November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.

Slides:



Advertisements
Similar presentations
4.1/9.1m L* Optics & Performance Glen White, SLAC SiD Meeting, SLAC Jan 13, 2015.
Advertisements

Question from the GDE : Could local “doughnut” type muon spoilers like those in SLC be substituted for the 5 meter magnetized wall? 5m magnetized wall.
January 11, 2007 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Andrei Seryi, Hitoshi Yamamoto.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
8-Nov-06 GDE Valencia Global Design Effort 1 MDI Related Potential Design Changes Barry Barish Caltech / GDE 8-Nov-06.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
Beam Delivery, MDI related updates Andrei Seryi for BDS Area GDE/LCWS meeting at Bangalore March 10, 2006.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
Philip Burrows MDI session, LCWS06 Bangalore, 10/3/06 SiD MDI Issues Philip Burrows John Adams Institute Oxford University Thanks to: Marty Breidenbach,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010.
ILC MDI Andrei Seryi JAI with input from many colleagues working on MDI IWLC
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 20, 2006 Global Design Effort 1 Process of change of BDS baseline to 14/14 configuration BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto,
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Photon collider: ILC configuration and IR issues ( how to make 14mr compatible with gamma-gamma) Valery Telnov Budker INP IRENG07, Sept.18, 2007, SLAC.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
November 07, 2006 Global Design Effort 1 Beam Delivery System / Machine Detector Interface BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Philip Burrows SiD Meeting, SLAC 27/10/06 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
ILC-GDE Meeting Beijing Feb Effect of MDI Design on BDS Collimation Depth Frank Jackson ASTeC Daresbury Laboratory Cockcroft Institute.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
Beam Delivery configuration materials to start discussion Andrei Seryi, Deepa Angal-Kalinin, Hitoshi Yamamoto BDS area GDE meeting at KEK, January 19-20,
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
BDS Status Update Glen White, SLAC July ADI Fuze Meeting.
Accelerator WG 5 summary Interaction region, ATF2 and MDI Deepa Angal-Kalinin, Lau Gatignon, Andrei Seryi, Rogelio Tomas IWLC
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
Beam Delivery System Summary Andrei Seryi LCWS 2010 / ILC 2010 March 30, 2010.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
ILC Interaction Region and Machine Detector Interface
Beam Delivery update Andrei Seryi December 12, 2005
AD & I : BDS Lattice Design Changes
ILC BDS Emittance Diagnostics: Design and Requirements
Updates on IR and FF for super-B factory
Beam Delivery System Schedule at ILC2010
Extract from today’s talk given to DCB
BDS civil construction Single IR upgrade scenarios discussion
Final Focus optics for Possible New B-Line
NLC 2001 Beam Delivery Layout
Push-pull cryo configuration C
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE meeting, November 6-10, 2006

November 07, 06 Global Design Effort BDS: 2 Contents Design and cost evolution –on-surface detector assembly –reduced muon walls –CFS design changes Muon protection: walls/doughnuts Single IR case

November 07, 06 Global Design Effort BDS: 3 Valencia 14/14 baseline. Conceptual CFS layout IP2 IP1 10m 1km beam dump service hall alcoves 9m shaft for BDS access polarimeter laser borehole muon wall tunnel widening

November 07, 06 Global Design Effort BDS: 4 CFS designs for two IRs Valencia Vancouver

November 07, 06 Global Design Effort BDS: 5 beam dump service hall alcoves 9m shaft for BDS access & service hall beam dump and its shield muon wall tunnel widening Beam Delivery System tunnels

November 07, 06 Global Design Effort BDS: 6 Muon walls Valencia configuration: single 5m wall per beamline, tunnel spaces for full set of 18m & 9m walls in each beamline Muon walls installed in a tunnel widening which provide passage around the wall Purpose: –Personnel Protection: Limit dose rates in one IR what beam sent to other IR or to the tune-up beam dump –Physics: Reduce the muon background in the detectors

November 07, 06 Global Design Effort BDS: 7 5m  -wall vs 11 doughnuts 4m long magnetized doughnut Condition R=6.5 m detector; 1 bunch R=2.5 m TPC ; 200 bunches R=2.0 m PC 160 bunches 5 m long magnetized wall fills tunnel at 349 m, 2m concrete wall – MARS 13 (3)387 (152)192 (74) 11, 4 m long “doughnuts” same polarity, 1 m unmagnetized wall – Lew, 2m concrete wall – MARS 8 (9.6) (all same sign) 847 (1268) (all same sign) 448 (646) (all same sign) 11, 4 m long “doughnuts” alternating polarity, 1 m unmagnetized wall L.Keller, N.Mokhov, N.Nakao, S.Striganov Similar performance as for 5m  -wall is achieved with 11 doughnuts + 1m wall (better for whole detector, worse for TPC, see table) The volume of iron is about the same for 5m wall and the doughnuts set. (=>No obvious cost saving). MDI issues also require further studies. Plan – leave this option for TDR study

November 07, 06 Global Design Effort BDS: 8 Single IR BDS design Start to IP, mCapabilities Post Vancouver 14/ TeV CM Single IR, 2006d2062 (-488)Upgradeable to 1TeV CM with removal of linac and lengthening of straight part, and adding magnets Single IR, 2006e2225 ( )Upgradeable to 1TeV in the same layout, only with adding magnets

November 07, 06 Global Design Effort BDS: 9 1 TeV CM capable BSY: 500 GeV CM max; FF: upgradeable to 1 TeV with adding magnets & lengthening upgradeable to 1 TeV CM in same layout, with adding magnets ΔZ = +488 m ΔZ = +163 m M.Woodley, et al.

November 07, 06 Global Design Effort BDS: 10 QFSM1 moves ~0.5 m polarimeter chicane septa fast kickers “Type B” (×4) M. Woodley 500GeV => 1TeV CM upgrade in BSY of 2006e M.Woodley, et al.

November 07, 06 Global Design Effort BDS: 11 polarimeter chicane skew correction / emittance diagnostic MPS coll betatron collimation fast sweepers tuneup dump septa fast kickers 2006e, BSY region M.Woodley, et al.

November 07, 06 Global Design Effort BDS: 12 Performance risks in 2006d Critical performance – achieved size of laser wires that are used for beam measurements and tuning the BDS In baseline design so far the assumption was: –laser spot size is 1micron (very aggressive) to be achieved at 1TeV CM (for DR emittance), after a lot of work done in 500GeV CM In 2006d, assume 1micron laser size at 500GeV CM (DR emittance)  performance risk –1.4 micron in 2006e is closer to performance expectations Needless to say about real difficulties of E upgrade

November 07, 06 Global Design Effort BDS: 13 Cost difference of 2006e and 2006d 2006e is 2225m from start to IP, or by 163m longer than 2006d In this 163m, have the same magnets, instrumentation, etc., as in “d” Additional cost in “e” is vacuum chamber and tunnel itself and for 2*163m the total additional cost is small Suggestion – although “d” is shorter, the cost saving are small and may not worse the increased performance risk Plan to use 2006e for next round

November 07, 06 Global Design Effort BDS: 14 B.Parker, Y.Nosochkov et al. (see ref for details) In further discussion realized that this connection should not be used, to allow quick move The QD0 part of cryostat will be connected to part of cryo system (2K) attached to detector

November 07, 06 Global Design Effort BDS: 15 warm smaller detector larger detector smaller L* larger L* common cryostat QD0 QF1 vacuum connection & feedback kicker

November 07, 06 Global Design Effort BDS: 16 B.Parker, Y.Nosochkov et al. (see ref for details) Rearranged extraction quads are shown. Optics performance is very similar. Both the incoming FD and extraction quads are optimized for 500GeV CM. In 1TeV upgrade would replace (as was always planned) the entire FD with in- and outgoing magnets. In this upgrade, the location of break-point may slightly move out. (The considered hall width is sufficient to accommodate this). Nominal scheme Push-pull scheme New optics for extraction FD

November 07, 06 Global Design Effort BDS: 17 QD0 partQF1 part door central part Optimized for fast switch of detectors in push-pull and fast opening on beamline This scheme require lengthening L* to 4.5m and increase of the inner FD drift Opening of detectors on the beamline (for quick fixes) may need to be limited to a smaller opening than what could be done in off-beamline position Push-pull cryo configuration C

November 07, 06 Global Design Effort BDS: 18 Detector sizes & opening on beamline GLD SiD (opened) 2m Since opening of detectors on the beamline is intended only for quick fixes, the required width for opening may be smaller that for opening off- beamline

November 07, 06 Global Design Effort BDS: 19 FD with L*=4.5m & lengthened warm drift section by +0.7m Detector opened on beamline (GLD opening reduced to 1.5m) still leaves 0.5m of not- overlapped space for config.C

November 07, 06 Global Design Effort BDS: 20 Single BDS & central DR