Lower Susquehanna River Dam Sediment and Solutions Conowingo Relicensing; LSRWA; MD County Resistance; Solutions; CAC Involvement Thursday November 29.

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
1 Nicole Carlozo NOAA Coastal Management Fellow June 7, 2013 Integrating Water Quality and Coastal Resources into Marine Spatial Planning in the Chesapeake.
US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
RTI International RTI International is a trade name of Research Triangle Institute. Economic Study of Nutrient Credit Trading for the Chesapeake.
The Effect of the Changing Dynamics of the Conowingo Dam on the Chesapeake Bay Mukhtar Ibrahim and Karl Berger, COG staff Water Resources Technical Committee.
Maryland Assateague Coastkeeper Baltimore Harbor Waterkeeper Chester Riverkeeper Choptank Riverkeeper Patuxent Riverkeeper Sassafras Riverkeeper Severn.
US Army Corps of Engineers BUILDING STRONG ® Lower Susquehanna River Watershed Assessment Date: September 24, 2012 Watershed/Reservoir Sediment Management.
Conowingo Dam and Lower Susquehanna River Sediment Mt. Airy Water and Sewer Board December 12, 2013 Bruce Michael Maryland Department of Natural Resources.
Sediment Task Force Meeting April 30, 2012 Marjorie L. Zeff, PhD., PG Gary Lemay Conowingo Hydroelectric Project (FERC No. 405) Updated 2011 Bathymetric.
Conowingo Hydroelectric Power Station and Muddy Run Pump Storage Facility Welcomes the Citizens Advisory Committee.
Citizens Advisory Committee Ann Swanson Executive Director February 27, 2014 Chesapeake Bay Commission.
Chesapeake Bay and New York State Water Quality and the Potential for Future Regulations Presented by the Upper Susquehanna Coalition.
Chesapeake Bay Program Monitoring Activities and Monitoring Network Design Chesapeake Bay Program Monitoring Activities and Monitoring Network Design Stephen.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Point Source POLLUTION: CAUSES AND CONSEQUENCES
Assessing the feasibility of reestablishing ecosystem processes on the Mississippi River in the Twin Cities, Minnesota Christian Lenhart 1, John L. Nieber.
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
Jim Edward, Deputy Director Chesapeake Bay Program (EPA) 1 CBP Program Update Citizens Advisory Committee February 27, 2014.
Update on Forest Goals and Progress in the Chesapeake Bay Partnership Citizens Advisory Committee Meeting, 8/23/13 Sally Claggett & Julie Mawhorter, US.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment Two.
Update on the HEC-RAS Reservoir Transport Simulation Mike Langland and Ed Koerkle 03/30/2012.
Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic.
Loudoun Watershed Watch “ Restoring Loudoun Streams” LCSA Water Forum Presented by: Darrell Schwalm Loudoun Watershed Watch Loudoun Wildlife Conservancy.
Bathymetry Changes Caused by a Tropical Storm Chris Scheiner and Gary Pelton US Army Corps of Engineers.
Lower Susquehanna River Watershed Assessment Citizens Advisory Committee November 29, 2012 Anna Compton USACE 1.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Stream Processes and Habitat Ryan Johnson. Overview Watershed Processes – Factors and their effects on the watershed as a whole Stream Processes – Factors.
Nutrient Criteria for the plains regions of Missouri.
Sediment Issues within Transboundary Basins Presented by Paul Bireta and Fernando Salas April 12, 2012.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
Baird Claytor Hydroelectric Project Sedimentation Study.
US Army Corps of Engineers Coastal and Hydraulics Laboratory Engineer Research and Development Center Lower Susquehanna River Watershed Assessment SedFlume.
Gulf of Mexico Hypoxia and Nutrient Management in the Mississippi River Basin Herb Buxton, U.S. Geological Survey.
Clifton Bell, P.E., P.G. Chesapeake Bay Modeling Perspectives for the Regulated Community.
Lesson 1.5 Pg
October 28, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Yuba County Water Agency Yuba.
Lessons Learned from BMP evaluation studies in the nontidal streams and river in the Chesapeake Bay Watershed Katie Foreman University of Maryland Center.
Opportunities for Collaboration on Water- Quality Issues in the Mississippi River Basin Herb Buxton, Office of Water Quality.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
Robert M. Hirsch, Research Hydrologist, USGS September 6, 2012 Nitrogen, Phosphorus, and Suspended Sediment fluxes from the Susquehanna River to the Bay.
Sediment Delivery to the Lower Neches River and the Effects of Impoundments (Town Bluff Dam-Sam Rayburn Dam)
Describe the features and characteristics of the Three Gorges Dam.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
Water Quality Monitoring on Larkin Creek St. Francis County, AR JL Bouldin RA Warby Arkansas State University.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
Abstract Man-made dams influence more than just the flow of water in a river. The build up of sediments and organic matter, increased residence times,
Effects of N Loadings from Dairy Cows to the Susquehanna River Effects of N Loadings from Dairy Cows to the Susquehanna River Austin Weidner CE394K : GIS.
Technical Support in Engineering Construction Phase of Craney Island Eastward Expansion Mac Sisson, Harry Wang, Jian Shen, Albert Kuo, and Wenping Gong.
The Boardman: A River Reborn Removing Dams for a Free Flowing River.
CALCASEIU RIVER AND PASS DREDGED MATERIAL SEDIMENTATION STUDY.
The state belongs to all of us - "Kansas Don't Spoil It"
It’s The Final Countdown To The Mid-point Assessment:
Effects of persistent drought on Lake Mead and the Las Vegas Valley
DEP Citizen Advisory Committee October 17, 2017
Maryland’s Own Fiscal Cliff
River Flow into Chesapeake Bay
Economic Study for Watts Branch Stream Restoration N. E
Conowingo Dam Update Presented to the Citizens Advisory Committee
Status Nearly 30 scenarios completed for NAB and CBP over a year’s effort. Report on application of CBEMP in preparation. October time frame for draft.
Lower Susquehanna River Watershed Assessment
Lower Susquehanna River Watershed Assessment
Maryland’s Phase III WIP Planning for 2025 and beyond
Lower Susquehanna River Watershed Assessment
Jim Edward Acting Director Chesapeake Bay Program Office May 23,2018 EPA’s Draft Final Phase III WIP Expectations.
Enforcement Advocacy Stewardship Education
Presentation transcript:

Lower Susquehanna River Dam Sediment and Solutions Conowingo Relicensing; LSRWA; MD County Resistance; Solutions; CAC Involvement Thursday November

Exelon and Conowingo Relicensing Exelon Application states, “The cumulative impact of the Project to the system is to provide the last site of sediment storage along the Susquehanna River before sediment reaches Chesapeake Bay. This has benefited Chesapeake Bay by providing a means by which the quantity of fine-grained sediment and associated nutrients, sources of water quality impairment, reaching the Bay are reduced.” Exelon Application states, “In summary, the impact of the Project on sediment, when added to other past, present, and reasonably foreseeable future actions, is beneficial or small. When the Project reaches steady state, these benefits will be reduced.” LSR Response, “The model used by Exelon to determine there is no scouring, HEC-6, is not an appropriate model for this calculation, and Exelon’s consultants have been informed of this by USGS. ACE info and bathymetry from 1972 event, and others, indicate that large amounts of sediment are transported to the Chesapeake Bay by scouring and these events can have a major negative impact on the Chesapeake Bay.”

CONOWINGO POND BATHYMETRIC SURVEY  Sediment Task Force Meeting January 23, 2012 Marjorie L. Zeff, PhD., PG (URS) Gary Lemay (Gomez & Sullivan) USGS XC 19 and upstream are likely in dynamic equilibrium  Some areas of deposition and scour, but generally balanced  In the lower Pond (USGS XC 20 and below), deposition outweighed scour  Average cross-section depths generally decreased by 1 foot to 3.5 feet  Deposition occurred around banks/edges, scour in the main channel  Conowingo Pond accumulated approximately 5,870 acre-ft of sediment between the 2008 survey (fall 2008) and 2011 survey (late October 2011)  Net sediment deposition between the 2008 and 2011 surveys was 8.67 million tons, which translates to approximately 2.9 million tons of deposition per year  For reference, historic deposition rates have ranged from 3.1 million tons/yr from , to 2.5 million tons/yr from , to 1.5 million tons/yr from (Langland 2009) 3

Lower Susquehanna River Watershed Assessment (Sediment Task Force) Preliminary Model Runs by CBP show future impacts to Upper and Middle Chesapeake Bay due to loss of trapping capacity This model was run at only 1/5 th of actual expected sediment loading Effects to Susquehanna Flats caused by pass- through of additional 286,000 tons: Chlorophyll up 3-5 ppm, DO down.5-1 ppm, Light Extinction Events Worsen Greatly, Loss of 7% of SAV

Funk and Bolton TMDL Coalition Due greatly to publicity regarding the effects of increased scouring events and loss of sediment trapping capacity, a Chestertown law firm has taken advantage of this information to promote anti-TMDL action Allegany, Caroline, Carroll, Cecil, Dorchester, Frederick and Kent Counties LSR is working with CBP and MDE to open communications with counties and set up presentations

Solutions Upstream BMP’s: Agriculture, Urban, Transportation, Forestry, Mining, Stream Stabilization, Sediment Trapping Structures, Riparian Buffers, Wetlands, Nutrient Trading Bypassing: Bypass Systems, Modified Dam Operations, Sediment Pass-Through by Lowering Water Levels, Release Turbidity Density Currents (open lower gates), Off-Stream Reservoir, Tunnel Bypass Increase or Recover Sediment Retention Volume: Dam Removal, Enlarge Storage, Sediment Fixing, Floating Islands, Dredging to Maintain Capacity, Complete Dredging, Hydraulic Dredging-Pressure Flushing (opening gates) Innovative Reuse: Island Restoration, Soil Amendment for Agriculture, Soil Amendment for Mining, Lightweight Aggregate, Beach Renourishment, Landfill Cover

Citizen Involvement and Engagement Opportunities Conowingo Relicensing: REA - Environmental Assessment, Maryland State Environmental Certification – LSR can be a resource and representative for CAC PA State and PA Dams: Advocate of state officials for responsibility of PA as a source, and of PA dams as sources Funk and Bolton, Maryland Counties: Advocating/Discussing issues with local elected officials- local LTE’s from local citizens Federal and State Funding of Solutions: As of today, no solution is known that is completely based on free-market profit. Some funding from for-profit entities and taxpayers may be necessary. The options of how this can occur appear to LSR to be through the Conowingo licensing process and federal and state legislation.