Vienna Group Trigger Meeting CERN, 6 Dec. 2005 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.

Slides:



Advertisements
Similar presentations
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
Advertisements

José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
LKr readout: present and future R. Fantechi 30/8/2012.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
1 DAQ Update. 2 DAQ Status DAQ was running successfully and stably in ’07 beam time Trigger bus scheme has proven to be very flexible – Added additional.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
CMS Week Mumbai, Dec Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menus.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
SLHC Meeting CERN, 21 May 2008 Presented by C.-E. Wulz Global Triggers,  TCA Technology M. Stettler, M. Hansen (CERN) C. Foudas, G. Iles (Imperial College)
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
General Tracker Meeting: Greg Iles4 December Status of the APV Emulator (APVE) First what whyhow –Reminder of what the APVE is, why we need it and.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Global Trigger Upgrades for SLHC
TTC signals: Global Trigger and Global Muon Trigger
Status of CMS and the Austrian Contribution to the Trigger System
Project Group CMS Trigger
Darin Acosta University of Florida
Regional Cal. Trigger Milestone: Production & Testing Complete
Trigger issues for the CALICE beam test
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Throttling: Infrastructure, Dead Time, Monitoring
Global Trigger and Global Muon Trigger
Sector Processor Status Report
Global Trigger and Global Muon Trigger Latency
The Trigger Control System of the CMS Level-1 Trigger
Presentation transcript:

Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global Trigger H. Bergauer, Ph. Glaser, M. Jeitler, K. Kastner, B. Neuherz, T. Nöbauer, I. Magrans de Abril, I. Mikulec, M. Padrta, H. Rohringer, H. Sakulin, Th. Schreiner, J. Strauss, A. Taurok, C.-E. Wulz

Trigger Meeting, Dec C. - E. Wulz2 Global Trigger Crate PSB (Pipelined Synchronizing Buffer) Input and Synchronisation GMT (Global Muon Trigger) Global Muon Trigger logic GTL (Global Trigger Logic) Algorithm logic FDL (Final Decision Logic) Level-1 Accept decision GTFE (Global Trigger Frontend) Readout TCS (Trigger Control System Module) Central Trigger Control L1A_OUT (Level-1 Accept Module) Distribution of Level-1 Accept CONV6U (Conversion Boards) Reception of status signals from the subsystems TIM (Timing Module) Timing

Trigger Meeting, Dec C. - E. Wulz3 Final GT/GMT modules FDL PSB In 904 GMT GTFE GTL

Trigger Meeting, Dec C. - E. Wulz4 Final GT modules TCS In 904 CONV6U In 904 TIM In 904 L1AOUT In 904

Trigger Meeting, Dec C. - E. Wulz5 Module Status Name# needed CERN  in Vienna TCS111 L1AOUT211 CONV6U442 PSB712 TIM121 GTL1GTL6U: Dec GTL9U: Apr FDL11 of 2: Jan GTFE11: May (firmware ongoing) GMT11: Dec

Trigger Meeting, Dec C. - E. Wulz6 PSB9U Pipelined Synchronizing Buffer – All 3 available boards are working – Bit error rate tests have been succesful (no bit errors in transfers) – Signal transfer from Global Calorimeter Trigger in principle OK – Problems with wrongly made cables led to delays (and almost ruined a PSB …) now understood – Technical trigger inputs Working with TOTEM Work on scintillator hodoscope min.bias trigger / beam gas veto is planned

Trigger Meeting, Dec C. - E. Wulz7 TCS + L1AOUT PSB Trigger Control System + Output Module Pipeline Synchronizing Buffer Timing Board TIM Global Calorimeter Trigger Integration Tests with Global Calorimeter Trigger

Trigger Meeting, Dec C. - E. Wulz8 Global Muon Trigger Logic Board Status: Sent to CERN today! GMT Module has been commissioned in Vienna Chips redesigned for CAEN controller One remaining error, which will be solved by a new chip on new mezzanine board: one muon always gets same charge. Further tests are planned with spares in Vienna Software integration is under way Planned integration tests at CERN in 904 (Dec Feb. 2006): –RPC LB-TB-Sort-GMT –CSC-TF-GMT –DTSC-DTTF-Sort-GMT

Trigger Meeting, Dec C. - E. Wulz9 GTL, FDL and GTFE GTL9U – Board is produced. Commissioning has started in Vienna. FDL – Available for some time. Needed in Vienna for tests with GTL9U. GTFE – Board is produced. – Basic electrical tests OK. – Commissioning has started. Fast Monitoring Module (FMM) – responsible: CERN – Communication with Global Trigger OK – Software development: Hannes Sakulin

Trigger Meeting, Dec C. - E. Wulz10 Trigger Control System and Timing Trigger Control System (TCS) is operational – Software integration into Trigger Supervisor TIM modules are operational Global Clock (TTC) is running – responsible: CERN – Trigger output goes to TTCci module, under test – locale distribution by Vienna TIM module Emulators – responsible: Imperial College, London – Communication with Global Trigger OK – continue to work on firmware Fast Monitoring Module (FMM) – responsible: CERN – Communication with Global Trigger OK – Software development: Hannes Sakulin

Trigger Meeting, Dec C. - E. Wulz11 Test Schedule n Ongoing in 904: TCS, PSB input board, TTC – Trigger Control System validation – Test with Global Calorimeter Trigger – Test with TTC n Jan. - March 2006: GTL6U, FDL – test logic and trigger decision n From Dec. 2005: GMT – test with other muon subsystems n Jan. - March 2006: preparation for magnet test and Cosmic Challenge n From Apr. 2006: GTL n From May 2006: GTFE

Trigger Meeting, Dec C. - E. Wulz12 Summary At least one board of all Global Trigger modules exists. Tests in building 904 are ongoing. Software development efforts are reinforced. GUIs for trigger setup and operation exist. Participation in the cosmic challenge during the magnet test is prepared. Latency has been verified.