PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection.

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Path to your Energy Savings Existing Residential and Small Commercial.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Resource Adequacy in PJM
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
When Grids gets smart Claes Rytoft Senior Vice President ABB World Forum on Energy Regulation IV Athens, Greece October , 2009.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
Eastern Wind Integration and Transmission Study
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Eastern Wind Integration and Transmission Study Overview January 28 th Webinar Dave Corbus National Wind Technology Center National Renewable Energy Lab.
11 TAG Meeting May 18, 2010 ElectriCities Office Raleigh, NC.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Increase electric power flow in existing transmission lines, instead of building new lines Kalyan Sen, Ph.D., P.E. 16 June, 2009 Washington,
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Production Cost Model Fundamentals
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Network Customer Meeting Access Metric Update November 16, 2006.
New Jersey’s Clean Energy Program: Solar Market Update Charlie Garrison Solar Transition Meeting 2/16/2012.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Cork June Dynamic modelling of transmission systems: costs of seasonal-zonal transmission loss factor charging and the impact of large-scale offshore.
Assistant Secretary of the Navy (Energy, Installations & Environment) 1 Department of the Navy Renewable Energy Program Office (REPO) Overview Monica DeAngelo.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Wind Generation in New Zealand Kieran Devine, Doug Goodwin System Operations Transpower New Zealand Limited.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
1 Our Blueprint for the Future Gary Stockbridge President, Delmarva Power Region.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
October 26, 2005 ICF Consulting RGGI Electricity Sector Modeling Results RPS Sensitivity & Very High Emissions Reference and Package Cases.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
PJM©2014www.pjm.com State of Demand Response Stu Bresler Vice President- Market Operations PJM Interconnection 10 th OPSI Annual Meeting October 13, 2014.
ERCOT – MISO DC Tie Study Regional Planning Group November 20, 2015.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Minnesota Renewable Energy Integration and Transmission
RENEWABLES AND RELIABILITY
Contents Introduction Focus area Wind scenarios
Mike Jaske California Energy Commission
Restructuring Roundtable March 24, 2017 Boston, MA
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Transmission Planning at PJM Interconnection LLC
Additional clarifications on economic and adequacy running hours
Appendix: 2017 RTEP Report Key Graphics and Information
RE Grid Integration Study with India
New England Electricity Restructuring Roundtable September 18, 2009
2018 RTEP Report Key Maps, Tables & Figures
Gordon van Welie, President & Chief Executive Officer
Presentation transcript:

PJM©2012 Offshore Wind Integration Studies at PJM September 13, 2012 Steven Herling Vice President, Planning PJM Interconnection

PJM© RTEP - Conceptual Offshore Wind Study Reliability + Market Efficiency Entirely Offshore Wind Injected at 4 locations –Hudson, Larrabee, Indian River, Fentress 4 Scenarios –No wind –10 GW, 20 GW, 30 GW Conclusion –Market efficiency simulated almost no wind curtailment at 10GW peneteration. –Moderate curtailment at 20GW penetration –Major curtailment at 30GW penetration

PJM© RTEP RPS Scenario Studies Satisfy RPS needs with PJM resources Multiple sourcing scenarios for ~ 40 GW total of wind –20 GW offshore –4 GW offshore Study identified congestion at the injection points that would require significant transmission investment.

PJM© RTEP Analysis

PJM© RTEP Building off the work done in the 2011 RTEP Evaluating three sourcing scenarios to meet PJM RPS requirements in 2027 –36 GW wind and 3.6 GW solar –Scenario 1 – source all RPS from within PJM with 7 GW offshore wind and 29 GW from land-based wind –Scenario 2 – source all RPS from land-based resources –Scenario 3 – wind sourced 60% internal to PJM and 40% from MISO / SPP

PJM© RTEP – Preliminary Analysis Purpose –Initial modeling and analyses focused on validating the ability of the production cost simulation tools to model a system similar to the AWC project including offshore wind resources interconnected via HVDC. –Leveraged modeling and analysis done as part of the 2011 RTEP

PJM© Preliminary set of PROMOD runs using last year’s base case: Study year 2016 PJM Deactivations not modeled 2011 RTEP power flow case (no MAPP, PATH) Gas forecast: Henry Hub ~7 $/MMBtu HVDC Terminals & Wind Injection Points: Hudson1 (PSEG) Cardiff (Atlantic Electric) Indian River (DP&L) Navy (Dominion) Offshore wind profile parameters (NREL data) : CF 47% Annual Total Energy ~16,401 GWh for 4000 MW nameplate HVDC lines modeled with no losses, no operating restrictions. Input Assumptions

PJM© IdxScenario Description AWC Wind Install Cap (MW) Topology Comments HudsonCardiffIndRivNavy HVDC Offshore Radial Lines AWC00 Base Scenario No HVDC Offshore, No radial lines No Wind No Base Scenario AWC01 Base Scenario with HVDC Offshore No Wind YesNo Shows the impact of HVDC lines even without wind injections. AWC02 Hudson 4000MW Scenario with HVDC Offshore 4000MW Hudson 4,000 YesNo 4000MW wind installed at Hudson AWC03 Cardiff 4000MW Scenario with HVDC Offshore 4000MW Cardiff 4,000 YesNo 4000MW wind installed at Cardiff AWC04 4 x 1000MW Scenario with HVDC Offshore 4 x 1000MW Wind 1,000 YesNo 1000MW wind each at Hudson, Cardiff, Indian River, and Navy AWC05 Hudson 4000MW Scenario radial line into Hudson 4000MW Hudson 4,000 NoYes Same as Scenario AWC02, no HVDC lines AWC06 Cardiff 4000MW Scenario radial line into Cardiff 4000MW Cardiff 4,000 NoYes Same as Scenario AWC03, no HVDC lines AWC07 4 x 1000MW Scenario radial lines 4 x 1000MW Wind 1,000 NoYes Same as Scenario AWC04, no HVDC lines 1. The Market Efficiency scenarios for this study were derived from last year's interregional base case. AWC Scenarios Overview

PJM© Offshore Flows – HVDC Tie Flows

PJM© Results shows that the flows going onshore, out from the HVDC terminals, are indifferent to the wind injection point - PROMOD yields the optimal onshore injection pattern no matter of the particular position of the wind farm on the HVDC. Indian River appears to be the preferred injection point - may be a factor of the number of flow gates (or lack thereof) modeled for Delmarva peninsula. There is no wind curtailment, the wind profile is used at full capacity. Flows from Navy HVDC terminal always heavy into the HVDC line, going north. The total net flows toward shore, in the base case, is not zero, due to a small amount of bus load at the injection points. Onshore Flows (Net Flow from HVDC terminals)

PJM© The charts show the incremental LMP impact (On-Peak and Off-Peak) of adding the stand-alone HVDC system to the Base Case, then adding the Offshore Wind to the HVDC System. LMP Impacts

PJM© LMP Impacts – Radial Injection vs. HVDC

PJM© LMP Impacts – Radial Injection vs. HVDC

PJM© Update modeling consistent with 2012 RTEP Assumptions  Footprint includes PJM, MISO  2017 updated power flow topology  Updated Gas forecast: Henry Hub ~4.9 $/MMBtu  PJM Announced Deactivations  Installed Renewable Resources consistent with the RPS requirements of PJM states. Consider the states request requirements:  7000MW Offshore Wind  AWC HVDC System modeled as controllable system to optimize the wind injection.  Study year 2023  Customized outputs reports by state: production cost savings; avoided congestion savings; pollution reduction benefits, etc. Next Steps

PJM© RTEP – 7GW Radial Injection

PJM© RTEP – 7GW Offshore with HVDC Interconnection

PJM© Offshore Wind Joint Study – NCTPC PJM is also engaged in a joint study with the North Carolina Transmission Planning Collaborative. Evaluating three scenarios –1000 MW injection at Landstowne, Morehead City and Southport –2000 MW injection at Landstowne and 1500 MW injection at Morehead City and Southport –4500 MW injection at Landstowne and a 3500 MW injection at Morehead City and a 2000 MW injection at Southport Reliability analysis of the three scenarios is in-progress