ERCOT Tool to manage unexpected incremental load November 16, 2006.

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Loads Acting as a Resource Relationships with QSEs and LSEs
Presentation to WECC Market Interface Committee March 24, 2015
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
© 2013 McNees Wallace & Nurick LLC October 17, 2013 Robert A. Weishaar, Jr. ON SITE ENERGY – INTERPLAY WITH PJM DEMAND RESPONSE PROGRAMS Harrisburg, PA.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Sai Moorty ERCOT Integration Options into ERCOT systems.
Presented By: Mark Patterson ERCOT Manager, Demand Integration November 29, Minute ERS Pilot update to TAC 1.
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Barriers to Energy Storage providing Ancillary Services in ERCOT
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Renewables and System Services Ann Scully.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
14 Minute Ramp Period Testing Workshop June 30, 2009.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
RTDF Overview of Data Analysis & Status of “Consesus Items”
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERS Procurement Methodology
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Real-Time Co-optimization of Energy & Ancillary Services
Market Notice Regarding Off-line Units
Reflecting Losses in DR within ERCOT August 22, 2012
MRES Resource Operations in SPP
30 Minute Reserves EPFSTF January 4,
Presentation transcript:

ERCOT Tool to manage unexpected incremental load November 16, 2006

Disclaimer The numbers presented in this presentation may or may not represent actual capabilities of a generic Combine Cycle unit. The numbers within this presentation are for the sole purpose of conveying the concept of stranded capacity.

Stranded Capacity Note: ERCOT demands a 10 minute window to execute Ancillary Services deployment  Max Use of Slow Response Duct Burner: 150 MW Deployment (350 to 11.4 MW per min ramp ~ 13.2 min (70 & 80 LSL MW Duct Burners 70 MW 1.5 MW/Min Combine Cycle 430 MW 20 MW/Min 430 MW  No Use of Slow Response Duct Burner: 150 MW Deployment (280 to 20 MW per min ramp ~ 7.5 min 280 MW 70 MW 80 MW 40 MW 110 MW  Blend of Slow and Fast Response Capacity: 150 MW Deployment (320 to 15 MW per min ramp ~ 10 min (40 & MW Stranded LSL MW 70 MW Stranded Inefficient use of Capacity: Can Perform Incremental AS in the Remaining 2.5 minutes Efficient use of Capacity: But Violates 10 Minute Performance Rule Maximizes AS Sales, but Still Strands a Portion of Capacity 500 MW CC Unit

Proposed Concept  Activate Stranded Capacity that is online but not presently being offered into the market because of its negative effect on the performance of contractual Ancillary Services obligations  Ancillary Services must still be performed, but the Market Participant is allowed longer than 10 minutes to achieve the full performance of the Ancillary Services

EECP Process  ERCOT determines EECP Step 1 is eminent  ERCOT notices Market  CC Market Participants inform ERCOT on the amount of Stranded Capacity excluded from Resource Plan  ERCOT issues a VDI to CC units with Stranded Capacity (with AS 10 min Compliance Waiver)  CC Market Participants receiving VDI modify Resource Plan to reflect incremental capacity  ERCOT recalls VDI upon exiting EECP  CC Market Participants modify Resource Plan to reflect Stranded Capacity

Settlement  No Capacity Payment paid  CC Market Participant receives MCPE only for energy performed

Benefits  Tool (Stranded Capacity) is available on short notice  Tool is available all seasons  No short term or long term contracts required  No incremental cost to loads  Minor system changes (if any)  Enables capacity, that is represented in the Planning Reserve calculations as available capacity, to become available (non-stranded)

11 Questions 1. Qualifications & requirements Any generator that is stranding duct burner capacity in order to comply with the AS 10 minute performance requirement 2. Dispatch and recall ERCOT determines EECP Step 1 is eminent ERCOT notices Market CC Market Participants inform ERCOT on the amount of Stranded Capacity excluded from Resource Plan ERCOT issues a VDI to CC units with Stranded Capacity (with AS 10 min Compliance Waiver) CC Market Participants receiving VDI modify Resource Plan to reflect incremental capacity ERCOT recalls VDI upon exiting EECP CC Market Participants restore Resource Plan to reflect stranded capacity

3. Who gets paid –No body gets paid a capacity payment. Resources get paid MCPE if energy is produced. No incremental cost to market. 4. How they are paid –Existing ERCOT Settlement 5. Who pays –Whoever consumes energy without a bilateral contract 6. Effect on clearing price –Price taker. No impact.

7. Compliance issues –Paid only as performed. 8. Coordination with other ancillary services –Waiver issued on 10 minute timing only. AS must still be performed. 9. Self-provision –Unknown

10. Contract duration –No Contract required. 11. Procurement: Contract vs, Auction –No Contract or Auction Required

Questions?