Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
Qualified Partner Program Installation Cables Felice Guarna, Training Program Manager Wetzikon, Dec
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
04/02/2004 az Outer Tracker Distribution Boxes 1 EFNI H K Outer Tracker Distribution Boxes Ad Berkien Tom Sluijk Albert Zwart.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Walls crates cables gas chambers electronics CERN adb.
31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
1 Project # 2 Steve Klesper Tom Ondick Garry Meadows Aaron Hurt Tim Wade.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
RPC (Barrel) Cabling summary. Signal cable specifications Signal Cables (two possibilities): –Loose pair round and twisted pairs (with flat zone for crimping.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Mauro Citterio - Mi meeting
Cabling for LHCb Upgrade
Service channels between Tracker and PP1
Service channels between Tracker and PP1
DCS: Temperature Probes
DCS: Temperature Probes
Mini-drawers, FE-ASIC , Integrator
G. Carboni for the Muon Group
Electronics for RPC Upscope
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Preparation for Installation at ESS
Presentation transcript:

Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box V.Cabling at racks

I. Status of cables: data cables High Skew but BER test OK Very High Skew and BER test FAILS Skew and BER test OK Skew and BER test OK  Test: skew (pair to pair and deser. to deser.), length and BER.  All delivered and tested.  6 cables to repair, 4 due to high skew and 2 due to bad conenction. To be received this week.  In total 116 cables. Top (18 m) spares Top (20 m) spares Bottom (27 m) spares Bottom (28 m)4

I. Status of cables: power cables Between Marathon Power Supplies and Regulator cards: –Two cables per regulator card (16 cards) of 3 pairs of conductors (4 mm 2 ) of tinned copper screened to the ensemble with braid of tinned copper and insulation of type polyolefin Z1 halogen free. –Outer diameter: 19,8 mm. Bending radius: 200 mm –Length: 22 m for top and 32 m for bottom. –Two reels of 750 m received. –Already delivered at CERN, to be cut. –Installed without connector. Between Regulator cards and VFE cards: –One cable of 6 pairs of conductors (0.5 mm 2 ) per VFE. –Same conductor and insulation materials. –Outer diameter: 13,4 mm. Bending radius: 134 mm. –Length: if VFE and regulator cards in same box 2.5 m, otherwise 3.5 m. –Delivered at BCN Both are LS – 0H – FR. Being studied by CERN safety group.

I. Status of cables: control/Clock cables Category 5e LAN cables from Nexans (FTP). Shielded RJ 45 connectors. Low smoking, flame retardant and halogen free. Outer diameter: 5.9 mm Bending radius: 48 mm Length: 20 m top and 29 m bottom. Needed spares (top) and spares (bottom). Received, except spares. Remaining cables (spares) will be received by mid June. Tested by manufacturer. Delivered at BCN.

I. Status of cables High voltage cables: the cable will be delivered in July-August and connectors will be mounted during September. Need to group cables. Other cables: DSS and LED?

II. Cable reels Data cables: same as PS reel (60 x 8 cm), but with modified hole to fit different connector. 116 units Control cables: same as PS PS. 26 units. Power cables: bigger reel. Offer from another manufacturer for 63 x 25 cm. Same manufacturer? Weight will be 20 Kg. 32 units. Other cables (HV, DSS, LED) are same as PS. Preparation of reels during September and first half of October.

III. Labelling Labels in cables (for installation of electronics): final labels as proposed in EDMS note Labels in reels (for installation of cables), Gael’s proposal: 1.SubDetector/ rack number / Inner or Outer / number (or color) of the compartment in the cable chain / place in the compartment defined by a matrice (a letter and a number). 2.VFE box / position inside box. Preparation of labels during September and first half of October

IV. Cabling inside VFE box Worst case: 4 VFE and 2 regulator cards.

IV. Cabling inside VFE box Regulator LV out: worst case: 13 cables. 5 cm for LED and DSS

IV. Cabling inside VFE box Regulator LV in: connection at the entrance

IV. Cabling inside VFE box VFE connection

V. Cabling in Racks Bar at the back of racks to attach data cables. LV patch panel TO BE DESIGNED. –To connect PS and SPD LV cables to Power Supplies. –Fuses for fire prevention and LEDs indicating voltage and o.c. fuse. –Connection (mechanics) of 20 mm LV cables??? –SOME DISCUSSION IS NEEDED to determine position and size. When? Who?

V. Cabling in Racks