Beam injection and kicker KEK H. Iinuma and H. Nakayama I’ll talk about this part We measure Muon precession  1000  1 mission (a)Smooth injection without.

Slides:



Advertisements
Similar presentations
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Advertisements

The Rare RI Ring Facility at RIKEN RI Beam Factory M. Wakasugi, and Rare RI Ring Collaborators RIKEN, Nishina Center, Japan ARIS2014.
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
Akihisa TOYODA, KEK. Outline g-2/EDM beamline Final Focus(FF) optimization Requirements Option 1: 1-Solenoid case Option 2: 3-Quads case Option 3: 1-Solenoid.
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
M. LindroosNUFACT06 School Accelerator Physics Transverse motion Mats Lindroos.
SLIDE Beam measurements using the MICE TOF counters Analysis meeting, 23 September 2008 Mark Rayner.
V.Daniel Elvira Status Report on Cooling Simulations using GEANT4 Motivation: Explore a realistic design of a 44/88 MHz based cooling channel for a -factory.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Wilson Lab Tour Guide Orientation 11 December 2006 CLASSE 1 Focusing and Bending Wilson Lab Tour Guide Orientation M. Forster Mike Forster 11 December.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
June 21, 2005 S. Kahn -- Small Muon Cooling Ring1 Small Muon Ring for a Cooling Demonstration Steve Kahn For S. Kahn, H. Kirk, A. Garren, F. Mills and.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Magnet Issues Steve Kahn OleMiss Workshop Mar 11, 2004.
PV-DIS Toroid Detector: outline and costs Paul E. Reimer 12 GeV PV-DIS detector meeting August 1.Introduction to Toroid Concept (presenting work.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
S. Kahn 5 June 2003NuFact03 Tetra Cooling RingPage 1 Tetra Cooling Ring Steve Kahn For V. Balbekov, R. Fernow, S. Kahn, R. Raja, Z. Usubov.
Mark Rayner 14/8/08Analysis Meeting: Emittance measurement using the TOFs 1 Emittance measurement using the TOFs The question: can we use position measurements.
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
6-D dynamics in an isochronous FFAG lattice e-model Main topic : Tracking code development : 3-D simulation of the field in an isochronous FFAG optics.
B Grants-in-aid KIBAN-B (FY2014~) Magnetic Dipole Moment g-2 Electric Dipole Moment EDM Utilize high intensity.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Linear Imperfections equations of motion with imperfections: smooth approximation orbit correction for the un-coupled case transfer matrices with coupling:
By Verena Kain CERN BE-OP. In the next three lectures we will have a look at the different components of a synchrotron. Today: Controlling particle trajectories.
2 July 2002Realistic Fields for a Ring Cooler Magnet System -- S.Kahn Page 1 Realistic Fields for a Ring Cooler Steve Kahn 2 July 2002 NuFact’02 Meeting.
Quiz 1 Borderline Trouble Deep Trouble.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Simulating the RFOFO Ring with Geant Amit Klier University of California, Riverside Muon Collaboration Meeting Riverside, January 2004.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Jin Huang BNL/LANL. ePHENIX Review J. Huang 2 RICH GEM Station4 EMCal HCal GEM Station2 R (cm) HCal p/A EMCal GEMs EMCal & Preshower TPC DIRC η=+1 η=
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
Numerical Simulations for IOTA Dmitry Shatilov BINP & FNAL IOTA Meeting, FNAL, 23 February 2012.
J-Parc Neutrino Facility Primary Proton Beam Design A. K. Ichikawa(KEK), Y.Iwamoto(KEK) and K.Tanabe(Tokyo) et.al. 7 th Nov. 2003,
1 Muon g-2 Experiment at BNL Presented by Masahiko Iwasaki (Tokyo Institute of Technology) Akira Yamamoto (KEK) for E821 g-2 Collaboration: Boston, BNL,
April 17, Dejan TrbojevicFFAG07 -Non-Scaling FFAG gantries1 Non-Scaling FFAG Gantries Introduction: Motives: The most challenging problem in the carbon/proton.
Simulation of Particle Trajectories for RIKEN Rare-RI Ring Nishina Center, RIKEN SUZUKI Hiroshi Nov. / 11 / 2011.
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
Oleksiy Dolinskyy 1st December, 2014
TPS pulse magnet measurement
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Study of Beam Properties at SECRAL and The Solenoid Pre-focusing LEBT
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Beam Injection and Extraction Scheme
Strip-line Kicker R&D at KEK-ATF
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
I Alexander Nass for the JEDI collaboration
6-D dynamics in an isochronous FFAG lattice e-model
Summary & Concluding remarks
Pulsed Sextupole Injection for Beijing Advanced Photon Source
IR Lattice with Detector Solenoid
Alejandro Castilla CASA/CAS-ODU
Presentation transcript:

Beam injection and kicker KEK H. Iinuma and H. Nakayama I’ll talk about this part We measure Muon precession  1000  1 mission (a)Smooth injection without error field in the storage volume (b)Storage orbit’s plane should be stable <0.01mrad (c)Beam at storage volume ~few 10  m-rad TODAY 2014/11/71 (Assuming EDM ~ 1e-19 e.cm)

Image of beam injection into the storage volume 2014/11/72 Upper plate (pure iron) Return yoke (pure iron, cylindrical shape) Pole tip (pure iron) Main coil  + beam ¼ model (OPERA) From LINAC & transport line Super conductive solenoid magnet Main field 3 T 3m in height Outer radius of iron yoke; 2m Tunnel Today’s main topic: Stop the vertical motion by the kicker to storage into the weak focusing field Injection volume: Review briefly in the next page. Details are shown in slide from CM8 See slides from CM8 I also talk about the status of preparation of the e-gun test beam line, too!

Tunnel region y=110cm y~35cm 3~4 turns Stop vertical motion by the Kicker and storage into the weak focus field 3 y=82cm ~0 [T] 0.14 [T] Star mark : Exit of tunnel ByBy BRBR 2014/11/7 Review trajectories in the injection volume

2014/11/7 Target :n=1.5E-4 n>0 :focus vertically (solenoid axis) n<1: focus radially we apply weak focus 4 rr y y ByBy BRBR Focus both direction at a time!! Simple harmonic motion ideal 4

Simple harmonic motion in the design field Abe-san tool FLDATA txt Simulate particle motion with RK4 Field at particle position is calculated from surface current distribution no grid field, that is, smooth field!!  0.3mrad 3  E-6[rad-m]  10mm Simple harmonic motion volume Kick!! 2014/11/75 Zoom up

Required kicker field 6 Id#  (ns) T(ns)B peak (gauss) 1(sin) (sin)∞ (half) (half)∞4803 5(half)∞ Pulsed axisymmetrically-excited field I am trying 5 types of sin and half-sin shapes. This study does not include spatial distribution B peak (=const.). Zoom up possible 2014/11/7

More typ#2 (sine shape) 2014/11/77  0.3mrad  10mm A)In case we use typ#2 kicker, vertical size of storage beam is ~ 3  E-6[m-rad]. B)As long as the weak focus field is stable, storage orbit’s plane should also be stable. C)Envelope of required vertical beam shape, at the kick point (y~35cm), is shown. D)I have confirmed “inverse trajectories” from y~35cm went out through tunnel.

Storage orbit’s plane 2-D orbit 8 Kicker (review) 2014/11/7 Pulsed current Pulsed Radial field ; B kick (t)=B peak  sin(  t)  exp(-t/  )  =  /T kick T kick ~500nsec Peak field B 0 ~2 gauss 2pairs of coil, pulsed high current I(t)=I peak  sin(  t) I peak  100A/coil B kick (t) axisymmetrically-excited field Vertical Kick

Spatial field distribution: design vs. measurement Solenoid and radial axes 2014/11/7 Measure pulsed field by pickup coil Uncertainty for each point is from reading fluctuation of oscilloscope mV 1 Gauss 2 Gauss y 2012/8/3 Signal from pickup coil (differential amplifier+ integrator) Current transfer Inner and outer coils 300nsec High current supply I(t)=I peak  sin(  t) I peak  100A/coil 9 (Review)

~190 ㎝ image Status report of the test beam line LINAC Mini solenoid magnet E-gun Grant-in-aid KIBAN-B momentum 112KeV/c Beam line height 90cm from the floor Beam line length 2m Height of top of solenoid magnet ~190cm 2014/11/710

新規製作 の架台 Example shot in Argon gas. Parameter comparison Strong points! 1.1/3 scale but, we install weak focus and kicker system 2.We fill Argon gas in the storage chamber. We can directly see the beam trajectory! 3.Electrons circulate inside storage volume forever!! 2014/11/711

Magnet Collimator inside camera By the end of FY keV e - Fluorescent plate Faraday cup By the end of FY2014 Vacuum check for the e-gun and chambers are done. HV-check of e-gun is now ongoing. We will have the first beam in the next week!!! 2014/11/712

Status of the electron-gun preparation 2014/11/713 Vacuum check is done, HV check including interlock is almost done,  Need some works for cathode,  We will have the first beam very soon! 110kV

Status at vacuum 2014/11/714 home made coil winder coil pole Vacuum check is done, Coil wind work for bend magnet is ongoing,  Vacuum system will move to the beam line on the next Monday.  And then, connect with the electron-gun.

3-D injection BOYS 2014/11/715

Summary and next 2016 Kicker install start studying of storage the beam 2017 Optimize the efficiency 2014 beam line preparation warm-up the e-gun fabricate the mini-solenoid magnet 2015 Injection commissioning Shall we do it now? I.Goal of Injection and kicker Beam phase space ~ several× E-6 [rad-m] at the storage volume Storage orbit’s plane should be stable <0.01[mrad] (Achieve sensitivity of EDM 100 times better!) II.Design of the weak focus field and kicker field are shown Kicker typ#2 can be possible candidate (B peak ~2 gauss) Possible vertical beam size at the storage volume is ~3  E-6[m-rad] (ref: beam size at the exit of LINAC is 1.5  E-6 [rad-m] ) III.Status report of the test beam line We will have the first beam in the next week! IV.NEXT Spatial distribution should be included in the kicker simulation Go through entire simulation from the beam transport line to the storage volume Outline of test experiment 2014/11/716

backups 2014/11/717

Basic concept of 3D spiral Injection BRBR Main soleno id coil Solenoid-axis (Z-axis) Main solenoid coil BZ: Solenoid axis component BR: radial component Z Decide injection angle  as a function of solenoid-axis; Z  Design specific magnetic field along the trajectory.  ?  beam  Radial field B R deflects beam direction and changes  Utilize fringe field Solenoid field  axial symmetry, Inject beam from upward Utilize fringe field, Storage beam in center region of solenoid field. Motion in the magnetic field : Momentum is constant 2014/11/718

LINAC EXIT Beam from LINC: 1.5  E-6 [rad-m]  =0,  =10 Monitor install? free space 28cm Bend 12.5  Storage magnet 8.8m Not just a transport line. But we need to apply a proper X-Y coupling to beam. We need several skew quadruple magnets. In this design, we use 8 (small) skews. Transport line from LINAC EXIT to storage magnet Ver. 2014May Apply X-Y couplingFree drift LD=350cm Bend beam and control dispersion zero Free drift LD=350cm 2014/11/719

Transfer MATRIX of Transport line M M is transfer matrix of between point 1 and 2 D is Sectional Diagonal matrix (?) A and B are 2×2 Matrices U 1 and U 2 are rotation matrix at point 1 and 2 (4×4 Matrix) 0 A 1 2 2×2 matrix A and B are related to twiss parameters  1 and  1 are given value from LINAC Rotation matrix Eight FREE parameters:  2,  2 (for x and y components), R 1 ~R /11/7

 0.3mrad  0.3cm  =  E-6[m-rad]  =0,  =10 2K samples Transfer matrix Injection point y=150cm 21 LINAC EXIT Tunnel Entrance Red lines show X-Y coupling, x-x’ and y-y’ correlations x-x’ y-y’ x-y x’-y’ 1cm x-x’ y-y’ x-y x’-y’ 10mrad M NO X-Y correlation X-Y correlation /11/7

Rough estimation of acceptable error field 2014/11/722 Kick point 2 nd rotation 1 st rotation Orbit base plane 1 st turn 2 nd turn 3 rd turn m th turn Cross- section view If we request  y <2cm for 100 turns, If we request  x <5mm for 7000 turns