractors
Always isolate equipment before beginning maintenance tasks
Always use fit for purpose lifting accessories
Keep clear of any rope under tension
Stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
Always ensure protective guards are in place
Always adhere to Red/No Go zones
Do not drive underneath overhead lines without permission.
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Your safety should always be built on SOLID ground
Use clamps instead of bands to secure ESP cable on the tubing
Maintain communication between peers
Do Not Start Any journey without proper driving training.
Always check your surroundings while working in the yard.
Driving rules are for saving lives – adhere to it always
Always follow NORM protocol!
If you feel tired, STOP and take rest
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Always assess your position and be away from “Line Of Fire”
Confidential - Not to be shared outside of PDO/PDO contractors
Beware of raised edges of walk ways.
Slow down and always drive to the conditions of the road.
Presentation transcript:

Main contractor name – LTI# - Date of incident Incident details Contractor name/number: (subcontractor-contractor- PDO)/CXXXXXX Incident owner: Name / Ref Ind Location : Area / unit - (road/yard/station/rig/hoist/plant etc) Incident date & time: (d/m/yr) / (24 hour clock) – advise if estimated Incident type: Fatal, LWC, high potential, significant incident etc Actual severity rating: Number (1-5) / letter (P, E, A,R) – from RAM Potential risk rating: Letter (A-E), Number (1-5)/letter (P, E, A,R) from RAM Description of Injuries: Worst injuries (fractures, head injury, amputation etc) FIM ID N o : Number assigned in FIM Immediate cause: Short description of what caused harm Key underlying cause: Main learning from investigation 1

Main contractor name – LTI# - Date of incident Description of the incident: This should include the relevant facts explaining what happened including all relevant parties Leading up to the incident Immediately before the incident During the incident Immediately after the incident In the emergency escalation of the incident Important Note: This should be in sufficient detail to allow a person who does not know anything about the incident to imagine it. It should only be about what happened and not why it happened. Do not include investigation findings here, simply describe the incident as the investigation has shown it happened. For complex incidents involving the interaction of several different parties, a timeline can be added on a separate slide immediately after this one. 2

Main contractor name – LTI# - Date of incident Photographs, diagrams & sketches Rules Only include photos or sketches if they add value explaining the incident or causes. Each photo/sketch must be labeled to explain what it is and why it has been shown. Ensure photos are labeled to explain context (e.g. road looking in direction of; historical photo of plant before fire etc). Ensure all photos are evidenced to the investigation. (have formed part of the investigation) Ensure all photos are of suitable clarity. Include a maximum of four photographs/sketches per page. Do not exceed three pages of photographs, diagrams and sketches 3

Main contractor name – LTI# - Date of incident Key investigation findings : The findings should be listed in terms of subject and importance – (list below is non-exhaustive) 1.People, training, age, experience, nationality, medical conditions, disciplinary record etc 2.Equipment, type, serial number, maintenance, inspection, failings, appropriate for use etc 3.Activities at the time of the incident, lifting, driving, commuting, drilling, POOH etc 4.Relevant environment, workplace conditions, weather, lighting, floor surface, dust, cramped etc 5.Operational management, supervision, TBTs, SJPs, SWPs, STOP, availability on site etc 6.Contractual management, audits, CH involvement, defaults, inspections, visits, issues, sub contractor management 7.HEMP, review, appropriateness to the incident, is it used, how is it translated into action 8.Previous relevant incidents/learnings, what, where, were they aware of it, were controls introduced 9.Emergency response, how effective was it, did it impact on the severity? 4

Main contractor name – LTI# - Date of incident Conclusions: Active causational failures: The acts or conditions precipitating the incident. They usually involve the front-line staff, the consequences are immediate and can often be prevented by design, training or operating systems. Latent causational conditions: Managerial influences and social pressures that make up the ‘way we do things around here’, influence the design of equipment or systems and define supervisory inadequacies. They tend to be hidden until triggered by an event. Latent conditions lead to human errors or violations. Latent causational management failures (underlying causes): Latent failures are due to people removed in time and space from the operation, e.g. designers, decision makers and managers. Latent failures are typically failures in the HSE- MS (design, implementation or monitoring). e.g: poor design of plant/equipment; ineffective training or communications; inadequate supervision or resources; uncertainties in roles and responsibilities. Latent failures are usually hidden until they are triggered by an event likely to have serious consequences. Did the HSE–MS identify these hazards and place barriers for mitigation? If not, then it is a latent management failure 5

Main contractor name – LTI# - Date of incident Directorate IRC Minutes:Date held: (d/m/yr) Feedback to Incident Owner: (Depth, accuracy, quality, robustness, feasibility and appropriateness of investigation findings and recommendations) 1.… 2.… 3.… Query raised: (raise questions which have not been adequately answered in the investigation or presentation) … 3.… Additional recommendations: (Including, revisiting the investigation to improve quality, adding any key recommendations that are requested by the directorate management but have been missed in the investigation, or removing inappropriate recommendations) 1.… 2.… 3.… 6

Main contractor name – LTI# - Date of incident Non-causational findings but worthy of note: (Investigations can often identify issues which although not directly linked to the cause of the incident are important to report, correct and communicate for wider learning. List these here in bulleted format.) 7

Main contractor name – LTI# - Date of incident Tripod Tree (include copy of the Tripod tree flow diagram for all 4/5 incidents or High Potential) Investigation reports requiring a Tripod must confirm that the findings and recommendations match the Tripod findings 8

Main contractor name – LTI# - Date of incident Immediate actions: (Report all remedial measures actions taken and completed within one week of the incident) Redline recommendations: Report the five most important actions to prevent a reoccurrence in the future. Note: 1.Causations to be linked with the recommendations, noting that one causation may have one or more recommendations 2.Recommendations to include title of Action Party and not just PDO or Contractor Company. These must be under separate columns – one each for PDO and for Contractor 3.Actions to be given to PDO and or direct contractors only. The sub-contractor to be indicated as action party in brackets 4.Where an action is with a contractor the corresponding PDO action party is the Contract Holder to ensure it is completed & in FIM Causations Causation 1 Causation 2 Causation 3 Causation 4 Causation 5 Recommendations a) b) c) d) e) Target Date a) b) c) d) e) Action Party (Contractor) a) b) c) d) e) Action Party (PDO /CH) a) b) c) d) e) Status a) b) c) d) e) Brief Description of Action Taken a) b) c) d) e) Date Completed a) b) c) d) e) 9

Main contractor name – LTI# - Date of incident Additional Recommendations: (include the less urgent actions required to improve the management and for other contractors to learn from) Note: 1.Causations to be linked with the recommendations, noting that one causation may have one or more recommendations 2.Recommendations to include title of Action Party and not just PDO or Contractor Company. These must be under separate columns – one each for PDO and for Contractor 3.Actions to be given to PDO and or direct contractors only. The sub-contractor to be indicated as action party in brackets 4.Where an action is with a contractor the corresponding PDO action party is the Contract Holder to ensure it is completed & in FIM Causations Causation 1 Causation 2 Recommendations a) b) Target Date a) b) Action Party (Contractor) a) b) Action Party (PDO staff) a) b) Status a) b) Brief Description of Action Taken a) b) Date Completed a) b) Contact CEO & PDO Director joint statement _________________________ _____________________ Contractor CEO PDO Director (RESPONSIBLE) (ACCOUNTABLE) 10

Date: Incident title What happened? Very short description of what happened Your learning from this incident.. ( This must relate to the people at risk of harm or people at risk of causing the harm) Title (e.g. Drivers) Learning points for them from the investigation PDO safety advice Strap line – (keep short and punchy Photo explaining what was done wrong Photo explaining how it should be done right 11

As a learning from this incident and ensure continual improvement all contract managers are to review their HSE HEMP against the questions asked below Confirm the following: Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues. Management learnings 12